RMD CONTROL COPY #

                                              • j l * *
  • OPERATICHS *
  • MANAGEMENT MANUAL *  !

V,

  • t
  • (OPMN)
  • L  !

E i

PREPARED BY: J. H. MALONE, OPERATIONS ADMINISTRATIVE SUPERVISOR SUBMITTED BYtr- o M <<' k /

/ M. GRILLO,' OPERATIONS MANAGER ATE l

SOPC REVIEW COMPLETED DURING MEETING NUMBER M - IN7 DATE: 9 )N 81 i

APPROVED BY: .

_- N i ,

1 D. E. MOODY,'StATIO ANAGER DADE' l

l-REVISIOR 18 -- EFFECTIVE: g_g7.g9 DATE OF LAST PERIODIC REVIEW: 11/19/87 PATE NEXT PERIODIC REVIEW DUE: 11/19/89 009,h.

891I290283 891122 'yh.

.PDR FOIA. p BROCKB9-366' PDR ,

. 1

(-  !

OPERATIONS MANAGEMENT MANUAL (OPMM)

CONTENT PAGE ,

'i .

. CHAPTER 1 IHTRODUCTION 1.0: GROUP OVERVIEW 1-1.1 1.1 MISSION STATEMENT 1-1.1 l= 1.2 OPERATIONS SCOPE 1-1.1 I 1.3 STATION MANAGEMENT 1-1.1 2.0 ORGANIZATIONAL STRUCTURE 1 - 2,1 -

2.1 GENERAL 1-2.1 i- 2.2 SHIFT ORGANIZATION 1-2.1

.. 2.3 CONTROL ROOM COMMAND FUNCTION 1-2.3 FIGURE 1-2-1 OPERATIONS GROUP FUNCTIONAL ORGANIZATION 1-2.4 i

i 3.0 JOB DESCRIPTIONS 1-3.1 .;

3.1 OPERATIONS MANAGER 'l-3.1 ,

3.2 ASSISTANT OPERATIONS MANAGER 1 3.1 >

3.3 OPERATING SHIFT CREW 1-3.2 3.4 OPERATIONS ADMINISTRATIVE SUPERVISOR 1-3.6  !

3.5 FIRE FIGHTER SUPERVISOR 1-3.6 ,

4.0 TRAINING 1-4.1 4.1 SHIFT CREW TRAINING 1-4.1 4.2 OTHER TRAINING 1-4.1 5.0 POLICIES 1-5.1 5.1 TRAINING 1-5.1 5.2 SAFETY 1-5.1 Page 1 OFMM Rev. 18

i

[ CONTENT PAGE CHAPTER 1: SHIFT COMPOSITION 1.0 SHIFT COMPOSITION 2-1.1 1.1 GENERAL 2-1.1 1.2 SHIFT COMPLEMENT 2-1.1 l.3 NOTIFICATION OF ABSENCES 2-1.2 =

+  ;

1.4 PERSONNEL RECALL 2-1.2 1.5 OVERTIME 2-1.3 FIGURE 2 1-1 MINIMUM SHIFT COMPOSITION 2-1.5 ,

CHAPTER 3: SHIFT OPERATIONS 1.0 SHIFT OPERATIONS 3-1.1 1.1 OVERVIEW 3-1.1 i 1.2 ABNORMAL OR EMERGENCY CONDITIONS 3-1.3 I 1.3 REACTOR TRIP OR SAFETY INJECTION 3-1.4 1.4 NOTIFICATION OF MANAGEMENT AND REGULATORY AGENCIES 3-1.5 .

1.5 CONTROL ROOM REFERENCE INFORMATION 3-1.6 i 1.6 COMMUl:ICATIONS 3-1.7 1.7 WATCHSTATION CONDUCT 3-1.8 '

l.8 SHIFT EVOLUTION BRIEFINGS 3-1,12 e i

1.9 GENERATOR LOAD CHANGES 3 1.12 1.10 SAFETY TAGGING 3-1.13 1.11 TEMPORARY MODIFICATIONS 3-1.13 -

1.12 INSIRUMENTATION AND CONTROL 3-1.13 1.13 RETURNING EQUIPMENT TO SERVICE 3-1.14 1.14 RADIOLOGICAL CONTROLS 3-1.15 1.15 SHIFT SUPERINTENDENT INSPECTION TOURS 3-1.15

^

1.16 FAILURE OF DUAL FUNCTION VALVES 3-1.15 l

FIGURE 3-1-1 OPERATOR ACTIONS WHEN DUAL FUNCTION VALVES FAIL 3-1.17

(

Page 2 OPMM Rev. 18 SUPERS.DH

w a.-

k l

CON' LENT PAGE CHAPTER 3: SHIFT OPERATIONS l 2.O PROCEDURES 3-2.1 l e 2.1 COMPLIANCE WITH PROCEDURES 3-2.1 l

t 2.2 SYSTEM LINEUPS 3-2,3

, 2.3 PERIODIC REVIEW OF OPERATING PROCEDURES 3-2.4 l

i 2.4 ADMINISTRATIVE RESPONSIBILITIES 3-2.b 3.0 SHIFT RECORDS 3-3.1 3.1 SHIFT RECORDS REQUIREMENTS 3-3.1

, 3.2 LOG SHEETS 3-3.3 l

4.0 SURVEILLANCE TESTING 3-4.1 4.1 OPERATIONS SURVEILLANCE TESTS 3-4.1 4.2 CONDITIONAL OR OFF-NORMAL SURVEILLANCE REQUIREMENTS 3-4.1 4.3 TESTING OR MAINTENANCE DURING SEVERE VEATHER 3-4.2 I CHAPTER 4: SHIFT RELIEF AND TURNOVER 1.0 SHIFT RELIEF AND TURNOVER 4-1,1 1.1 GENERAL 4-1.1 1.2 RESPONSIBILITIES 4-1.1 1.3 TURNOVER PROCESS 4-1.1 FIGURE 4-1-1 ILLUSTRATION OF AUXILIARY OPERATOR RELIEF 4-1.4 CHECKLIST' 2.0 CHAPTER 4 OPMM FORMS 4-2.1 Page 3 OPMM Rev. 18 l

SUPERS m l'

P i

f 1.0 GROUP OVERVIEW [

I 1.1 MISSION STATEMENT l

The Operations Group is responsible for electric power generation equipment. To ensure that the Station is operated safely, economically and in accordance with regulatory requirements, Operations Group personnel

1. manipulate controls to start, stop and regulate Station equipment, l  :
2. . monitor the operation of equipment by visually inspecting equipment  ;

and buildings, reading instruments, and conducting periodic tests on standby equipment,

3. perform routine maintenance such as replacing indicator bulbs and recorder paper, adjusting packing, changing filters, adding oil or ~  ;

lubricants, and performing light cleaning.

4. coordinate the orderly removal from and return to service of equipment undergoing maintenance, repair, modification, and testing, and
5. take appropriate action to stop or correct an off-normal, abnormal or emergency operating condition.

1.2 OPERATIONS SCOPE The Operations Group operates the permanently-installed mechanical, electrical, I and instrumentation equipment that is involved in or supports safe electric power generation. Included within this scope are:

1. the reactor and its primary, secondary, and auxiliary cooling and sup-port systems,
2. the turbine generator and associated systems, ,;
3. safety systems, 4 electrical distribution, instrumentation, and ventilation systems, and
5. other support systems.

1.3 STATION MANAGEMENT 1.3.1 Station Manager The Station Manager is responsible for management of the Unit. He may .

designate in writing other qualified personnel to assume responsibility for the Stat:

  • in his absence.

1-1.1 OPMM Rev. 18

_su - -

I r 2.3 STATION MANAGEMENT 1.3.2. Operations Manager / Assistant Operations Manager -

In the absence of the Station Manager and the Assistant Station Manager, the Operations Manager or Assistant Operations Manager is responsible (per the SSMM) for overall Station operations.

1.3.3. shift Superintendent Tt.2 Shift Superintendent assumes the responsibility for overall management. l' of the Station when the above individuals are not onsite at the Station.

f i

1-1.2 OPMM Rev. 18

l 2.0 ORGANIZATIONAL STRUCTURE  !

2.1 GEh'ERAL ,

+

The functional organization of the Operations Group is illustrated in Figure 1-2-1. The Operations Group is organized to support the continuous operation of ,

the Station. $1x shifts of Operations Group personnel provide continuous i manning of the Station. Five shifts are in normal rotation to support Station '

operations while the sixth shift is in training.

2.2 SHIFT ORGANIZATION t 2.2.1 Shift Superintendent Each shift is headed by a Shift Superintendent who oversees the operational activities of the unit regardless of its operating condition.

The Shift Superintendent:

1. is the onsite representative of the Station management and is the Short Term Emergency Director in the event of a site emergency,
2. provides immediate liaison with the NRC when required, and
3. shall possess, in addition to an SRO license, the training and qualification of a Shift Technical Advisor or shall have a qualified l Shift Technical Advisor assigned to his shift. The Unit Shift l Supervisor or another individual may fill the Shift Technical Advisor position. If anyone other than the Unit Shift Supervisor is assigned to the Shift Technical Advisor position, that individual shall have no other collateral duties which could interfere with performance of the Shift Technical Advisor function. .i 2.2.2 Unit Shift Supervisor The Unit Shift Supervisor reports to the Shift Superintendent and supervises .'

4 the operation of the unit.

2.2.3 operators

1. A Supervisory Control Room Operator, a Control Room Operator, Auxiliary Operators and fire fighters report to the Unit Shift Supe rvisor. .

L

2. In general, the Supervisory Control Room Operator and the Control Room Operator manipulate the controls and monitor instrumentation in the unit's main control room. The Auxiliary Operators operate equip-ment locally and monitor equipment operation in other assigned areas throughout the unit. 1 l

[ 3. A Fire Brigade, composed of Shift Operators and Fire Fighters as L described in the Station Fire Protection Manual (SSFP), is maintained I on-shift at all times. 1

. 1-2.1 OPKM Rev. 18 l- '

I l

l

~

r>

?) i

{-  ;

2.2 SHIFT ORGANIZATION  :

i

'2.2.3 ,0perators (Continued)

NOTE An Alternate Control Room Operat ori, who holds an Operator license, is normally assigned to the Auxiliary Operator position. The Alternate Control Room Operator may be assigned to the Control Room Operator posi-tion or Auxiliary Operator position as needed to support the operation of the Station. The position of Alternate Control p.com Operator allows Control Room Operators to be replaced when vacancies occur.

'2.2.4 General Shift Personnel Responsibilities  ;

1. In addition to operating and monitoring the condition of operable equipment, shift personnel should be cognizant of the availability status of unit r,quipment. Such knowledge ensures that operational needs and Technical Specifications are raet.
2. Shift personnels
a. coordinate and control both the tagging out-of-service of equipment and the equipment's restoration to service, and i
b. assist in integrated planning and scheduling of maintenance, repair, and testing activities.

2.2.5 Licenses  !

1. 10 CFR 55 requires thats
a. operators who manipulate key unit controls are licensed as Reactor Operators, and
b. operators who supervise licensed Reactor Operators are licenced as Senior Reactor Operators by the NRC.
2. The Operations Manager and Assistant Operations Manager, Shift  !

~ Superintendents, Day Shift Superintendent, Operations Administrative 1 l Supervisor, and Unit Shif t Supervisors shall hold Senior Reactor l Operator licenses. i l

l 3. Each Supervisory Control Room Operator, Control Room Operator and '

! Alternate Control Room Operstor shall hold a Reactor Operator license.

l l

1 l

1-2.2 OPMM Rev. 18 ,

l l

I l

l

e ,

2.3 CONTROL ROOH COMMAhD FUNCTION l i

2.3.1 General The Shif t Superintendent is the senior 't-shif t manager and is responsible for the Control Room Command Function. (The Control Room is defined as the  :

Control Building, elevation 75' - 0".) The Shift Superintendent may, and i normally vill, delegate the responsibility for the Control Room Command  ;

Tunction of the unit to the Unit Shif t Supervisor. When it is necessary or i desirable for a Unit Shif t Supervisor to leave the Control Room, the Shif t t Superintendent _shall assume the Control Room Command Function unless another i licensed Senior Reactor Operator is available to' assume this function.

Management may make recommendations regarding operation of the plant, but _

! t unless and until relieved of command and control, the Control Room Commander is the responsible authority.

2.3.2 Line Management Authority Members of New Hampshire Yankee LINE management from Operations Department .

Management up through the President have the authority to order the shutdown' f of the reactor, when, in their judgement, such action is required to protect -

the safety of the Station or the health and safety of the public. 3 2.3.3 , Emergency Plan Activities .

1. Upon notifiestion of an event that could require activation of the  !

Radiological Emergency Plan, the Shift Superintendent shall:

a. report to the Control Room of the affected unit, and '
b. function as both the Short Term Emergency Director and Shift Technical Advisor.
2. The Unit Shif t Supervisor chall maintain the Control Room Command Function for the unit unless the Shift Superintendent deems it .

necessary to assume this function.

3. Upon notification of an seent-that requires activation of the Radiological Emergency Plan, the Auxiliary Operators and Fire Brigade i t- members shall immediately report to the Control Room unless otherwise directed by the Unit Shif t Supervisor.

6

+

1-2.3 OFMM Rev. 18

y -.

l' lE '2

- : TIGURE l-2-1 OPERATIONS CROUP FUNCTIONAL ORGANIZATION PRESIDENT I

SENIOR VICE PRESIDENT I

EXECUTIVE DIRECTOR .

NUCLEAR PRODUCTION I

STATION MANAGER I

ASSISTANT STATION MANAGER OPERATIONS MANAGER OPERATIONS __

ADMINISTRATIVE SUPERVISOR STAFT ENGINEER ASSISTANT OPERATIONS MANAGER SHIFT FIRE FIGHTER SUPERINTENDENTS SUPERVISOR UNIT SHIFT SUPERVISORS OPERATORS TIRE FIGHTERS 1-2.4 OPMH Rev. 18 )

\

j 3.0 JOB DESCRIPTIONS

. f 3.1  !

s OPERATIONS MANAGER 1

3.1.1 General Responsibilities

1. Responsible for the safe, reliable, and economic operation ,of both j units. ,
2. Directs operating activities required for safe, efficient ano ,

reliable electrical generation,

3. Supervises the Assistant Operations Manager, the Operations Administrative Supervisor, the Staff Engineer, and the Fire Fighter ,

Supervisor, ,

4 Serves as a member of the Station Operation Review Committee (SORC).

t 3.1.2 Authority

1. To make recommendations to the Shif t Superintendent or Control Room Commander regard!ng all matters of operation. ,
2. To order the shutdown of the reactor when, in his judgement, such action is required to protect the safety of the Station or the health and safety of the public. ,
3. To relieve any watchstander, if in his judgement such action is t warranted.

3.1.3 Source of Direction Station Hansger 3.2 ASSISTANT OPERATIONS MANAGER l-3.2.1 General Responsibilities ,

l

1. Responsible for the safety and operation of the unit's equipment per approved Station procedures.
2. Directs the activities of the Shift Superintendents, Unit Shift Supervisor / Trainees, and Day Shift Superintendents.
3. Assumes the responsibilities of the Operations Manager in his I absence.

3.2.2 Authority

1. To nake recommendations to the Shift Superintendent or Control Room Commander regarding all matters of operation. ,

1-3.1 0FMH Rev. 18

, . . _ . - . . ~_ .. . . - _ . .

'i 3.2 AS$1STANT OPERATIONS MANAGER 'l i

3.2.2 Authority i i

2. To order the shutdown of either reactor when, in his judgenent, '

such action is required to protect the safety of the Station or the  :

health and safety of the public.

3. To relieve any watchstander, if in his judgement such action is l

. warranted.  :

3.2.3 Source of Direction Operations Manager 3,3 OPERATING SHITT CREW 3.3.1 General {

i

1. An operating shift crew consists of a Shift Superintendent, one Unit Shif t Supervisor, one Supervicory Control Room Operator, one Control Room Operator, two Auxiliary Operators for the unit, two fire  !

Tighters, and three Auxiliary Operators assigned to the Shift  ;

Superintendent. The Shift Superintendent's Auxiliary Operators perform  !

normal Station functions and respond to fires as Fire Brigade members.  !

2. The minimum shif t crew composition for various modes of unit opera- ,

tion is shown in Section 6.0 of Station Technical Specifications.  ;

3.3.2 shift Superintendent (SS) [

1. Responsibilities  ;
a. Responsible for the safety and operation of the unit equip- I ment, in accordance with approved Station procedures.  !
b. Tunctions as the Shift Technical Advisor for the unit.
c. Provides requisite technical expertise to the Unit Shift Supervisor in the event of any abnormal operational occurrences.
2. Authority [

To assume command of the Control Room, or to order the shutdown of the ,

reactor when, in his judgement, such action is required to protect the 4 safety of the unit or the health and safety of the public.

!. 3. Licenses / Qualifications I

l L The Shift Superintendent shall possess a Senior Reactor Operator L license and normally will havs the training and qualifications of a Shif t Technical Advisor (STA).

1-3.2 OPMM Rev. IB

i 3.3 OPERATING $HITT CREW 3.3.2 Shift Superintendent (SS) ,

, 4. Source of Direction Assistant Operations Manager 3.3.3 Unit Shift Supervisor (US$)

1. Responsibilities t
a. Responsible for unit operations being conducted with approved i Station orders, procedures and technical specifications.
b. Maintains a record of shift activities,
c. Establishes unit electrical load, as directed by the Shift Superintendent or as emergency conditions dictate.
d. Becomes the solo authority when responding to any emergency dealing with the unit.

t

e. Hay function as the Shift Technical Advisor, if the Shift ,

Superintendent is absent or not qualified.

2. Authority To order the shutdown of the reactor when, in his judgement, such action is required to protect the safety of the unit or the health and safety of the public.
3. Licenses / Qualifications Senior Reactor Operator license for the assignad unit. ,
4. Source of Direction Shift Superintendent 3.3.4 Supervisory Control Room Operator (SCRO)
1. Responsibilities
a. Manipulates the controls of the assigned unit.
b. Provides direction for the activities of Control Room l

Operators manipulating the controls of the assigned unit, except as noted in $3.3.4.3.b.

1 1-3.3 0FKM Rev. 18 l

L

l .

f

i.<-

V l 3.3 OPERATING SHIFT CREW 3.3.4 Supervisory Control Room Operator (SCRO)

1. Responsibilities  :

i

c. Provides direction for the activities of the Auxiliary Operators on the unit. ,
d. Maintains a thorough understanding of operating equipment and systems conditions. ,
2. Authority To shut down the reactor when, in his judgement, such action is ,

required to protect the safety of the unit or health and safety of the  ;

public.

3. Licenses / Qualifications +
a. Holds a Reactor Operator license for the assigned unit.

! b. Must attain a Senior Reactor Operator license within a l

reasonable period of time. The Unit Shift Supervisor provides

! direction for the activities of Control Room Operators until such l

time that the SCR0 obtains a Senior Reactor Operator license. -

l- 4. Source of Direction L

L Unit Shift Supervisor 1

L 3.3.5 Control Room Operator (CRO) 4

1. Responsibilities The Control Room Operator monitors the unit's status and makes adjust-monts, as needed, to maintain control of the operating equipment and the activities relating to or affected by such equipment. The majority of duties are confined to the Control Room. However, he may perform -

specific activities in other areas of the Station under the direction of the Unit Shift Supervisor.

2. Authority  ;

To shut down the reactor when, in his judgement, the safety of the unit t

or the health and safety of the public is in jeopardy. .

3. Licenses / Qualifications Holds a Reactor Operator IIcense for the assigned unit.

l' 1-3.4 OPMM Rev. 18

3.3 OPERATING SHIFT CREW 3.3.$ Control Room Operator, (CRO)

4. Source of Direction Supervisory Control Room Operator (except as noted in $3.3.4.3.b) 3.3.6 Shift Technical Advisor If-neither the Shift Superintendent nor the Unit Shift Supervisor is quellflod as Shift Technical Advisor, then a Shift Technical Advisor w!!1 be assigned and will not have any collateral duties which could interfere with the performance of the Shif t Technical Advisor fuhetion.

3.3.7 Auxiliary Operators (A0s)

!. Responsibilities a .- Perform routine inspections and surveillance activities in the  !'

unit.

b. Maintain various logs and records as required by Station pro-
  • cedures.
c. In the absence of a Health Physics Technician, performs +

radiation and contamination surveys within the controlled areas,  :

as necessary, to provide radiological monitoring of their own work -t activities in accordance with the requirements of the Station r l Radiation Protection Manual.

L

d. Perform routine tests, install and clear tags, and return

, equipment to service as directed by the Unit Shift Supervisor or l' Supervisory Control Room Operator.

2. Source of Direction l

l Supervisory Control Room Operator 3.3.8 Fire Fighters

1. Responsibilities ,

The Fire Fighters perform routine inspections and surveillance activi-ties to support the lire protection and housekeeping programs as outlined in the Station Fire Prot 6ction Manual (SSFP). The Fire Brigade Leader assumes command of the Station Fire Brigade in the event of a fire. The fire fighters perform other duties as assigned by the Unit Shift Supervisor.

2. Source of Direction Unit Shift Supervisor 1-3.5 OPKM Rev. 18

- rl l'

3.4 OPERATIONS ADMINISTRATIVE SUPERVISOR \

1. Responsibilities
a. Provides administrative support for Operations Group personnel,
b. Provides reviews of Operations Group documents, maintains the ,

required historical flies, j

c. Coordinates procedure development, review, and revision.  !
d. Controls and coordinates the operations surveillance testing program.
2. Source of Directica Operations Manager 3.5 FIRE FIGHTER SUPERVISOR
l. Responsibilities
a. Directs the activities of the Fire Fighters,
b. Ensures that the Station Fire Brigade is trained and equipped to l respond to fire emergencies.
2. Source of Direction i

Operations Manager i

t P

l 1-3.6 0rHM Rev. 18

b' I 6 i

l' 4.0 TRAINING ,

4.1 SHIFT CREW TRAINING 4.1.1 Auxiliary Operators

1. Auxiliary Operators participate at three training levels, in for-mal and on-the-job training, as ti.ey progress through the qualifica.

tion levels to that of fully qualified Auxiliary Operator. The formal training is provided by the Training Group at the Station Training Center.

2. Selected /uxiliary Operators participate in the formal training to beceme IIcensed Reactor Operators. This training, conducted by the Training Center, features on-the-job segments in a unit control room and practical experience on the Station simulator.

4.1.2 Reactor Operators Selected Reactor Operators are trained to obtain a Senior Reactor Operator license which is recommended for the position of Supervisory Control Room.

Operator and required for the position of Unit Shif t Supervisor.

4.1.3 Unit Shift Supervisors Selected Unit Shift Supervisors are trained as Shift Technical Advisors in preparation for full qualification as a Shift Superintendent. The selected

' Unit Shif t Supervisors are removed from shif t and placed in a special Shif t Superintendent Trainee position to allow them to acquire training for the Shift Superintendent position.

4.2 OTHER TRAINING Licensed personne1' participate in an annual requalification program requirsd by federal regulations and conducted by the Training Group. Other specialized training (such as firefighting, radiation protection, emergency response, and management) is provided as needed.

l l  !

l l

l l

L L

l 1-4.1 OPMM Rev. 18 L

l

ri

!- [j t

5.0 POLICIES

  • i 5.1 TRAINING  !

It is important that Operations Group personnel be informed of current modifications to operating equipment and systems, procedure revisions, and license changes that have operational or safety ramifications. Such ec5nizance is maintained by i

1. on-shift formal instruction provided by the Training Group or supervisory r,ersonnel, or
2. Instruction as a part of regularly scheduled license retraining ,

that occurs during normal shift rotation (i.e., the normal training week).

5.2 SATETY All employees must strive to insure a safe and healthy working environment within the plant. Accidect prevention is the responsibility of all person-nel. - Prevention, the key to maintaining employee safety and health, is achieved when employees recognize existing or potential problems and act accordingly, before an accident occurs. '

Training, effective leadership, responsibility, and accountability are crucial factors in preventing acci-dents and should be promoted to the greatest extent possible.

Responsibility for safety in the workplace rests primarily with the indivi-dual, for whom the correct way to perform every job is the safe way.

1-5.1 OPMH Rev. 18 e --- --

we - u-mw+-o-,e,,, a-w-w---w e,w m o+ ..- ,,--e-m - - , -

4 s ,

6 ' .

1.0 SH1TT OPERATIONS  :

i l.1 OVERVIEW -

1.1.1 Operations Group Responsibilities

1. The Shift Superintendent maintains a broad perspective of:
a. condition 6 affecting the statu3 and safety of the unit, and I
b. conditions within the protected area. l
2. During events that require implementation of emergency procedures, the Shift Superintendent is designated Short Term Emergency Director  !

until properly relieved.

3. The Unit Shift Supervisor maintains a comprehensive perspective of
  • operational conditions affecting the safety of the unit. This is a matter of highest priority at all times.
4. The Unit Shift Supervisor should not become involved in any single
  • operation that would prove distracting when multiple operations are $

required in the Control Room, such as during a transient or an emergency. '

5. During emergencies, the Unit Shif t Supervisor is in charge of the, Control Room and shall remain in the Control Room unless properly relieved of duty. This command function is carried out per directives from the Executive Director - Nuclear Production. l
6. Shift Superintendents. Unit Shift Supervisors, Superv'aory Control Room Operators, Control Room Operators, Alternate Control Room Operators, and Auxiliary Operators on-shift nust be aware of and responsible for the status of equipment and systems at all times. .

NOTE A formal shif t turnover checklist ensures that appropriate Operations Group personnel are aware of the status of operating equipment and systems during shift changes.

7. Supervisors are responsible for the performance of personnel assigned to their shif t who could af fect the Station safety.
8. Operations Group personnels
a. must remain alert and within those immediate areas of the unit as required by their responsibilities until properly relieved of duty,
b. are responsible for monitoring the instrumentation and controls located within their areas,  ;
c. are responsible to believe and respond to instrument indica-tions until they are proven to be incorrect, and 3-1.1 OPMM Rev. 18

t.

f i

1.1 OVERVIEV 1 1.1.1 Operations Group Responsibilities

d. are responsible for taking timely and proper action to ensure safe operation of the Station.

e, it is considered good practice for the Supervisory Control Room Operator and the Control Room Operator to alternate watch positions on a regular basis. Also, it is considered good prac-tice for the Auxiliary Operators to alternate watch positions on a regular basis. This practice will facilitate maintaining overall proficiency in watchstanding responsibilities.

1.1.2 Licensed Operators Responsibilities

1. Licensed operators are responsible for shutting down the reactors
a. when they determine that the safety of the reactor is in jeopardy, or
b. when operating parameters exceed any of the reactor protection system setpoints and automatic action has not occurred.
2. Only licensed operators are permitted to manipulate the controls that directly affect a reactor's power level or reactivity. The only allowed exception is for training of licensed operator candidates, who are currently enrolled and participating in a licensed operator training program. A licensed operator must supervise all actions of the individual in training.
3. Operation of mechanisms and apparatus other than controls that may indirectly affect a reactor's power level or reactivity are permitted only with the knowledge and consent of a licensed operator.

4 A licensed operator shall be present "At the Controls" at'all times during the operation of the Station. The area designated "at the controls" is defined it the ySAR Chapter 1 Figure 1.2-32.

5. Licensed operators are responsible to provide notification to the Nuclear Regulatory Commission, through the Operations Manager, within 15 days of an occurrence of any physical condition or general health problem that may cause operational errors endangering public health and safety. Examples of such conditions are epilepsy, insanity, diabetes, fainting spells, defective hearing or vision or any physical or mental condition which might cause impaired judgement or motor, coordination.

1.1.3 Test Group Responsibilities There may be periods when testing activities are so involved or complex that it will be necessary to provide for test facilitators. Conditions may require the assignment of a Shift Test Director, Test Director Test Engineer, or any combination of those individuals.

3-1,2 OPMM Rev. 18

n 1.1 OVERVIEW

  • 1.1.3 Test Group Responsibilities (Continued)
1. Shift Test Director >

The Shift Test Director shall be equivalent to the Shift Superintendent regarding testing matters. Responsibilities include coordination of ,

technical problem resolution and overall plant coordination with the Shift Superintendent / Unit Shift Supervisor to ensure test conditions  ;

are established and maintained in a safe and prudent manner during the test.

The Shift Test Director is responsible for making recommendations to  :

the Shif t Superintenderat or Control Room Commander regarding operations outside the bounds of the test or that a potential undesirable plant  ;

condition exists.

2.. Test Directors Regarding testing matters, the Test Director shall be responsible to direct.the performance of specific assigned tests.

The Test Director is responsible for making recommendations to the Shift Superintendent or Control Room Commander regarding operations  ;

outside the bounds of the test or that a potential undesirable plant condition exists.

3. Test Engineers Test engineers shall be assigned, as data takers, log keepers, data
  • analyzers, or other functions that may be required to perform the test.

Test engineers are responsible for making recommendations to the Shif t Superintendent or Control Room Commander regarding operations outside the bounds of the test or that a potential undesirable plant condition L , exists.

1.2 ABNORMAL OR EMERGENCY CONDITIONS  ;

1.2.1 Response to Abnormal or Emergency Conditions

1. The operator shall believe instrument indications during abnormal or emergency situations until indications are proven to be false. ,

i

2. When operations are not as expected, the operator shall return to a known safe condition.

3-1.3 0FMM Rev. 18 1

)

i" r;

L

.f i

i 1.2. ABNORMAL OR EMERGENCY CONDITIONS 1.2.1 Response to Abnormal or Emergency Conditions I

3. It conditions warrant, power level shall be reduced as required  !

until the cause of the condition has barn determined and the core is known to be in a safe condition. I I

4. A manual reactor trip or'an Engineered Safety Features actuation I is initiated when ,. I
a. system parameters for either a reactor trip or an Engineered Safety Features exceed their actuation setpoint, i
b. automatic actuation does not occur, or
c. in the opinion of the operator such action is necessary to i protect the safety of the Station and the health and safety of_the public.

! 1.2.2 Fire Brigade

1. A Fire Brigade shall be maintained onsite at all times. The Fire Bri,tade shall not include those personnel required by the Control Room  :

evacuation procedure (Safe Shutdown and Cooldown from the Remote Safe Shutdown Facility OS1200.02). Only personnel who have satisfactorily (

completed the required fire fighting training shall be assigned as Fire Brigade members.

2. The members of the Fire Brigade. shall be designated on each shif t.
3. The minimum staffing level shall comply with that stated in Section 6.0 of the Technical Specifications. -

1.3 REACTOR TRIP OR SAFETY INJECTION l ,

1.3.1 Unit Shift Supervisor L Vhen a reactor trip or safety injection occurs, the Unit Shift Supervisor l l shall:

1. ensure that the Station is placed in a safe condition by directing the performance of necessary operations per approved procedures, 1 2. determine the subsequent actions to be taken, and
3. ensure that reactor trip documentation is reviewed and complete. [

3 1.4 0FMM Rev. 18

o j

-?

I.3 REACTOR TRIP OR SAFETY INJECTION l ,

1.3.2 shift Superintendent i

The Shift Superintendent shall notify the Operations Manager and other appropriate personnel and agencies. ,

i i- The Shift Superintendent (SS) shall ensure that any personnel who were <

involved in an event do not leave the Station, when relieved of duty, until released. The SS will instruct the individuals f.nvolved to prepare a writ-ten report of the event coverirt the actions taker. immediately prior to, during, and after the event.

The Emergency Operations Manager (EOM) will conduct an event critique with each individual, when the report is complete. The EOM will decide if an involved individual can be released or is to remain at the Station for further discussion of the event.

The EOM will make recommendations to the Operations Manager for any short-term actiohs which may b6 taken, prior to completing the Full Event Evaluation Report.

1.4 NOTIFICATION OF MANAGEMENT AND REGULATORY AGENCIES 1.4.1 Notification Process The Operations Manager is responsible for notifying the Station Manager or the Executive Director - Nuclear Production of any reported event, as l appropriate. The events considered appropriate should be contained in the situations listed below.

T The Shift Superintendent is responsible for notification of all appropriate offsite personnel. The Unit Shif t Supervisor is responsible for the notifi-cation of the Shift Superintendent and necessary onsite personnel. The following situations require timely verbal notification:

1. reactor trip,
2. Anadvertent radioactive liquid or gaseous releases,
3. major equipment f ailure or malfunction (includes all safeguards equipment),

l' 4. unexplained reactivity changes, 1

l' 5. loss of offsite power.

l

6. major personnel injury or radiation overexposure,
7. accidents occurring on Station property (except minor injuries),

3-1.5 OPMH Rev. 18

.j i

1.5 CONTROL R00H RETTRENCE INFORMATION ,

1.5.1 General

{

4. calling the Document Control Center to determine the latest revi-

[

sion if unable to verify status by any other means, and  ;

5. notifying the Unit Shift Supervisor if all other methods of ,

verifying the document status do not provide positive results. ,

1.5.2 Required Inf ormation In order to provide the needed information, the controlled reference infor-mation listed below will be available in the Control Room:

1.- Operations Group procedures,

2. Final Safety Analysis Report,
3. Technical Specifications, i
4. selected technical manuals,
5. selected prints,
6. Production Emergency Response Manual (NPER),
7. setpoints documentation, and
8. selected tables and curves.

1.6 'Com!UNICATIONS 1.6.1 Communleations to Operating Personng1

1. Communications and directions to operating personnel should be accurate, concise and explicit, and shall be confirmed for complex orders and for orders that include numbers.
2. Such confirmation shall be double-checked either by having the operator repeat the information back or by giving written direction so the individual who initiated the direction is satisfied that the orders are understood.
3. Upon completion of the directed evolution, the operator shall report back to the controlling station the specific action he.has taken. Whenever possible, the individual ordering an a~ction shall verify that it has been carried out correctly 'uy observing an expected indication (indication !!ghts, meters, gauges) and equipment or system reaction.

3-1.7 OFMH Re". 18

- .- -.. . . -- . .. - . . - ~ _ . - - . . .

t ti ii 1.6 COMMUNICATIONS l 1.6.2 Communications by Non-Watchstanders  ;

1. When a non-assigned individual observes a condition that appears  !

contrary to the Operating License, good operating practices, or con-  !

ditions of non-compliance with written procedures, that person should notify the Shif t Superintendent or senior watchstander, j

2. . If the person providir.g the information is not licensed, then the individual contacted is duty bound to provide an explanation to the informer, when no action is to be taken.
3. If the Operations Manager or Assistant operations Manager provides the information and the explanation for not taking action is inadequate, the appropriate response will be to order action taken. If action is still not carried out, then the Operations Manager or ,

Assistant Operations Manager has the responsibility, authority, and '

obligation to relieve the individual of watchstanding duties and assume ,

the watch until a proper replacement can be provided.

1.6.3 Announcing System The Gaitronics announcing system shall be used by operating personnel to: [

1. announce emergencies and unexpected events,
2. relay information regarding plant status, and
3. direct actions onsite when other methods are not possible. .

NOTE During emergency situations Gaitronics announcements should be made using the override pushbutton and normal telephone accost to the Gaitronics should be disabled.

1.7 WATCHSTATION CONDUCT 1.7.1 Watchstation Activities

1. Potentially distracting activities (e.g., radios TV, games, horseplay, hobbies, reading not related to work) in the Control Room and other watch stations are prohibited.

I

2. Necessary technical or administrative activities related to plant operations shall be conducted in a manner that does not distract the on-shift Operators.
3. Unauthorized or uncontrolled pictures, graphs, prints, etc., shall not be used as operator aids.

3-1.8 OPMH Rev. 18

P

.I

)

i 1.7 .VATCHSTATION CONDUCT 1.7.1 Vatchstation Activities 4 Activities that can distract key personnel, such as shift turnover and surveillance tests should not be permitted during evolutions such ,

as reactor startups.

l-

-5. Additional operators may be assigned to perform specific. functions  !

such as reactor startup, feedwater control, or other functions that l require constant dedicated observation and control. When additional  ;

operators are assigned, each operator shall be informed of the presence i of. additional operators and the span of control of each operator in the area. Specific attention shall be given to the dutiea expected should  !

an abnormal or emergency condition arise. In these cases, com-munications must be intensified since the additional personnel would .

not be part of the normal shif t compliment and therefore not f amiliar with the normal information exchange process.

1.7.2 Control Room Access NOTE Certsin individuals may be allowed access to the Control Room.

except in situations when their presence or actions are disruptive to the activities in progress as determined by the Control Room Commander. These individuals includes members of the Emergency .

Response Organization, representatives of the Nuclear Regulatory ,

Commission, members of the NHY Quality Programs organization, and other individuals approved for access by NNY management, such as ,

representatives of the Institute of Nuclear Power Operations.

1. Control Room access shall be restricted to persons on official business or other activities authorized by Station management as defined belows
a. Normal Operating Activities 1

During normal operating activities, the Control Room population consists of the on-shift operating crew and various represen- l tatives from the NNY organisation (including contract employees) j vho have a need to interface with the on-shift Operations staff. 4

The number of individuals in the Control Room will vary depending  !

on the extent of the activity in progress. The Control Room ]

l Commander has the responsibility and authority to limit the number i of people in the Control Room to those necessary for support of I I

the activities in progress.

I l

l l

3-1.9 CPMH Rev. 18 l

l 1^

l ,

1

~

it I!

1.7 WATCHSTATION , CONDUCT l 1.7.2 Centrol Room Access

b. Spacial Testing Activities Special testing activitise require additional test personnel to be  !

present in the Control Room during the performance of a test.

