Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000362/LER-1983-097, Revised LER 83-097/03L-1:on 831029 & 30,control Element Assembly (CEA) 57 Dropped More than 19 Inches & CEA 61 Dropped More than 19 Inches on 831101.Caused by Sluggishness of CEA Grippers + (Revised LER 83-097/03L-1:on 831029 & 30,control Element Assembly (CEA) 57 Dropped More than 19 Inches & CEA 61 Dropped More than 19 Inches on 831101.Caused by Sluggishness of CEA Grippers)
- 05000346/LER-1984-001-01, Revised LER 84-001-01:on 840108,core Imbalanced Positively & Axial Power Shaping Rods Automatically Inserted.Caused by Large Difference in Amount of Xenon in Top of Core & Failed Integrated Circuit Gate,Respectively + (Revised LER 84-001-01:on 840108,core Imbalanced Positively & Axial Power Shaping Rods Automatically Inserted.Caused by Large Difference in Amount of Xenon in Top of Core & Failed Integrated Circuit Gate,Respectively)
- 05000366/LER-1984-001-01, Revised LER 84-001-01:on 840203,plant Personnel Detected Fracture in 66-inch Vent Header in Bay 5.Caused by Brittle Fracture of Vent Header Matl.Vent Header Will Be Repaired Prior to Startup + (Revised LER 84-001-01:on 840203,plant Personnel Detected Fracture in 66-inch Vent Header in Bay 5.Caused by Brittle Fracture of Vent Header Matl.Vent Header Will Be Repaired Prior to Startup)
- 05000278/LER-1984-001-02, Revised LER 84-001-02:on 840106,turbine Exhaust Rupture Diaphragm Alarm Annunicated Following Startup of HPCI Turbine.Caused by Rupture of Inner Rupture Disc.Inner Rupture Disc Replaced + (Revised LER 84-001-02:on 840106,turbine Exhaust Rupture Diaphragm Alarm Annunicated Following Startup of HPCI Turbine.Caused by Rupture of Inner Rupture Disc.Inner Rupture Disc Replaced)
- 05000366/LER-1984-001-02, Revised LER 84-001-02:on 840203,during Insp of Torus Interior,Fracture in 54-inch Vent Header Detected.Caused by Matl Being Subj to Temp Below Ndtt.Vent Header Repaired & Procedure Changes &/Or Sys Mods Made + (Revised LER 84-001-02:on 840203,during Insp of Torus Interior,Fracture in 54-inch Vent Header Detected.Caused by Matl Being Subj to Temp Below Ndtt.Vent Header Repaired & Procedure Changes &/Or Sys Mods Made)
- 05000364/LER-1984-002-01, Revised LER 84-002-01:on 840124,hourly Firewatch Patrol in Train B Auxiliary Bldg Battery Charger Room Not Performed at Specified Times.Caused by Personnel Error.Personnel Counseled & Firewatch Patrol Immediately Performed + (Revised LER 84-002-01:on 840124,hourly Firewatch Patrol in Train B Auxiliary Bldg Battery Charger Room Not Performed at Specified Times.Caused by Personnel Error.Personnel Counseled & Firewatch Patrol Immediately Performed)
- 05000277/LER-1984-003-01, Revised LER 84-003-01:on 840131,heatup Rate Exceeded Tech Spec Limits.Caused by Personnel Error.Operator Disciplined. Memo Issued to All Licensed Operators Re Tech Spec Rate + (Revised LER 84-003-01:on 840131,heatup Rate Exceeded Tech Spec Limits.Caused by Personnel Error.Operator Disciplined. Memo Issued to All Licensed Operators Re Tech Spec Rate)
- 05000397/LER-1984-008-01, Revised LER 84-008-01:on 840128,suppression Pool Level Indicator & Pool Level Fell Below Tech Spec Limits.Caused by Simultaneous Loss of Control Room Indication & Operation of Loop a of RHR Sys.Indication Reenergized + (Revised LER 84-008-01:on 840128,suppression Pool Level Indicator & Pool Level Fell Below Tech Spec Limits.Caused by Simultaneous Loss of Control Room Indication & Operation of Loop a of RHR Sys.Indication Reenergized)
- 05000277/LER-1984-008-01, Revised LER 84-008-01:on 840427,standby Gas Treatment Sys Solenoid Valve SV-00009 Failed to Operate Properly, Preventing Fan a Inlet & Outlet Dampers from Opening.Cause of Solenoid Failure Under Investigation + (Revised LER 84-008-01:on 840427,standby Gas Treatment Sys Solenoid Valve SV-00009 Failed to Operate Properly, Preventing Fan a Inlet & Outlet Dampers from Opening.Cause of Solenoid Failure Under Investigation)
- 05000361/LER-1984-009-01, Revised LER 84-009-01:on 840214,analysis of Startup Test Data for Units 2 & 3 Established That Calculated Thermal Power May Become Decalibr Relative to Secondary Calometric Power.Procedure S023-5-1 Revised + (Revised LER 84-009-01:on 840214,analysis of Startup Test Data for Units 2 & 3 Established That Calculated Thermal Power May Become Decalibr Relative to Secondary Calometric Power.Procedure S023-5-1 Revised)
- 05000263/LER-1984-011-01, Revised LER 84-011-01:on 840218,crack Indications Discovered in Listed Locations,Including RHR Sys & Recirculation Sys Pump Suction & Discharge Valves.Caused by Igscc.Stainless Steel 304 to Be Replaced + (Revised LER 84-011-01:on 840218,crack Indications Discovered in Listed Locations,Including RHR Sys & Recirculation Sys Pump Suction & Discharge Valves.Caused by Igscc.Stainless Steel 304 to Be Replaced)
- 05000387/LER-1984-012-01, Revised LER 84-012-01:on 840225,due Date & Violation Date Inadvertently Omitted from Cover Sheet of Quarterly Surveillance Procedure SI-072-301.Administrative Procedures Revised + (Revised LER 84-012-01:on 840225,due Date & Violation Date Inadvertently Omitted from Cover Sheet of Quarterly Surveillance Procedure SI-072-301.Administrative Procedures Revised)
- 05000395/LER-1984-013-01, Revised LER 84-013-01:on 840309,mod to Plant Integrated Fire & Security Sys Disabled Control Room Operator Ability to Receive Alarm Upon Actuation of Smoke Detectors in Zones Fff & Mmm of Intermediate Bldg + (Revised LER 84-013-01:on 840309,mod to Plant Integrated Fire & Security Sys Disabled Control Room Operator Ability to Receive Alarm Upon Actuation of Smoke Detectors in Zones Fff & Mmm of Intermediate Bldg)
- 05000416/LER-1984-020-01, Revised LER 84-020-01:on 840423,24 & 0514,during Startup, Five Reactor Water Cleanup Sys Isolations Occurred Due to Feedwater Flow Oscillations + (Revised LER 84-020-01:on 840423,24 & 0514,during Startup, Five Reactor Water Cleanup Sys Isolations Occurred Due to Feedwater Flow Oscillations)
- 05000395/LER-1984-024-01, Revised LER 84-024-01:on 840422 & 29,reactor Tripped Due to Low Main Turbine Shaft Oil Pump Discharge Pressure.Caused by Conservative Switch Settings & Loss of Suction on Motor Suction Pump.Switch Setpoint Will Be Changed + (Revised LER 84-024-01:on 840422 & 29,reactor Tripped Due to Low Main Turbine Shaft Oil Pump Discharge Pressure.Caused by Conservative Switch Settings & Loss of Suction on Motor Suction Pump.Switch Setpoint Will Be Changed)
- 05000397/LER-1984-026-01, Revised LER 84-026-01:on 840419 & 27,water Found in Train B of Standby Gas Treatment Sys.Caused by Pressure Surges in Preaction & Deluge Portions of Fire Protection Sys.Design Change in Progress + (Revised LER 84-026-01:on 840419 & 27,water Found in Train B of Standby Gas Treatment Sys.Caused by Pressure Surges in Preaction & Deluge Portions of Fire Protection Sys.Design Change in Progress)
- 05000397/LER-1984-027-01, Revised LER 84-027-01:on 840322,main Steam Relief Valve Solenoids Failed Due to Grounding in Solenoid Coils.Voltage Spike Suppression Diodes Installed Across Each Solenoid Circuit.Ge Conducting Review of Failures + (Revised LER 84-027-01:on 840322,main Steam Relief Valve Solenoids Failed Due to Grounding in Solenoid Coils.Voltage Spike Suppression Diodes Installed Across Each Solenoid Circuit.Ge Conducting Review of Failures)
- 05000482/LER-1987-050-01, Revised LER 87-050-01:on 871014,containment Isolation Valve Failed During Local Leak Rate Test Causing Total Path Leakage to Exceed Tech Spec Limits.Caused by Containment Isolation Check Valve Sticking Open + (Revised LER 87-050-01:on 871014,containment Isolation Valve Failed During Local Leak Rate Test Causing Total Path Leakage to Exceed Tech Spec Limits.Caused by Containment Isolation Check Valve Sticking Open)
- 05000315/LER-1991-007-01, Revised LER 91-007-01:on 910819,control Bank a Ordered Into Core by Rod Control Sys But Appeared Not to Move Into Core by Observation of Analog Rod Position Indication.Caused by Multiplexing Relay MXR-1 in Power Cabinet 2AC + (Revised LER 91-007-01:on 910819,control Bank a Ordered Into Core by Rod Control Sys But Appeared Not to Move Into Core by Observation of Analog Rod Position Indication.Caused by Multiplexing Relay MXR-1 in Power Cabinet 2AC)
- 05000266/LER-1993-001, Revised LER 93-001-00:on 930107,all 4,160 Volt Degraded Grid Voltage Protection Channels Declared Inoperable Due to Discovery That Settings for Relays on Subj Channels Being Too Low.Plant Mods Will Be Made + (Revised LER 93-001-00:on 930107,all 4,160 Volt Degraded Grid Voltage Protection Channels Declared Inoperable Due to Discovery That Settings for Relays on Subj Channels Being Too Low.Plant Mods Will Be Made)
- 05000412/LER-1998-008-02, Revised LER 98-008-02:on 980609,GL 96-01 TS Instrumentation Surveillance Inadequacies Occurred.Caused by Inadequate Application of Tech Specs.Procedures Revised + (Revised LER 98-008-02:on 980609,GL 96-01 TS Instrumentation Surveillance Inadequacies Occurred.Caused by Inadequate Application of Tech Specs.Procedures Revised)
