Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Requests EIS for Plant Decommissioning". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19320A945  + (Requests Drawings or Diagrams Re Safe Shutdown by 800707)
  • ML20054C089  + (Requests Dual Unit Operator Licenses Be Issued.Listed Similarity in Operating Procedures,Response Characteristics, Tech Specs Control Room Design & Sys Design Justify Dual Licenses)
  • AECM-81-432, Requests Due Date Extension of 811204 for Submittal of Info Demonstrating Operability of Deep Draft Pumps,Per NRC 810818 Request.Util in Process of Reviewing & Upgrading Program for Maximizing Pump Operability  + (Requests Due Date Extension of 811204 for Submittal of Info Demonstrating Operability of Deep Draft Pumps,Per NRC 810818 Request.Util in Process of Reviewing & Upgrading Program for Maximizing Pump Operability)
  • AECM-84-0102, Requests Due Date for Balance of Info Re Isolation Actuation Instrumentation,Per Util 831215 & 0912 Ltrs,Be Extended Until 840316.Addl Time Required to Prepare Formal Submittal to Address Instrumentation & Control Sys Branch Concerns  + (Requests Due Date for Balance of Info Re Isolation Actuation Instrumentation,Per Util 831215 & 0912 Ltrs,Be Extended Until 840316.Addl Time Required to Prepare Formal Submittal to Address Instrumentation & Control Sys Branch Concerns)
  • ML19326C602  + (Requests Due Date for Response to IE Insp Rept 50-313/50-02 Be Extended to 750620)
  • ML20086Q388  + (Requests Duplicate Color Negative of Aerial Photograph of Oblique 45 Degree Angle Aerial Shot of Facility Taken by Eg&G in 1983)
  • ML19269C273  + (Requests Duplicates of Amend 10 to Indemnity Agreement E-49 So Licensee Can Submit Signed Copies)
  • ML20057F832  + (Requests Duplicates of Listed Publications Re Moderator Heat Transfer)
  • ML20136A908  + (Requests EC Marinos Be Added to Review Team in Area of Electrical Review for 3 Months Beginning 841126)
  • ML20126E369  + (Requests ECCS Performance Analyses Per AEC 710619 Interim Acceptance Criteria.Should Analyses Show Noncompliance, Program & Schedule for Improvements Must Be Submitted by 720701)
  • ML19343C272  + (Requests ECCS Performance Be Recalculated Per Assumption of Upper Head Water Temp Equal to Reactor Vessel Outlet Temp. Review of Westinghouse ECCS Evaluation Models Identified Incorrect Input Assumption)
  • ML19326C682  + (Requests ECCS re-evaluation Using NRC Approved Model W/O Nucleate Boiling Heat Transfer Correlation During Blowdown After Critical Heat Flux Prediction by Approved Correlation)
  • ML20207R211  + (Requests EDO Approval for Staff to Proceed W/Amend to 10CFR110.Amend Necessary to Implement Public Law 99-440, Comprehensive Anti-Apartheid Act of 1986 & Imposes Wide Range of Sanctions Against South Africa)
  • ML20203B420  + (Requests EDO Approval to Proceed W/Listed Proposed Amends to 10CFR110.Proposed Amends Would Have Minimal Impact on Persons Subj to Part 110 & No Acceptable Alternatives Exist. Amends Would Be Published as Final Rules)
  • ML20140E737  + (Requests EDO Position on Effect of Plant Const Delay & Future Regulatory Changes on Future Licensability of Plants. Const Restart Date Uncertain.Bpa Budgets Through Sept 1987 Do Not Include Funds for Const of Units)
  • ML20055C610  + (Requests EEI Assistance in Obtaining Info Re Mishaps Occurring During Solidification of Low Level Radwaste at Power Plants & Other Facilities,Including Waste Forms Failing to Solidify Completely & Waste Forms Swelling)
  • ML19351F720  + (Requests EIS Be Issued Prior to Opening of Licensing Hearings)
  • ML20037C715  + (Requests EIS Be Performed Before Hearings Reopened)
  • ML20037C713  + (Requests EIS Be Prepared Before License Granted)
  • ML20037C711  + (Requests EIS Be Prepared Before License Granted)
  • ML19270H469  + (Requests EIS Re Proposal to Flush Chemical Solvent Through Reactor Piping at Facility.Radionuclide Migration & Other Related Matters Must Be Determined)
  • ML19351F722  + (Requests EIS for Class 9 Accident Be Prepared Before Hearings Reopened)
  • ML20037C714  + (Requests EIS for Class 9 Accident Be Prepared Before Hearings Reopened)
  • ML19351F724  + (Requests EIS for Class 9 Accidents Be Prepared Before Hearings Reopened)