These test personnel shall be limited to those necessary for the -

performance of the test. The number of individuals required will ,

vary depending on the complexity of the test activity. I If, during the performance of the test evolution, a condition l arises which necessitates the termination of the test, the Control i Room Commander shall terminate the test and direct all personnel '

involved in the test activity, not required for mitigation of the situation, to exit the Control Room or to assemble in the Technical Support Center or cther specified location.

c. Observers and Visitors Observers may be allowed into the Control Room for training pur- .

poses during normal operaticas or special testing evolutions. The number of observers will normally be limited to groups of five (5). When circumstances indicate that it will be beneficial to l have a larger number of individuals observe a test evolution, the Operations Manager may authorise the additional observers. The f

authorization will be in the form of an approved observer list signed by tha Operations Hansger. Individuals not on the list shall not be allowed access to the Control Room. +

Visitors are allowed access to the Control Room for approved tours. The number of visitors in the Control Room at any ons time shall be limited to six (6), including the escort. Any special circumstances which may allow an increase in the number of ,

visitors must be approved by the Operations Manager. e 4

3-1.10 0FMH Rev. 18 l l

1 l

1

. _ - - . , - - _ . _ _ _ . - . - - , ~ . - ~ . . . .- _- . _ . _ . _ , .

._. . .- . . . ~. .

G ,

q

-6.'

1.7 'WATCHSTATION CONDUCT

- r

, 1.7.3 'The " Sacred Area' NOTE Certain individuals may be allowed access to the Sacred Area, except in situations'when their presence.or actions are disruptive to the activities in progress as determined by the Controi Room Commander. These individuals includes members of the Emergency ,  !

Response Organization, representatives of the Nuclear Regulatory i Commission, members of the NNY Quality Prugrams organization, and other individuals approved for access by NNY management,-such as representatives of the' Institute of Nuclear Power Operations.

e 1. The Sacred Area is'the restricted area within the Control Room delineated by a banJ of rod carpet.. Casual access to thir ares-for '

reasons not related to work is prohibited.

2. Permission to enter the Sacred Area for personnel other than the '

I licensed shift complement must be obtained from the USS or the senior .

on-shif t operator within the Sacred Area. When tasks require frequent entry, this requirement may be relaxed by the USS or senior operator.

3. During periods of abnormal or emergency operations, permission shall be obtained from the Control Room Commander.

4 -The senior on-shift operator shall limit the number of individuals within the Sacred Area to those absolutely necessary for the support

  • of normal operations, maintenance, or testing activities. The senior on-shift. operator shall direct individuals 1to exit the Sacred Area when in his judr,ement their presence is not necessary for. the existing plant.

conditions or their presence is distracting to the on-shift operating .

crew.

L -

5. Visitors may be allowed within the Sacred Area with the permission of the senior on-shift operator. Visitors in the Sacred Area shall be limited to one (1) individual at a time.

1.7.4 Watchstation Housekeeping and Cleaning L

[ Watchstations are maintained in .6 clean and orderly condition in the e interest of safe and efficient operations. All surface dusting and cleaning of control consoles, instrument panels, and computer consoles will be per-l- formed by shif t operating personnel.

1 D NOTE It is not advisable to clean or dust in some areas of the Control Room during power plant operations because of the risk of bumping or otherwise

! moving critical controls.

3-1.11 OPMM Rev. 18

~ - ,e-,- < m ,--* - -

- , , , -w, w, ,,.w

(!

~

%f

, Ii

,' .1.8: SHIFT EVOLUTION BRIEFINGS  !

p 1.8.1 . Individual Responsibilities i
1. Briefings shall be conducted for individuals involved in the per-  !

formance of the evolution. The detail of the briefing depends on the ,

complexity, logistics of the evolution, and the number of' people  ;

involved in the evolution. The Shift Superintendent determines the "need for.a pre-shift briefing. Briefings may be necessary depending on j the complexity of operations. ConsAderation should be given to the t skills'of the assigned operators.and the need for a focused review of the upcoming evolution.

2. The individual who is to perform the activity is responsible i
a. to adequately review the procedure, and

, b. to fully' understand what is to be done, and to.be cognizant of D' '

the limitations, precautions, and requirements of the procedure.

1.8.2 Planning Sessions _

Evolutions involving man) individuals, especially from two or more depart- .

ments or' disciplines, may require large formal briefings or planning sessions. Elf the evolution is complex and requires close coordine. tion of the individuals involved, briefing sessions should include

.1. review of'the appropriate section of the procedure by kay indivi-duals; 2.- examination- of each it.dividual's specific invcivement and respon-i sibility

3. discussion of expected results or. performance:
4. review of. precautions, limitations, emergency actions to be taken if centingencies arise, and review of applicable hold points with Quality Control personnel to ensure they are understood and
5. assurance that everyone understands the required interface and communications required.

o.9 GENERATOR LOAD CHANGES 1.9.1 Requested Load Changes

1. Generator load changes are normally requested by the system load dispatcher.
2. Non-emergency load changes shall be coordinated with the load dispatcher prior to the change.

3-1.12 OPMM Rev. 18 M -

'(

f!

.I !

- 1.12' INSTRUMENTATION AND CONTROL ,

t 1.12.1 Establishing' Additional Equipment Parameter Monitoring

' 2. Additional or alternate monitoring should be performed, as necessary, to ensure that abnor' mal or degraded conditions do not go undetected. This may be accomplished through observation of redundant indications or by monitoring local conditions or equipment parameters,. j as appropriate. Documentation of alternate or additional monitoring requirements may be kept at the discretion of the Unit Shif t Supervisor or Shift Superintendent in a non-routine surveillance los per ProcedureL OP 10.6.

I 1.13 RETURNING EQUIPMENT TO SERVICE 1.13.1 Verification

1. Following maintenance or modification to a system or component, the Operations Manager is ultimately responsible for the operable condition l of that equipment.
2. Verification may be accomplished by either special testing or by adherence to surveillance testing.
3. Safety systems are subject to the requirements of independent veri- .

ficstion in accordance with Procedure OP 10.1.

4. In ALL normal cases, work control documentation will be complete. .

On occasion, circumstances may dictate that OPERABILITY be declared I prior to the completion of the work control signatures. IF this is required and a DCR or Minor Modification (MMOD) is not involved, a description of the circumstances and methods used to declare the device "0PERABLE" should be reecrded in the USS Journal. Such documentation should include names, dates, and times, if the declaration is made on the strength of verbal communications. .If a DCR or MMCD is involved, the DCR or MMOD operability notification must be complete prior to l declaring the associated equipment operable.

1.13.2 Equipment Status Verification l

l Equipment status is verified by the.use of:

1. a current system lineup file, L 2. the tagging system,
3. the temporary modification system,  ;
4. the System Bypass / Inoperable status lights, and S. the procedures for the equipment in question.

3-1.14 OPMM Rev. 10

r.

1 i 1

2.0 PROCEDURES 4

2.1 COMPLIANCE WITH-PROCEDURES ,

2 .1.1 - Normal Responsibilities

1. Approved-written procedures shall be used, f
2. When a' discrepancy in a procedure exists the responsible supervisor shall resolve the discrepancy by submitting a written procedure-change.
3. No further procedural steps shall be performed until the procedure

. change is authorized by completion of sections A through E of the Station Operating Procedure Change Torm (SM 6.2C).

4. Attach copies of the procedure change form to the front of the pro- .

cedure being used and to any duplicate copies in other controlled flies which can be accessed by other watchstanders for plant use. The change number must be entered in the procedure body adjacent to the infor-mation being changed in all accessible procedures. The original change form is then forwarded, via the Shift Superintendent, to the Operations administrative office for turther disposition.

-2.1.2 Emergency Responsibilities In. cases of emergency Operations Group personnel are directed to follow itt ,

emergency operating procedures to mitigate the consequences of the -

emergency. Reasonable action that departs from a license condition or -

technical.. specification may be taken in an emergency when this action is immediately needed to protect the public health and safety AND no. action consistent with license conditions and technical specifications that can-

. provide adequate or equivalent protection is immediately apparent. 'Such action shall be approved by the Shift Superintendent or Unit Shift Supervisor prior to taking the action.

2.1.3- Followina Vrltten Procedure h .

?. NOTE 1

(.

Written step-by-step instructions are not required for routine i activities that are frequently performed, such as boron addition or

dilution, control rod adjustments, adjusting generator VARS, etc.)

however, when such instructions are available they shall be followed in accordance with the direction below.

1. Seabrook Station maintains reviewed and approved procedures that I

! govern certain processes and work activities. Where a procedure

[ exists, it shall be considered direction regarding the method of per-L forming the function.

l.

l lhk 3-2.1 0FKM Rev. 18 1

l l

4 4 l

, 7

~2.1 COMPLIANCE WITH PROCEDURES :f

>f -

c L 2.1'. 3 : Followina Written Procedure

2. . Procedures shall'be followed, but not without question. Where the procedure directs an action contrary to what is considered proper, that f procedure should be questioned and resolution sought with appropriate supervisory personnel. A procedure being questioned should not be deviated from on tho' basis that It is being questioned. The resolu-
  • tion: through appropriate' supervision, shall determine the proper

. course of action in accordance with the requirements of Procedures SH 6.1 and SH 6. 2.

3. In circumstances where time does not permit following the policy'in '

item 2 abcve, the procedure shall be followed unless there are overriding safety considerations involving:

1 a.- protection of-the health and safety of the public,

b. prevention of personnel injury or life threatening situations, or c.

prevention of severe damage to major plant equipment.

I

4. Forms are used in the execution of procedures to record pertinent.

information. Blanks provided on forms should be filled'in with either

the data requested or 'N/A" (not applicable) as appropriate. Large

? -

areas or large numbers of blanks may be. filled in with "N/A" and arrows if- each item is not applicable to the circumstance.

