Revised Proposed Tech Spec Page 3/4.6-15,Table 3.6.3-1 Re Primary Containment Isolation Valve Temporary Time Limit Change
ML20134M634
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/29/1985
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20134M632 List:
References
NUDOCS 8509040199
Download: ML20134M634 (1)


Text

,

(BSEP-2-74)

N h

TABLE 3.6.3-1 (Continued)

$p PRIMARY CONTAINMENT ISOLATION VALVES i.

ISOLATION TIME

.e VALVE FUNCTION VALVE CROUP 1j (Seconds)

H l

N HPCI' steam line isolation valves 4

50*

'E41-F002 E41-F003 HPCI torus suction isolation valves 4

80 E41-F042 E41-F041 RCIC steam line isolation valves 5

20 E51-F007 7~

w E51-F008

sc.

Drywell purge exhaust backup valve 6

15 os J,

CAC-V10 s.n Containment air purge. isolation valve 6

15 CAC-V15 Suppression chamber vent valve 6

15 CAC-V22 Drywell purge exhaust backup valve bypass valve 6

15 CAC-V23 Suppression chamber makeup and containment atmosphere 6

15 dilution inlet valve CAC-V47 W

Drywell makeup and containment atmosphere dilution'

.6 15 g.

inlet valve c

CAC-V48 5

F l.

See Specification 3.3.2, Table 3.3.2-1 for isolation signal that operates each valve group.

The isolation time for valve E41-F002 may be increased to 55 seconds until Reload 6 for Cycle 7 or until:an outage of sufficient duration to fix the valve at which time it will be returned to 50 seconds.

4 i

PDR 3