Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235W706 + (Rev 2 to Inservice Testing Program Plan for Pumps & Valves)
- ML17199X710 + (Rev 2 to Inservice Testing Program for ASME Class 1,2 & 3 Pumps & Valves,Including Augmented NRC Testing)
- ML18094A753 + (Rev 2 to Inservice Testing Program for Pumps & Valves for 2nd 10-yr Insp Interval)
- ML20090F627 + (Rev 2 to Inservice Testing Program for Pumps & Valves)
- ML20107K399 + (Rev 2 to Inservice Testing Program for Pumps & Valves)
- ML20112H172 + (Rev 2 to Inservice Testing Program,Point Beach Nuclear Plant Units 1 & 2)
- ML20215C447 + (Rev 2 to Insp of Welds Through Paint)
- ML20205Q570 + (Rev 2 to Instruction CP-EI-4.5-1, General Program for As-Built Piping Verification, Per IE Bulletin 79-14,Rev 1 & Suppls 1 & 2 to IE Bulletin 79-14)
- ML20092F665 + (Rev 2 to Instruction Manual, High Speed Phase & Ground Protection for Multiple-Winding & Auto-Transformers)
- ML20209H154 + (Rev 2 to Instruction PI-CP-079, Preparation,Review & Approval of Pump & Valve Operability Packages)
- ML20199E412 + (Rev 2 to Instruction QI-008, Reinspection of Conduit/Ie Conduit)
- ML20210G361 + (Rev 2 to Instruction QI-037, Reinsp of Pipe Supports:Trt Issues-Pipe Supports in Room 77N,Safeguards Bldg,Unit 1)
- ML20210G983 + (Rev 2 to Instruction QI-069, Documentation Review of Epoxy Grout)
- ML20207A545 + (Rev 2 to Instruction QI-QAP-11.1-5, Identification of ASME Section III Items & Matls. Related Info Encl)
- ML20205Q584 + (Rev 2 to Instruction QI-QP-11.13-1, As-Built Piping Verification Instructions)
- ML20198L484 + (Rev 2 to Instruction QI-QP-11.14-1, Insp of Site Fabrication & Installation of Structural & Miscellaneous Steel)
- ML20210B008 + (Rev 2 to Instruction QI-QP-11.14-3, Insp of Structural/ Miscellaneous Steel Welding)
- ML20136A721 + (Rev 2 to Instruction QI-QP-11.3-40, Class 1E Electrical Post-Const Verification)
- ML20138M959 + (Rev 2 to Instruction QI-QP-2.1-16, Qualification of Design Change Verification Personnel)
- ML20080T354 + (Rev 2 to Instrument Maint Procedure FNP-1-IMP-201.28, Pressurizer Relief Tank Level LT-470)
- ML20080T311 + (Rev 2 to Instrument Maint Procedure FNP-1-IMP-202.8, Vol Control Tank Level LT-112. Related Info Encl)
- ML20080T321 + (Rev 2 to Instrument Maint Procedure FNP-1-IMP-201.22, Pressurizer Level Control,LC-459F)
- ML20206U855 + (Rev 2 to Instruments,Matl,Equipment Re Purchasing & Requisitions)
- ML20072J922 + (Rev 2 to Insulation Resistance Test of Auxiliary Electrical Equipment. Portions of Westinghouse Spec,Draft Tech Specs & Surveillance Procedure Excerpts Encl)
- ML20034F825 + (Rev 2 to Integrated Plant Assessment Methodology Vol 1: Sys,Structures & Components Screening)
- ML20128B707 + (Rev 2 to Integrated Reactor Vessel Matl Surveillance Program)
- ML20206T309 + (Rev 2 to Interface Control Instructions)
- ML20197G924 + (Rev 2 to Interim Deficiency Rept DER 82-80 Re Low Insulation Resistance Values for Terminal Blocks Supplied by Conax Corp.Initially Reported on 821217.Due to Extensive Investigation & Evaluation,Final Rept Delayed Until 840731)