7L 5. Vendor supplied manuals / documents are to be used as references only and not in lieu of a step-by-step procedure.

If such uce-is required, '

the-manual / document shall have the same review, approval and control as an equivalent procedure.. Excerpts from vendor manus 1s may be used as defined in the Station Maintenance Manual (SSMA).

1
6. Personnel are required to memorize certain emergency response pro-cedures as part'of their license training program. Changes to these d procedures are presented in retraining.
7. If an evolution is suspended for an extended period of time, re-verification of the initial conditions is required.
8. Controlled copies of appropriate procedures shall be available to  !

all Operations Group personnel for in-plant use at their designated stations.

2.' 1. 4 Procedure Sign-Offs l

1. Certain procedures require the operator to initial specified steps l upon completion. Sign-offs are used as an aid in confirming the I completion of steps.

3-2.2 OPMM Rev. 18 l

l

cr:

l%' '

.t i

'M 2.1 COMPLIANCE WITH PROCEDURES 2.1.4 Frocedure Sign-Offs Si -

2. Sign-offs also provide formal documentation of the completion of '

critical steps inLspecific procedures and thus aid in any subsequent determination of equipment or system status.

3. Sign-offs are executed when specified'by the associated procedure or when included as an integral part of the procedure.
4. Sign-offs are made either by the operator performing the evolution or the supervisor in charge.
5. The completed pro:edure is forwarded to the Operations Administrative Supervisor. ,

2.2 SYSTEM LINEUPS 2.2.1 General i System lineups are used for establishing or confirming the status of equip-ment and systems. System lineups are performed as a prerequisite for system operation and selected components on a periodic basis for equipment status L veilfication.

t

(: System lineups are required to be performed a2ter major system outages, or '

=

at the. discretion of the Shif t Superintendent or Unit Shif t Supervisor. _

l- .2.2.2 Operator Instructions l<

1. The operators
a. when confirming system status, documents the position of all' L. specified system components, and notes any discrepancies to be resolved at a later time, or l.. b. when establishing system status, repositions components that
l. are found not to be. positioned in accordance with the system lineup.

The Unit. Shift Supervisor provides instructions to the operator whether to confirm or establish system status.

1.

I! NOTE l' When checking the position of a manual valve, the valve must always L be operated in the closed direction. NEVER CHECK A VALVE BY MOVING

( IT IN THE OPEN DIRECTION.

L

2. When the lineup is complete, with or without exception sheets, the L USS/SS shall review the lineup and make the appropriate System Lineup l

Log entry per OP 10.3, Control Room System Lineup Log.

3-2.3 OPMM Rev. 18 l

I.  ;

1

sawLHbmpshiso '

Yankee ~~- '

s Subject CONFIRMATORY ACTION LETTER 89-11 CORRECTIVE ACTION PLAN A. I from Date July 17, 1989 Distribution To Reference 1

Responsibility assignments for the individual action items in'the NHY CAL 89 11 Corrective Action Plan are provided in the enclosure. The completion dates will not be extended and must be met in order for NHY to i regain the level.of NRC trust that existed prior to the June 22, 1989 event.

I have arsigned J. H, Peschel to provide a weekly progress and status report to me.

Your cooperation will be required to complete these corrective actions in support of the NHY full power licensing schedule. 4 Edward A. Brown

^ x '

EAB meb '

Enclosure-Distribution D. E. Moody

  • J. M. Peschel J. M. Vargas P. H. Richardson J. J. Warnock cci T. C. Feigenbaum N. A. Pillsbury File 0001 RMD l

l l

bow Hampshire Yankee Division of Pubhc Service Company of New Hampshire P.O. Box 300

  • Seobrook, NH 03874
  • Telephone (603) 474 7521 I

A i

y ,m ,--

%; M ,

i

~

av , , .

, i

?

CONFIRMATORY ACTION LETTER 89-11  ;

['

CORRECTIVE ACTION PLAN ACTION f Procedure Compliance

1. Develop _ and issue an NHY' policy statement on Core Values' and '

r Vork Ethics.

SCHEDULED COMPLETION DATE: July 21, 1989  ;

g COMPLETION RESPONSIBILITY: E. A. Brown F

2. Develop and issue a comprehensive NHY policy to clearly define procedure adherence requirements for all NHY activities.

SCHEDULED' COMPLETION DATE: July 31, 1989 n-COMPLETION RESPONSIBILITY: J. M. Peschel >

-3.. Enhance the Seabrook Station Management Manual procedure compliance policy.to clearly specify that the only conditions '

under which~ departure from approved procedures is allowed is '

when such action is required to protect the public. health and. '

safety.. personnel safety or to prevent serious damage to plant equipment.

SCHEDULED COMPLETION DATE: July 31, 1989 COMPLETION RESPONSIBILITY: D. E. Moody 1

( 4.- Provide training to all NHY personnel on the enhanced NHY procedure. compliance policy.

L ' SCHEDULED COHPLETION DATE: October 6, 1989 l- COMPLETION RESPONSIBILITY: P. M. Richardson Command and Control

1. Replace the Vice President - Nuclear Production.

SCHEDULED COMPLETION DATE: July 28. 1989 L COMPLETION RESPONSIBILITY: E. A. Brown

2. Establish a shif t manning policy to ensure- that the Shif t Technical Advisor will not have collateral duties other than as the Unit Shift Supervisor or Shift Superintendent.

SCHEDULED COVPLETION DATE: August 15. 1989 COMPLETION RESPONSIBILITY: D. E. Moody l

1 1

n~

. o'

,e '
3. Revise' the Operations Man 2 gem:nt Manual to: .

~, 1)' -Clarify the integration of Startup Test personnel with the .,

shift operating crew, _ _ l

2) : Clarify responsibility and authority-when supplemental' ,

operators are assigned to a shift, 3)1 Encourage non-shif t licensed Operations personnelLto provide ,

s point of clarification or information when an assigned i operator's actions appear to be inappropriate or are not: 1 understood by the observert

'4)- Require.the Operations management licensed personnel to1 define their responsibilities when they enter the horseshoe ,

area of'the Control Room during testing. '

SCHEDULED COHPLETION DATE: August 18, 1989 COMPLETION RESPONSIBILITY D. E. Moody

4. Revise the policy on Control' Room Access to establish the maximum number of personnel allowed in the Control Room and the .

horseshoe area of the control Room.

SCHEDULED COHPLFTION DATE: August 18, 1989 COMPLETION' RESPONSIBILITY: D. E. Moody

]

Human Factors

~

1. Appoint a Haman Performance Evaluation System-(HPES) Coordinator

'and implement the INPO HPES Program.

SCHEDULED COMPLETION DATE: October 31, 1989 [

COMPLETION RESP 0NSIBILITY: E. A. Brown -

Post-Trio Review

1. Revise the Startup Test Program for power ascension testing to j require the Event Evaluation Report to be completed prior to a~

recommending reactor restart. ,

SCHEDULED C0KPLETION DATE: August ?l, 1989 COMPLETION RESPONSIBILITY: D. E. Moody- l

2. Revise the Post-Trip Review procedure to assign an individual as the NRC contact during the review process and to include a discussion of the trip with the NRC prior to reactor restart.

m) SCHEDULED COMPLETION DATE: August 31, 1989

  • COHPLETION RESPONSIBILIfY: D. E. Moody 2

~~ ^

, y an :s u

,4 1 +

. 3. - ' Review-the NHY Reporting Manual to determine if additional.

guidance is_ required for'10CFR50.72 reporting.-

' SCHEDULED COMPLETION DATEi' September 15, 1989 COMPLETION RESPONSIBILITY: J. M. Peschel' 4

Review-the Event' Evaluation procedure-to determine.if

~

4.

c enhancementstare required concerning the post-trip review, assignment of personnel, post trip critiques and written .,

c hr onol ogie s . ..

l SCHEDULED COMPLETION DATE: September 15, 1989 COMPLETION RESPONSIBILITY: J. M. Peschel

= Procedure Development

1. - Review 1-ST-22, ' Natural Circulation Test' to provide further instruction regarding initial conditions and to determine the ability to perform the test with the controls in automatic.

SCHEDULED COMPLETION DATE: August 18, 1989 COMPLETION RESPONSIBILITY: D. E. Moody

~

2. Review the Startup Test Program and remaining Startup Test-Procedures and revise as appropriate to incorporate the guidance l which currently exists in the Station Management Manual and  !

other applicable NHY manuals and to ensure the test procedure l format and' guidance is consistent with current' Station Operating-  !

Procedure guidance.

SCHEDULED COMPLETION DATE: September 15, 1989 COMPLETION RESPONSIBILITY: D. E. Moody ]

3. Reorganize Operations to. provide personnel to perform the J required development, periodic reviews and consistency reviews of Operations procedures, j SCHEDULED COHPLETION DATE: September 29, 1989 i COMPLETION RESPONSIBILITY: D. E. Moody i Test Process
1. Revise the Startup Test Program to remove the reactivity ,

computer from the horseshoe area'when it is not required for testing.

SCHEDULED COMPLETION DATE: September 1, 1989 COMPLETION RESPONSIBILITY: D. E. Moody 3

t.

~. -

p" ,

i

, e 1 -- :

P

. 2.- Revise the Startup Test' Program to require that a more comp- *

'rehensive pre-test briefing be provided prior to the test crev >

assuming the shift to ensure that the crew understands the-test.

criteria, expected parameters and required actions.

