Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198K798 + (Rev 4 to Project Procedure PP-03, Process Review,Cmp Horizontal Slice)
- ML20024F611 + (Rev 4 to Project QA Plan for Midland Independent Design Const & Verification Program)
- ML20045E978 + (Rev 4 to Pump & Valve IST Plan, for Stp,Unit 2)
- ML17286B179 + (Rev 4 to Pump & Valve Inservice Test Program Plan,WPPSS-2)
- ML20073C550 + (Rev 4 to Pump & Valve Inservice Testing Program)
- ML20092B359 + (Rev 4 to Pump & Valve Inservice Testing Program Plan)
- ML20195H538 + (Rev 4 to Pump & Valve Inservice Testing Program Plan)
- RBG-26506, Rev 4 to Pump & Valve Inservice Testing Plan River Bend Station First 10-Yr Insp Interval. Fee Paid + (Rev 4 to Pump & Valve Inservice Testing Plan River Bend Station First 10-Yr Insp Interval. Fee Paid)
- ML20126M659 + (Rev 4 to Pump & Valve Inservice Testing,Unit 2)
- ML20072J308 + (Rev 4 to Pump & Valve Program)
- ML20102B892 + (Rev 4 to Pump & Valve Program Re Insp of Jacket & Air Cooler Coolant Sys)
- ML20126D633 + (Rev 4 to QA Instruction Qai 15, Quality Surveillance of Site Contractors)
- ML20126D615 + (Rev 4 to QA Instruction Qai 23, Review of Ebasco Const Quality Records)
- ML20126D796 + (Rev 4 to QA Instruction Qairgs 11-H, Documentation Statusing Review Instruction)
- ML20126K387 + (Rev 4 to QA Manual Section 18, Corrective Action)
- ML20126K308 + (Rev 4 to QA Manual Section 2, Statement of Policy)
- ML20206C425 + (Rev 4 to QA Personnel - Personnel-Training & Experience, TVA Employee Concerns Special Program)
- ML20080K361 + (Rev 4 to QA Program)
- ML20238D457 + (Rev 4 to QA Program)
- ML20213A595 + (Rev 4 to QA Program)
- ML20212B293 + (Rev 4 to QA Program Description)
- ML20138H798 + (Rev 4 to QA Program Description for Operational Nuclear Power Plants)
- ML20236H147 + (Rev 4 to QA Program Description for Operational Nuclear Power Plants)
- ML18092A744 + (Rev 4 to QA Program Description,Constituting Chapter 17 of FSAR)
- ML20076H733 + (Rev 4 to QA Program for Design & Const Phase)
- ML20148M101 + (Rev 4 to QA Program for Operation)
- ML20211E191 + (Rev 4 to QA Program for Radioactive Matl Packages)
- ML20206C473 + (Rev 4 to QA Records, TVA Employee Concerns Special Program)
- ML20137Q663 + (Rev 4 to QA-78-1, 10CFR71 QA Program for Shipping Packages for Irradiated Fuel,High Level Waste & Pu)
- ML20215B259 + (Rev 4 to QC Procedure DCP-2, Silicone Room Installation. Partially Withheld Related Info Encl)
- ML20126D744 + (Rev 4 to QC Procedure MCP-2170, Hydrostatic or Pneumatic Testing Procedure)
- ML20126D495 + (Rev 4 to QC Procedure QCP-3070, Personnel Indoctrination & Training Procedure)
- ML20126D466 + (Rev 4 to QC Procedure Qcp 3050, Qualification of Insp Exam Test Personnel)
- ML20132F553 + (Rev 4 to QC Procedure WQC-50, Equipment Hanging & Setting Insp)
- ML17286A571 + (Rev 4 to Qci 6-13, Ultrasonic Exam of Piping Welds (Manual))
- ML20202J761 + (Rev 4 to Quality Instruction QI-002, Comanche Peak Response Team Action Item I.a.2,Insp Rept on Butt Splices & Comanche Peak Response Team Action Item I.a.3,Butt Splice Qualifications)
- ML20202J826 + (Rev 4 to Quality Instruction QI-004, Comanche Peak Response Team Action Item I.b.1 - Flexible Conduit to Flexible Conduit Separation & Comanche Peak Response Team Action Item I.b.2 - Flexible Conduit..)
- ML20203A039 + (Rev 4 to Quality Instruction QI-007, Reinsp of Plug Welds)
- ML20203A096 + (Rev 4 to Quality Instruction QI-008, Reinsp of Conduit/ I-E-CDUT)
- ML20203A475 + (Rev 4 to Quality Instruction QI-015, Documentation Review of Cables/R-E-CABL)
- ML20203A360 + (Rev 4 to Quality Instruction QI-019, Reinsp of Small Bore Pipe Supports)
- ML20236N785 + (Rev 4 to Quality Instruction QI-025, Reinsp of Large Bore Piping Configuration)
- ML20236N841 + (Rev 4 to Quality Instruction QI-045, Reinsp of Structural Steel)
- ML20236N898 + (Rev 4 to Quality Instruction QI-058, Reinsp of Pipe Supports Trt Issues - 42 Pipe Supports)
- ML20094M283 + (Rev 4 to Quality Plan for Underpinning Activities. Related Info Encl)
- ML20207P359 + (Rev 4 to RSM-M, Shipping Container QA Requirements)
- ML20151W321 + (Rev 4 to RT-ASME Iii/Xi, NDE Std Radiography)
- ML20206C582 + (Rev 4 to RW-C-100, Solid Radwaste Sys Process Control Program (Pcp))
- ML20082M006 + (Rev 4 to RWS-0204, Radwaste Processing Control Program)
- ML20198J585 + (Rev 4 to RXE-96-001, Cpses,Unit 2,Cycle 3,COLR)
- ML20043C251 + (Rev 4 to Radiological Controls Policy & Procedure Manual 9300-ADM-4010.03, Emergency Dose Calculation Manual)