ML20126M266

From kanterella
Jump to navigation Jump to search
Revised Proposed Tech Spec Page 3/4 3-35,Table 3.3-9, Remote Shutdown Monitoring Instrumentation, Replacing Es Switchgear Room W/Remote Shutdown Panel as Readout Location
ML20126M266
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/17/1985
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20126M220 List:
References
NUDOCS 8506200275
Download: ML20126M266 (1)


Text

r mmN d

5!

r-3tta 3

m jj TABLE 3.3-9 m

REMOTE SHUTDOWN MONITORING INSTRUMENTATION 1

C h

MINIMUM READOUT MEASUREMENT CHANNELS w

INSTRUMENT LOCATION RANGE OPERABLE 1.

Reactor Trip Breaker CRD switchgear room open-close I per trip breaker and Indication 124 foot elevation 1 per secondary trip breaker 2.

Reactor Coolant Remote shutdown panel 320-6200F 1 per loop Temperature - Th 3.

Reactor Coolant Pressure Remote shutdown panel 0-2500 psig 1

5 4.

Pressurizer Level Remote shutdown panel 0-320" H O 1

2 5.

Steam Generator Pressure Remote shutdown panel 0-1200 psig 1 per steam generator 6.

Steam Generator Level 4160 ES-B switchgear 0-250" H O 1 per steam generator 2

room 108 foot elevation 7.

Decay Heat Removal Remote shutdown panel 0-3000F 1 per cooler Temperature 8.

Motor Driven Emergency Intermediate Building 0-2000 psig 1 per pump Feedwater Pressure 95 foot elevation 9.

Nuclear Services Closed Auxiliary Building 0-300 psig 1

CycleCooling Pumps 95 foot elevation Discharge Pressure

10. Nuclear Services Closed Auxiliary Building 0-2500F 1 per cooler Cycle Cooling Cooler 95 foot elevation Outlet Temperature i

-