- ML20085H629 + (Rev 2 to Interim Deficiency Rept DER 82-46 Re Itt Barton Pressure Transmitters Supplied by C-E That Fail to Meet Overpressure Requirements.Initially Reported on 820824.Final Rept by 831214.Also Reported Per Part 21)
- ML20080S801 + (Rev 2 to Interim Deficiency Rept DER 83-53 Re Embed Plates Not Meeting Wpp/Qci Requirements.Initially Reported on 830801.Defective Embed Plates Will Be Corrected.Next Rept by 840521)
- ML17055B524 + (Rev 2 to Interim Operating Procedure N2-IOP-101A, Plant Start Up)
- ML20024E726 + (Rev 2 to Interim Reliability Evaluation Program,Browns Ferry Team Fault Tree Guide)
- ML20205D200 + (Rev 2 to Isap I.a.4, Agreement Between Drawings & Field Terminations, Results Rept)
- ML20198B914 + (Rev 2 to Isap VII.b.1, Onsite Fabrication)
- ML20247G028 + (Rev 2 to JAF-CALC-RAD-00007, Power Uprate Program - Offsite Post-Accident Atomospheric Disperion Factors)
- ML20247G064 + (Rev 2 to JAF-CALC-RAD-00042, Control Room Radiological Habitability Under Power Uprate Conditions & CREVASS Reconfiguration)
- ML20236X383 + (Rev 2 to JAF-RPT-MULTI-02671, Summary of Detailed Evaluation for NRC Generic Ltr 96-06)
- ML17223A450 + (Rev 2 to JNS-PSL-203, Second 10-Yr Inservice Insp Interval Inservice Testing Program for Pumps & Valves)
- ML17227A601 + (Rev 2 to JNS-PSL-204, First Ten-Year Inservice Inspection Interval Inservice Testing Program for Pumps & Valves, St Lucie Nuclear Power Plant,Unit 2)
- ML20137M204 + (Rev 2 to JPN-PSL-SEFJ-95-023, Safety Evaluation for 1995 Boraflex Blackness Testing Results)
- ML20137L226 + (Rev 2 to JPN-PSL-SEFJ-96-020, Safety Evaluation,Refueling Equipment Underload & Overload Settings)
- ML20155E783 + (Rev 2 to Ja FitzPatrick NPP IST Program for Pumps & Valves Third Interval Plan)
- L-96-158, Rev 2 to Jm Farley Nuclear Plant Units 1 & 2 Licensing Rept for TS Changes Associated W/Revised Core Limits,Revised Trip Setpoints & Inclusion of RAOC Control Strategy + (Rev 2 to Jm Farley Nuclear Plant Units 1 & 2 Licensing Rept for TS Changes Associated W/Revised Core Limits,Revised Trip Setpoints & Inclusion of RAOC Control Strategy)
- ML20210L273 + (Rev 2 to Joint Bwr,Westinghouse & CEOG Program on MOV Periodic Verification)
- ML20217P466 + (Rev 2 to Joint Bwr,Westinghouse & Combustion Engineering Owners Group Program on Motor-Operated Valve (MOV) Periodic Verification)
- ML20138D455 + (Rev 2 to Justification for Excluding UF6 Cylinder Storage Yards from Criticality Accident Alarm Sys Coverage)
- ML20195H477 + (Rev 2 to KY/S-267, Technical Justification for Exemption of C-746-A,C-733,C-754,C-754-A,C-333 & C-757 Waste Storage Facilities from Criticality Alarm Requirements)
- ML20217M661 + (Rev 2 to L-001166, Post LOCA CR Auxiliary Electric Room & Offsite Dose)
- ML20203E902 + (Rev 2 to L-001337, Containment Liner Leak Chase Channel Assessment)
- ML20096A156 + (Rev 2 to LAP-200-6, LaSalle County Station Process Control Program)
- ML20249C509 + (Rev 2 to LAR Dtd 960726,requesting Changes to Ts,App a Sections 3.6.C & 3/4.17.B & Associated Bases.Proposed Changes Are to Establish TS Requirements That Are Consistent W/Analysis Inputs Used for Evaluation of MSLB Accident)