- 05000293/LER-1980-005, Revised LER Changing Original Number from LER 80-005/01T to 04T.On 800131,concentrations of Sr-90 in Milk Sample from Indicator Station 2.2 Miles West of Reactor Site 10 Times Greater than Control.Caused by Meteorological Condi + (Revised LER Changing Original Number from LER 80-005/01T to 04T.On 800131,concentrations of Sr-90 in Milk Sample from Indicator Station 2.2 Miles West of Reactor Site 10 Times Greater than Control.Caused by Meteorological Conditions)
- ML17216A346 + (Revised LOCA-ECCS Analysis W/15% Steam Generator Tube Plugging)
- ML23124A395 + (Revised LTR to the Executive Branch Requesting Eb Views XCOM1354)
- ML040260011 + (Revised LaSalle County Station, Unit 2 Cycle 10 Core Operating Limits Report (COLR))
- ML20236V770 + (Revised LaSalle Unit 1 Cycle 8 COLR & Reload Transient Analysis Results)
- ML093010001 + (Revised Letter Approving License Transfer Constellation Edf Development)
- ML093000630 + (Revised Letter Approving License Transfer Constellation Edf Development)
- ML093000634 + (Revised Letter Approving License Transfer Constellation Edf Development)
- L-77-239, Revised Letter Request to Amend Appendix a of Facility Operating Licenses + (Revised Letter Request to Amend Appendix a of Facility Operating Licenses)
- ML25093A002 + (Revised Letter Requesting Eb Views for Export License XB1371)
- ML18302A157 + (Revised Letter and Revised Indemnity Agreement for Termination of Rancho Seco Operating License DPR-54)
- ML18302A158 + (Revised Letter for Termination of Rancho Seco Nuclear Generating Station Operating License DPR-54 and Indemnity Agreement)
- DD-02-03, Revised Letter from J. Samuel Walker to Norm Cohen Re DD-02-03 + (Revised Letter from J. Samuel Walker to Norm Cohen Re DD-02-03)
- ML042440721 + (Revised Letter on Request for Relief from ASME Section Xl Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations)
- ML22346A005 + (Revised Letter to Eb Requesting Assurances for XCOM1072-02)
- ML25255A310 + (Revised Letter to Eb Requesting Assurances for XSNM3849)
- ML25107A263 + (Revised Letter to Eb Requesting Assurances for XSOU8869)
- ML25105A047 + (Revised Letter to Eb Requesting Eb Views for XSOU8871- Hong Kong)
- ML23191A535 + (Revised Letter to Eb for XCOM1356)
- ML16061A393 + (Revised Letter to J. Schlueter Staff Response to the NEI Comments on Recordkeeping and Inventory Requirements in Subpart B of Title 10 of the Code of Federal Regulations Part 74, Material Control and Accounting of Special Nuclear Material)
- ML25350C312 + (Revised Letter to the Eb Requesting Eb Views for PXB11c.03)
- ML22301A009 + (Revised Letter to the Executive Branch - Transmitting XCOM1309-01)
- ML22075A161 + (Revised Letter to the Executive Branch Requesting Eb Views for XW027-01)
- ML22075A004 + (Revised Letter to the Executive Branch Requesting Views for XB1360.pdf)
- ML25006A179 + (Revised Letter to the Executive Branch for China XCOM1343 3/15/2024)
- ML20210J995 + (Revised License Amend Request 269 for License DPR-50, Revising TMI-1 UFSAR Section 14.1.2.9 Environ Dose Consequences for TMI-1 Steam Line Break Analysis)
- RBG-46478, Revised License Amendment Request (LAR) 2004-26, Use of the Fuel Building Cask Handling Crane for Dry Spent Fuel Cask Loading Operations Dated March 8, 2005 + (Revised License Amendment Request (LAR) 2004-26, Use of the Fuel Building Cask Handling Crane for Dry Spent Fuel Cask Loading Operations Dated March 8, 2005)
- W3F1-2021-0032, Revised License Amendment Request - Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System + (Revised License Amendment Request - Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System)
- ML030030457 + (Revised License Amendment Request 01-11, Application for Technical Specification Change Regarding Missed Surveillance and Adoption of a Technical Specifications Bases Control Program Using the Consolidated Line Item Improvement Process)
- L-2014-271, Revised License Amendment Request Change of the Milestone 8 Completion Date + (Revised License Amendment Request Change of the Milestone 8 Completion Date)
- GNRO-2003/00072, Revised License Amendment Request Regarding Shutdown Cooling System Isolation Instrumentation + (Revised License Amendment Request Regarding Shutdown Cooling System Isolation Instrumentation)
- NOC-AE-10002502, Revised License Amendment Request for Approval of Cyber Security Plan + (Revised License Amendment Request for Approval of Cyber Security Plan)