  • ML20206J282  + (Requests EIS for Decommissioning of Plant & Hearing in Humboldt County on Decommissioning)
  • ML19351F719  + (Requests EIS on Class 9 Accident Be Prepared Before License Granted)
  • ML19351F718  + (Requests EIS on Class 9 Accident Be Prepared Before License Granted)
  • ML20037C710  + (Requests EIS on Class 9 Accidents Be Prepared Before License Granted)
  • ML20053B596  + (Requests EIS on Projects in or Projected for Const in La)
  • ML20053B594  + (Requests EIS on Projects in or Projected for Const in La)
  • ML20248L156  + (Requests EPA Approval of Permanent Solution to Problem of Disposal of Contaminated Radioactive Matl.Approval of Option to Permanantly Dispose of Matl at Cheney Disposal Cell Is Requested from EPA & NRC)
  • ML20053B873  + (Requests EPA Status by 820611 of Draft Permit Re Substitution of Chlorination for Backflushing to Control Fouling in Intake Tunnel of Proposed Condenser Cooling Sys)
  • ML20054H605  + (Requests Eagle Estates Civic Assoc Statement Be Added to Record of Hearings at Riverhead,Long Island,Ny)
  • ML20081C605  + (Requests Earliest Consideration of Util Licensing Requests. Delay Will Be at Customers Expense)
  • ML19336A282  + (Requests Early Approval of Application for License to Export Triga Central Rod Element W/Adapter & Components to Austria. Components Will Not Be Retransferred W/O Prior Us Approval)
  • ML20244D397  + (Requests Early Approval of Revised Category Ii/Iii Physical Protection Plan.Relief from Implementing Comparability Upgrade Requirements of 10CFR73.46,App B & H Requested.Fee Paid Under Separate Cover.Encl Filed in Central Files)
  • ML17139A317  + (Requests Early Jul 1981 Meeting W/Util to Discuss Rescheduling of full-scale Emergency Plan Drill Until 820317)
  • ML19331B625  + (Requests Early Notice Be Provided in Fr to Notify Public of Util Plans to Submit Application for Expansion of Spent Fuel Storage Capacity of Facility in Sept 1980.Application Will Conform to NRC 780414 Guidance on Spent Fuel Pool Mods)
  • ML19309A996  + (Requests Early Review of Applications to Export Two Nuclear Reactors & Initial Fuel Cores in Advance of Util Award of Project.Early Review Would Be Significant Step to Enhancing Foreign Confidence in Us Supply & Licensing Process)
  • ML20043D277  + (Requests Early Safety Review on Significant Features of AP600 Licensing Review Basis Document in Parallel W/Advanced LWR Util Requirements Document)
  • ML20037B643  + (Requests Editorial Change to App A,Section E of License DPR- 2 Re Reactivity Limits Per Amend 4 of 620105 Application. Previous Request Made 610127.Technical Info on Revision to Moderator Temp Coefficient in License Encl)
  • ML18096A756  + (Requests Edsfi Plan,Including Scope,Personnel & Schedule in Order for NRC to Plan & Schedule Followup Insp)
  • ML20125E167  + (Requests Effective Date for Hourly Rate Be at Beginning of Billing Quarter & Date Be Included in Final Rule)
  • ML20148J887  + (Requests Effective Date of Lic to Be 790501 in Order to Maintain Continuity After Expiration of Doc Lic A305371,yet to Prevent Possession of Two Lics for Same Supply)
  • ML20148J892  + (Requests Effective Date of Lic to Be 790501 in Order to Maintain Continuity After Expiration of Doc Lic A305371,yet to Prevent Possession of Two Lics for Same Supply)
  • ML20055A231  + (Requests Effective Pages in License Demonstration Section & App a, Standby Licensing Conditions Cimarron Pu Plant SNM-1174, & Listing of All Applicable Pages & Respective Dates,Per 820329 Submittal for License Renewal)
  • ML16341C282  + (Requests Effectiveness Review by Commission Prior to Issuance of OL Authorizing Fuel Load & Low Power Testing of Unit 2.SSER 29 Issued on 850314 Addressing Design Verification Re Unit 2)
  • ML20215C689  + (Requests Eg&G Rept Re Status of Facility Released in Apr 1985,to Clarify Statements in NRC Cleanup Project Status Rept Concerning reactor-related Radiation)
  • ML20127G461  + (Requests Eg&G to Develop Sampling Plan for NRC to Followup on QC Inspector Qualification Issues.Requests That D Ross Chair Effort & Ensure Development of Sound Plan in Time for 841001 Effort)
  • ML20134H790  + (Requests Eics File on Allegation RII-95-A-0026,for Review)