Revised Proposed Tech Spec Page 3/4 3-5
ML18095A365
Person / Time
Site: Salem PSEG icon.png
Issue date: 07/18/1990
From:
Public Service Enterprise Group
To:
Shared Package
ML18095A363 List:
References
NUDOCS 9007250287
Download: ML18095A365 (1)


Text

e e

TABLE 3.3-1 (Continued)

TABLE NOTATION With the reactor trip system breakers in the closed position and the control rod drive system capable of rod withdrawal.

The channel(s) associated with the protective functions derived from the out of service Reactor Coolant Loop shall be placed in the tripped condition.

The provisions of Specification 3.0.4 are not applicable.

High voltage to detector may be de-energized above P-6.

      1. If ACTION Statement 1 is entered as a result of Reactor Trip Breaker (RTB) or Reactor Trip Bypass Breakers (RTBB) maintenance testing results exceeding the following acceptance criteria, NRG reporting shall be made in accordance with Specification 6.9.1.9:
1.

A RTB or RTBB trip failure during any surveillance test with less than or equal to 300 grams of weight added to the breaker trip bar.

2.

A RTB or RTBB time response failure that results in the overall reactor trip system time response exceeding the Technical Specification limit.

ACTION 1 -

ACTION 2 -

ACTION 3 -

SALEM - UNIT 1 ACTIONS STATEMENTS With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement, be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypasses for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.1.1 provided the other channel is OPERABLE.

With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

a.

The inoperable channel is placed in the tripped condition within one hour.

b.

The Minimum Channels OPERABLE requirement is met; however one additional channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.1.1.

c.

Either, THERMAL POWER is restricted to ~ 75% of RATED THERMAL or the Power Range Neutron Flux trip setpoint is reduced to~ 85% of RATED THERMAL POWER within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; or, the QUADRANT POWER TILT RATIO is monitored at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement and with the THERMAL POWER level:

3/4 3-5 Amendment No.


~

QOQ7?~Q?R7 900718 l;[~C\\* -*.~o6f k 05000212 p

~