ML20080P358

From kanterella
Jump to navigation Jump to search
Revised Proposed Tech Spec Changes to Rod Control Sys
ML20080P358
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/17/1984
From:
ALABAMA POWER CO.
To:
Shared Package
ML20080P344 List:
References
NUDOCS 8402220516
Download: ML20080P358 (3)


Text

_ _ _

l Attachment 2 Proposed Changes to Technical Specification Pages Unit 1 3/4.1-14 Unit 2 3/4.1-14 8402220516 840217 PDR ADOCK 05000348 P PDR

l REACTIVITY CONTROL SYSTEMS l

3/4.1.3 MOVABLE CONTROL ASSEhBLIES GROUP HEIGHT LIMITING CONDITION FOR OPERATION 3.1.3.1 All full length (shutdown and control) rods shall be OPERABLE and positioned within + 12 steps (indicated position) of their group step counter demani position.

APPLICABILITY: MODES 1* and 2*

ACTION:

a. With one.or more full length rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN requircnent of Specification 3.1.1.1 is satisfied within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />,
b. With more than one full length rod misaligned from the group step counter demand position by more than 112 steps (indicated position), be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
c. With more than one full length rod trippable but inoperable for greater than 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />, be in HOT STANDBY within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
d. With one full length rod inoperable due to causes other than addressed by ACTION a, above, or misaligned from its group step l counter demand height by more than + 12 steps (indicated position),

POWER OPERATION may continue provided that within one hour either:

1. The rod is restored to OPERABLE status within the above alignment requirements, or
2. The remainder of the rods in the group with the inoperable rod are aligned to within + 12 steps of the inoperable rod within

( te hour while maintaining the rod sequence and insertion limits of Figures 3.1-1 and 3.1-2; the THERMAL POWER level shall be restricted pursuant to Spacification 3.1.3.6 during subsequent operation, or

3. The rod is declared inoperable and the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied. POWER OPERATION may then continue provided that:

a) A reevaluation of each accident analysis of Table 3.1-1 is perfonned within 5 days; this reevalution shall confim that the previously analyzed results of these accidents remain valid for the duration of operation under these conditions.

  • See Special Test Exceptions 3.10.2 and 3.10.3 FARLEY-UNIT 1 3/4 1-14 AMENDMENT N0.

l

  • REACTIVITY CONTROL SYSTEMS 3/4.1.3 MOVABLE CONTROL ASSEMBLIES GROUP HEIGHT LIMITING CONDITION FOR OPERATION 3.1.3.1 All full length (shutdown and control) rods shall be OPERABLE and positioned within + 12 steps (indicated position) of their group step counter demani position.

APPLICABILITY: H0 DES 1* and 2*

ACTION:

a. With one or more full length rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b. With nore than one full length rod misaligned from the group step counter demand position by more than 112 steps (indicated position), be in H0T STANDBY within G hours.
c. With more than one full length rod trippable but inoperable for greater than 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />, be in HOT STANDBY within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
d. With one full length rod inoperable due to causes other than addressed by ACTION a, above, or misaligned from its group step counter demand height by more than + 12 steps (indicated position),

POWER OPERATION may continue provided that within one hour either:

1. The rod is restored to OPERABLE status within the above alignment requirements, or
2. The remainder of the rods in the group with the inoperable rod are aligned to within + 12 steps of the inoperable rod within one hour while maintaining the rod sequence and insertion limits of Figures 3.1-1 and 3.1-2; the THERMAL POWER level shall be restricted pursuant to Specification 3.1.3.6 during subsequent operation, or
3. The rod is declared inor-?rable and the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied. POWER OPERATION may then continue provided that:

a) A reevaluation of each accident analysis of Table 3.1-1 is performed within 5 days; this reevalution shall confirm that the previously analyzed results of these accidents remain valid for the duration of operation under these conditions.

  • See Special Test Exceptions 3.10.2 and 3.10.3 FARLEY-UNIT 2 3/4 1-14 AMENDMENT NO.

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _