ML20073T190

From kanterella
Jump to navigation Jump to search

Revised Proposed Tech Specs Changing Upper Head Injection Accumulator Automatic Isolation Setpoints to Incorporate Revised Setpoint Calculation
ML20073T190
Person / Time
Site: McGuire, Mcguire  
Issue date: 05/04/1983
From:
DUKE POWER CO.
To:
Shared Package
ML20073T175 List:
References
TAC-51383, TAC-51384, NUDOCS 8305100390
Download: ML20073T190 (1)


Text

W

/*

/

EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) b.

At least once per 31 days and within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after each solution volume increase of greater than or equal to 1% of tank volume by verifying the boron concentration of the solution in the water-filled accumulator; c.

At least once per 18 months by:

1) Verifying that each accumulator isolation valve closes automatically when the water level is 76.25 + 3.3 inches above the bottom inside edge of the water-filled accumulator with atmospheric pressure in the accumulator, and
2) Verifying that the total dissolved nitrogen and air in the feetofwater(equivalentto5x10gn80scfper1800 cubic water-filled accumulator is less th pounds nitrogen per pounds water).

d.

At least once per 5 years by replacing the membrane installed between the water-filled and nitrogen bearing accumulators and verifying that the removed membrane burst at a differential pressure of 40 + 10 psi.

l l

8305100390 830504 PDR ADDCK 05000 P

McGUIRE - UNITS 1 and 2 3/4 5-4 W