SCHEDULED.COHPLETION DATE: September 1, 1989 COMPLETION RESPONSIBILITY: D. E. Moody ,

3.- Revise the Startup Test Program to. require that additional preparation, including simulctor rehearsals when feasible, be given to test crews assigned to perform complex tests.

l SCHEDULED COHPLETION DATE: September 1, 1989 COHPLETION RESPONSIBILITY: D. E. hoody 4.- Revise the .Startup Test Program to provide controls . to ensure that all relevant Work Requests are closed out prior to the initiation of tests that utilize the relevant equipment for .,

example, steam dump valves on the non-nuclear side of the plant.

SCHEDULED COHPLETION'DATE: September 1, 1989 .

COHPLETION RESPONSIBILITY: D. E. Moody Hardware-

1. Complete a Licensee Event Report to include a 10CFR50.59 analysis'of the Natural Circulation Test and reactor trip.

SCHEDULED COHPLETION DATE: July 24 1989 COHPLETION RESPONSIBILITY: J. M. Peschel

2. Inspect and evaluate the steam dump valves to determine the cause of the failure, the. required corrective action and a schedule for completion of the corrective action.

SCHEDULED COHPLETION DATE: July 28, 1989 COHPLETION RESPONSIBILI?Y: D. E. Moody (1

3. Re-evaluate the routine maintenance frequency and the post-maintenance testing criteria for the steam dump valves.

L ,

SCHEDULED COHPLETION DATE: August 31, 1989 COHPLETION RESPONSIBILITYt D. E. Moody l

l L

l 4 l

l- t

g. ' '

3 :. '

g.t 4 Evaluate'the effect of the Natural Circulation Test on the. i

' charging nozzle and develop a-.shedule for any corrective j action.

{

') SCHEDULED COMPLETION DATE: ~ August 31, 1989 COMPLETION RESPONSIBILITY: J. M. Vargas j 5.. Examine valves similar to the : steam dump valves to determine if similar conditions exist, and develop a schedule for any.

. corrective action.

SCHEDULED COMPLETION DATE: August 31, 1989 s

COMPLETION RESPONSIBILITY: J. M. Varges

6. Evaluate the maintenance program to ensure that sufficient- i emphasis is placed upon post-maintenance testing and visual. s 11nspections.

SCHEDULED COHPLETION DATE: August 31, 1989 COMPLETION RESPONSIBILITY: D. E. Hoody

7. Evaluate the methods used to operate the letdown isolation valve' ,

to. determine the effects of any flashing that occurred during the test. Develop operating techniques to ensure the water does >

not flash to steam.

SCHEDULED'COMPLET17N DATE: September 30, 1989 COMPLETION'RESPONSItILITY: -J. M. Vargas  ;

Management Oversicht

1. Evaluate the effectiveness of,the NHY procedure compliance policy upgrade by means of>a combination of audits and curveillances to verify and assess the implementation of the policy, and provide a report to the President.

SCHEDULED COMPLIANCE DATE: October 31, 1989 COMPLETION RESPONSIBILITY: J. J. Warnock i:

5

, . ~; v 4:

. .=

FROCEDURE TRANSMITTAL CONTROL NO. AFFECTED DOCUMENT:

sugD TRANSNITTAL MO.

O 'St tion a a i nc<-r -i,a29 4

@ Operating Procedure STARTUP TEST PROCEDURE ISSUE DATE'7/i8f09 TO: L CC O l II @ ~ O Other < Fecir r > FAGE i OF. 1 INSTRUCTIONS l 1.

2. FLEASE UPDATE YOUR COPY OF THE ABOVE REFERENCED FROCEDURAL MATERIAL AS SHOWN BELOW AND DISCARD SUPERSEDE
3. SIGN THE BOTTON FORTION OF EACM PAGE OF THIS TRANSHITTAL TO INDICATE THAT THE REQUESTED ACTIONS HAVE BEEN 4.

RETURN ALL 3IGNED COEIES OF TIE FORM TO THE RND WITHIN TEN WORKING DAYS FOLLOWING RECEIFT.

YOU ARE NOT REQUIRED TO RETAIN A COPY OF THIS TRANSMITTAL AS TOUR SIGNED COFIES REMAIN ON FILE IN THE IW90-DCC.

WEU ISSUE' REPLACES BRIEF EXFLAMATION (IF MECESSARY)

NL2tBER FAGE(S) EFFECTIVE DATE REV NO. tRSIBER . FAGE(S) EFFECTIVE DATE REV NO.

, CHANGE 7 to 1-ST-20 02

~.

7

@ File the change sheet in f ront of the procedtsre. Draw a verticle line (revision bar) in the right hand margin adiacent to the information chanaed and enter the change number mest to it.

TR I AL ISSUED BY:

THE ITEMS SHOWN A00VE HAVE BEEN ENTERED AS SHOWN:

(Rigtf SUPERVISOR) ni10M BY:

y DATE:

RETURN THIS SIGNED TRANSMITTAL TO: SHARON RILEL11AM MAIL CODE: 49/DC,.___ _ , NYRet FORM'3-LOA

-Hew. C

' O t'.s g e- I ..s 2 1

~'

T .  : APPENDIX C STPD REV.2-

' FORM 7' RFABROOK STATION Startun Test Procedure Field Changg Sheet ] of S Test No. I- $7-0 0 Rev.No. Field Change No. 7

Title:

(ouT190L &oB VJoRTH M GAS 90G MkW Description of Change: SFE E N E'F~T Q Reason for Change: b 5 E~ $ W E FT 4 l

. Originator /Date : d h )./h .

DETEjlMINATION OF 10CFR50.59 APPLICABILITY  ;

L - 1. Does this field change: i

a. Make changes in the facility as described in the FSAR? Yes 3No j

' b. Make changes in procedures as described in the FSAR? Yes kNo L

c. Involve tests or experiments not described in the FSAR? _ Yes hNo
d. Involve changes to the existing Operating License or require Yes kNo additional license requirements?

- 2. If any of the above questions are answered ysi a safety evaluation per NHY Procedure 11210 is required.

Type of Change: INTENT NON-INTENT l Reactor Startup Supervisor Approval: M h , b ,. Date: 2 M#9 ,

Unit Shift Supervisor Approval: M Date:  ;

SORC Review / - &%G3 e ,

WMA.&h DF& Date: 7//#@

Station Manajer Apqrovg W]Bmtml H..P,00r0S mana Ju siv -

C00tf01 Numb 6I .. .

APPENDIX C STPD REV,2'

~

i

- FORM 7 SEABROOK STATION j

. hrtun Test Procedure Field Channe j

- 1 Continuation Sheet 1

. Sheet 3 of I Test No!-ST- 9 O Rev.No.

Field Change No.- D ihTL th sPn nA) o t- C H A A) (> q t

-1 i,(2AAIGFL c.aAW(X C Ar,hINc,T I- GT- 3 o )

9. DG Lr:TF mi>5miv/ sTrA Ri Aun ni=9 L4c c w erm Mcw/ J STEP g.F 4.s Kno wa B ELo w S./ SZWa ACC. A M mu2&4 nd /h C.6 D c.6d.,

c sh c B A RM, S'S D, 9 8Ch M Am AAYrAuT-

9. L o_4 4 1.JIS M a A s h .4 E L , M o 4 # Gr W EmAud '

hDR iv .u i 0 T u 1 / E~ % c> "A .

% M Y E M m A dl o-i- 1 O. / 7e

&Qi2 A" AujL>e ut h 3.O_oA% E L A h u[9,I M Mu_R AuM Ar- Awk 8, \ dvk4 ~

a5 GtW 3 cA% AA. -

v

\

N N

x .

N N

originator . b M ll/3'7

  • Attachment 951.

Page 1 of 1 1-ST-20 Revm 2.

Change 7-

]

Sheet 3 of 5 BOD W m HI RES ETS Predicts:1 " Stuck Rod" ID' H-10 Bank CB "A" (Prun Ref 2.5) . ,

t Relative Absolute-Bank Configuraticr1 Measured Pruilcted Error Error m '

% delta zho % delta zho 4 of Total % delta rho Predicted D ARO , 4

-C D Inserted ,

B -D & C Inserted A. D, C & B Inserted SE- D,' C, B & A Inserted -

'SD D, C, B, A & SE Inserted .

SC - D,-C, B, A, SE & SD Inserted SB & , D, C, B, A, SE, SD & SC N/A N/A N/A

.SA Inserted (Isss the " Stuck' Rod")

All Rods Measured Above *

(Isss the " Stuck Pod")

A+B+C+D All Shutdown Banks overlap .- Out Average Borcr1 Worth (ppn/ pan)

Conpleted by: Date:

Relative Error = Predicted - Measured x 100 = % of 'Ibtal Predicted Predicted Absolute Error = Predicted - Measured = % delta rho c

~'

<.- APPENDIX C- STPD REY.2

FORMT:

SEABROOK STATION.

. Startun Test Procedure Field Chaqgg Continuation Sheet e Sheet @ of -t Test No. I -ST- 90 Rev.No.

REAshM co e ca A UG s ?

b Field Change No. 7 i l.CHAUGG l S UPE Rc ED ED B 4 C H A .U6 & '9 '

9 43. OD4 9. I d AMcfAmAd 9. I OA A d '

m Y .w & .kk.M'A<si~#o & $d M -

o4.Niham fwA 8 Ise,aN cud A /sBA .mM '

(luaA " Stud M " N -10 .uaDel M .[A Cn m ) n a M l% dts$ Di m W i WoiQS aduL dse m>-M 'A '

l o A M e '/ b A> 6 A . "E att AJLL13m4-- -

i kMEwGtit nLa & W W JX-wa$9 i d'M aaAwn- uDR STtL Aar 588 aA s on  ;

NwXt\( A n-to E & .a  : ,

-/%A h LAl.a Au. usa 4 AirJwLw wwh wvh ~

I.

