EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) b.
At least once per 31 days and within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after each solution volume increase of greater than or equal to 1% of tank volume by verifying the boron concentration of the solution in the water-filled accumulator; c.
At least once per 18 months by:
- 1) Verifying that each accumulator isolation valve closes automatically when the water level is 76.25 + 3.3 inches above the bottom inside edge of the water-filled accumulator with atmospheric pressure in the accumulator, and
- 2) Verifying that the total dissolved nitrogen and air in the feetofwater(equivalentto5x10gn80scfper1800 cubic water-filled accumulator is less th pounds nitrogen per pounds water).
d.
At least once per 5 years by replacing the membrane installed between the water-filled and nitrogen bearing accumulators and verifying that the removed membrane burst at a differential pressure of 40 + 10 psi.
l l
8305100390 830504 PDR ADDCK 05000 P
McGUIRE - UNITS 1 and 2 3/4 5-4 W