Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20207J659 + (Rev 18 to AR-504, ICS L Annunciator Response)
- ML20202B030 + (Rev 18 to AR-603, Tgf O Anunciator Response)
- ML20154C275 + (Rev 18 to AR-701, Ssf P Annunciator Response)
- ML20101Q890 + (Rev 18 to Administrative Procedure AP 580, Reactor Trip)
- ML20044D147 + (Rev 18 to Annunciator Response (AR) AR-403, PSA H Ar)
- ML20117E300 + (Rev 18 to App V Pump & Valve Testing Program Plan)
- ML20236K872 + (Rev 18 to Application for Amend to License SNM-1097,revising Part I of License Application Currently Approved by Condition 9 of License.Fee Paid)
- ML20141C340 + (Rev 18 to CNP IST Program)
- ML20148N925 + (Rev 18 to CPC-2A, Quality Program Description for Operational Nuclear Plants)
- ML20138P356 + (Rev 18 to Const Procedure DCP-3, Comanche Peak Steam Electric Station Document Control Program, Incorporating Document Change Notice 1)
- ML20056H556 + (Rev 18 to Corporate Organization for Nuclear Incidents Procedure Manual. W/930831 Release Ltr)
- ML20126B760 + (Rev 18 to Emergency Instruction EI-3, SG Tube Rupture)
- ML20092N553 + (Rev 18 to Environ Rept - OL Stage)
- ML20205T008 + (Rev 18 to FNP-0-M-011, Odcm)
- ML20202G095 + (Rev 18 to GW-GL-021, AP600 SSAR, Vols 1-11.W/four Oversize Drawings)
- ML20132G578 + (Rev 18 to Inservice Testing Program Plan for Vermont Yankee Nuclear Power Station)
- ML20141D933 + (Rev 18 to Inservice Testing Program for Callaway Nuclear Plant)
- ML20136B578 + (Rev 18 to Instruction QI-QP-11.3-40, Post-Const Insp of Electrical Equipment & Raceways)
- ML20212P006 + (Rev 18 to Maint Procedure MP-402, Maint of `Limitorque Valve Controls)
- ML20217F366 + (Rev 18 to McGuire Unit 1 Cycle 14 Colr)
- ML20236F903 + (Rev 18 to Nuclear Power Operational QA Manual)
- ML20206G228 + (Rev 18 to ODCM for Hope Creek Generating Station)
- ML20080P422 + (Rev 18 to ODCM for South Carolina Electric & Gas Co VC Summer Nuclear Station)
- ML20203H270 + (Rev 18 to Odcm)
- ML20217Q111 + (Rev 18 to Odcm)
- ML20205D268 + (Rev 18 to Offsite Dose Calculation Manual)
- ML17229A244 + (Rev 18 to Offsite Dose Calculation Manual (Odcm))
- ML20094M551 + (Rev 18 to Operating QA Manual)
- ML20140J159 + (Rev 18 to Operating QA Manual, mark-up,identifying Changes Through Use of Strikeover & Inserts)
- ML20069D153 + (Rev 18 to Operational QA Plan)
- ML17291A573 + (Rev 18 to Operational QA Program Description)
- ML19332D005 + (Rev 18 to Operations Mgt Manual (Opmm))
- ML20138K510 + (Rev 18 to Ort 59, Train Spray Sys CIV Leakage Test for Unit 2)
- ML20138K516 + (Rev 18 to Ort 60, Train B Spray Sys CIV Leakage Test for Unit 2)
- ML20215B636 + (Rev 18 to Part B of QA Program Description for Facility)
- ML20215B649 + (Rev 18 to Part C of QA Program Description for Facility)
- ML20215B632 + (Rev 18 to Part a of QA Program Description for Facility)
- ML20090G834 + (Rev 18 to Procedure 1013.02, Control of Procedures)
- ML20092F609 + (Rev 18 to Procedure 13011-1, RHR Sys)
- ML20113G319 + (Rev 18 to Procedure 14980-1, Diesel Generator Operability Test. W/Vcr Tape 159,photos (160-1-1 to 160-2-35 & 166-1-1 to 166-3-5) & Related info.W/10 Oversize Drawings)
- ML20107C377 + (Rev 18 to Procedure DCP-3, Comanche Peak Steam Electric Station Document Control Program)
- ML20195F593 + (Rev 18 to Procedure QI-QAP-11.1-28, Fabrication, Installation Insps of ASME Component Supports,Class 1-3)
- ML20093D213 + (Rev 18 to Procedure RS-084-01, Interface Control for Interorganizational Processes)
- ML17263A351 + (Rev 18 to QA Program for Station Operation)
- ML20153H385 + (Rev 18 to Sequoyah Nuclear Plant Offsite Dose Calculation Manual)
- ML17311A112 + (Rev 18 to Station Procedure Sp 668.1, Diesel Generator Operational Readiness Demonstration)
- ML20206T705 + (Rev 18 to Surveillance Procedure 6.3.4.1, Core Spray Test Mode Surveillance Operation)
- ML20216E636 + (Rev 18 to TDB-VI, COLR for FCS Unit 1)
- ML20211Q584 + (Rev 18 to Training & Qualification Plan)
- ML20199E604 + (Rev 18 to USEC-01 Application for NRC Certification for Paducah Gaseous Diffusion Plant.Rev Incorporates Changes to Technical Safety Requirements & Sar.Rev Bars Provided in right-hand Margin to Identify Changes)
- ML20092G715 + (Rev 18 to VEGP-13011-1, RHR Sys. Supporting Documentation Encl)