(kuur P K D

[

SM M cdSA A A 1%%T "

l A avAwtk>.6 /, C 8fh. / EJ.

~ bbbMAAf .U btAAA.At A/AH/At14 -S U-3. 'b l l i Originator: @ -

!'/

L

T APPEN0lx C ? ST PD' REV. 21

FORM 7 SEABROOK STATION Startuo Test Procedure Fleid Chang Continuation Sheet Sheet of Test No. l ~Y b Rev.No. Field Change No. D W \ . S DA& S~Ao 4b41 %M 'I & _

L  % su.Ala,, % -P m, a u.h M ~

0,e12 l

V  % ,2 xth nDwA Dt M Jar n cAkG Ma & A d An- saB a r,aI A Dak I h / A u-so n:ttk\ n n;TAndL

.5 w ' A a M a 2. Nro hE 4' l hu:r m nYn A & -

1 456 C nil >M $. 'd a]d h M %>ud Ar m A 't n u1AJ~

,A 4 AL[ h 0 M m ir,).-Ala Afw to# i

$nkrAxb Shn 9,) & / Azufa!and- 9.I N ' ~ N A d iiir 4 k us 7p a su a u k e A ve '

1 k A8A O.GAAr Auluk mulk (.wW

-  :. . a

- - ) ;

H ~l O Aur N & As.W $\. i

^

.E~ & '1k11 x L s1 a>sA. DrAABAAA$ ALT $.fL$1.% 'k annliilaa a\d'sXwMkuoNldk a m n r

caLALa a>rksw m &;

m % A 4 a xtu % o. _

_ l w

h 1 Originator: j

~

s

&* g .

4 NHYJ#890520

'n Hampshira Yankee - N=-

l

, Subjed l Core Values and Work Ethic ,

. Dote

{ From E. A. Brown y,1y 39, 1939 d0 All New Hampshire Yankee Employees We can expect that, in a few short months, New Hampshire Yankee will begin operating Seabrook Station commercially, producing electricity for one '

million New England homes.

I.am confident we will meet this challenging responsibility as a first-rate team of professionals dedicated to the safe, efficient operation of our power plant.

Central to our success as an organization are certain core values'and a work ethic that we must follow to achieve success.

In May I began working on.a statement on-core values and work ethic for New Hampshire Yankee. The document you are receiving today represents review!

and input from a variety of New Hampshire Yankee' employees.

I believe it is important that these values form the basis for everything we~do as' professionals and as New Hampshire Yankee employees.

This' core values and work ethic document will' serve its intended purpose only if it is formally integrated into the New Hampshire Yankee culture.

These values must'be reinforced, used and reread on an ongoing basis.

To that end, I have directed that the Employee Relations Department take steps to include implementation of this policy statement in the formal New Hampshire Yankee personnel evaluation process.

For the organization as a whole I have directed that there be prepared for me a semi-annual review of our adherence to this core values and work ,

ethic policy by the Independent Review Team.

I see this document as a continual reminder of the significant responsibility placed on each of us to operate Seabrook Station and manage New Hampshire Yankee in the most professional manner possible. Everyday application of these core values and work ethic will ensure that we're always ready to meet the challenge of our responsibility. ,

-er~~ f

, ,9 12ew. ~

E. A. Brown EAB:js1 Enclosure i

t New Hompshire Yonkee Division el Public Service Company of New Hompshire P.O. Box 300

  • Seabrock, NH 03874 + Telephone (603) 474 9521

$7' ;t-f' '

. July 19. 1989 L 3, s p

NEW HAMPSHIRE YANKEE'S

-- CORE VALUES AND WORK ETHIC +

PROFESSIONALISM-

' All of us mutt be professionals' in nanaging, operating and supporting our power ,

plant.

  • L our operation and support of the plant reflect a mission characterized by excellence and quality. ,

k

  • Our conduct at work and in the community affirms the values and ethics of our profession.
  • The values and ethics of our professional conduct are reflected in these principles:

-. respect for nucle'ar technology

-- pursuitgof excellence

-- integrity and ethical behavior

-- teamwork

-- checks and balances

-- respect for the individual '

-- accountability

-- open communication

-- cost effectiveness RESPECT FOR NUCLEAR TECHNOLOGY W'e understand and respect that'there are risks inherent in all technologies used to generate electricity. including nuclear technology. Our every action is taken with fu111 regard for the health and safety of our fellow employees and the general public. Ve.will operate Seabrook Station in a safe, reliable, environmentally sound and cost-effective manner.

  • We accept responsibility for nuclear and industrial sefety and minimizing radiation by demonstrating a commitment.to safety in all our actions.
  • We. review, comprehend and comply with licensing and governmental requirements.
  • Ve identify issues of safety and quality. and we initiate appropriate action to assure corrective action.

?

EXCELLENCE New Hampshire Yankee will be the 'best among the best'. committed to professional and operational excellence. Each of us is important and everything we do is important.

-* We create and accept challenging goals.

  • Ve always look for improvement in self, work and plant.

r.

~._

c 2 1

'

  • We freely discuss mistakes and take effective action to learn from them.
  • We take pride in our work and do it right -- the first time -- on time ..

every time.

  • We are-committed to excellence in housekeeping and will' operate and maintain a clean plant and-site.

INTEGRITY AND ETHICS Integrity and ethical behavior are the cornerstones of our New Hampshire Yankee professionalism. Each of us must firmly adhere to the highest ethical principles and_ practices: further, we must avoid practices which could even have '

the appearance of unethical behavior.

q

  • We refrain from and avoid any conflict of interest in our business transactions. ,
  • Designated NHY representatives communicate freely, openly and honestly with regulatory agencies, owners, auditing groups, vendors, industry groups, fellow utility companies, local, state and federal authorities and with each other.
  • Designated NHY media spokesmen are available, truthful, opea and complete in responding to inquiries from the news media.

T EAMWORK -

We have proven the value of teamwork over and over again and we recognize that the whole is bigger than the sum of its parts. We will continue to place a high value on teamwork at every level. Team effort will help us achieve our corporate objectives and goals.

  • We participate as team members by giving our mutual support and cooperation l to produce the best quality in all assigned work.

1.

  • We listen carefully and give full attention to each other.
  • We of fer and provide support to other members of the team. We seek and accept support from other team members.
  • We work together to solve problems and disa3reements at the peer level whenever possible.

l

  • We ' coach' others and provide constructive feedback -- and we receive constructive feedback willingly.

l-CHECKS AND BALANCES l

L We accept independent reviews and self assessments as a means to help us as l individuals and as company to initiate improvements and ensure excellence.

1

.. O I* ..g.-- y 3-l

  • -Esch'of-us recognizes that we collectively achieve excellence by seeking L improvement in our own performance.
  • LWe fully . recognize the importance of internal and external reviews of NHY's activities and provide candid, honest responses to all questions.  !
  • We participate in self-assessments by providing factual information.
  • We provide timely and complete responses to identified deficiencies and tete appropriate corrective actions. ,
  • We investigate problems in depth to ensure that the solution adequately identifies and corrects the cause.

1 RESPECT FOR THE. INDIVIDUAL We respect and value our talented, dedicated fellow employees as New Hampshire Yankee's most important asset./ Each person is an essential member of our team.

  • We recognize and show interest in each other as unique individuals with differing abilities, needs and motivations. ,
  • We recognize that the standard of performance is excellence, not perfection. We give honest, constructive and timely performance reviews.
  • We support individual career development and encourage our fellow workers to continue their education.
  • We practice and encourage individual initiative, creativity and thought in accomplishing job assignments, s
  • Ve follow the rule and the spirit of New Hampshire Yankee's policy on equal opportunity for all employees.

ACCOUNTABILITY We believe in accountability as the acceptance of ownership and responsibility for action and results associated with assigned duties and tasks. LA person who is accountable does not play the role of

  • victim' -- blaming mistakes or problems on others. We believe our accountability extends beyond out own job de*criptions to include the success of other departments, functions, and the entire company.
  • We constantly pursue the goals and objectives of our jobs -- seeking success for the entire company.
  • We identify what is required to do our jobs and will not hesitate to ask for the resources and support needed.
  • We support our fellow workers and know that their success depends on our actions.
  • We don't " pass the buck'.

y ,,- - - - - - g

{',. ,

' I i:

h. -+ .

4 I y ,._

' COST EFFECTIVENESS Cost effectiveness is the sensible and economical use of resources entrusted to us. We are accountable to the public, the Joint Owners and our fellow employees to be cost-effective. This is a professional and moral obligation. ,

  • We complete work on time and within-budget.
  • Ve analyze both cost and expected benefits before deciding to expend funds.  ;
  • We review programs regularly to be sure that resources are being : sed:

^ effectively.

  • We; expect'and demand full value from all employees, contractors and suppliers.

O

  • We encourage creativity in seeking ways tc, eliminate unnecessary expenses in the completion of assigned work.

4 F

  • We avoid duplication of work tasks.

COMMUNICATION-Open, frank comun. cations in plain English are absolutely necessary to help us

- meet our goals. - This applies to all comunications throughout New Hampshire Yankee -- up, down and sideways throughout the organization. ,

  • We comunicate goals and objectivos. clearly and concisely throughout the

-organization, and provide feedback regularlyLon how we are doing.

  • We foster open discussions on problems se as to determine root causes and '

find solutions.

  • We contribute to the systematic collection of data for the trending of key performance indicators which provides feedback throughout the organization to help improve performance and achieve excellence.
  • We provide timely information and encourage comunications that will fully brief management to enable proactive response to the needs of the organization.

l G

l l

1 i

1

.