ML16341C282

From kanterella
Jump to navigation Jump to search
Requests Effectiveness Review by Commission Prior to Issuance of OL Authorizing Fuel Load & Low Power Testing of Unit 2.SSER 29 Issued on 850314 Addressing Design Verification Re Unit 2
ML16341C282
Person / Time
Site: Diablo Canyon 
Issue date: 03/18/1985
From: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Asselstine, Palladino, Roberts
NRC COMMISSION (OCM)
References
NUDOCS 8503270010
Download: ML16341C282 (10)


Text

(P,S 4EgIr

~C

~

Op i 'Q+

(

+**++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

@pe ]. 8 1S85 MEMORANDUM FOR:

Chairman Palladino Commissioner Roberts Commissioner Asselstine Commissioner Bernthal Commissioner Zech FROM:

SUBJECT:

William J. Dircks Executive Director for Operations DIABLO CANYON UNIT 2 LICENSING SCHEDULE - NEED FOR EFFECTIVFNESS REVIEW Pacific Gas and Electric Company (PG8E) informed the staff, in a letter dated January 31, 1985, that Diablo Canyon Unit 2 should be ready to load fuel by the end of March 1985.

The staff's review of licensing issues and allegations is continuing.

On March 14, we issued Supplement No.

29 to the Diablo Canyon Safety Evaluation Report which addresses design verification as it relates to Unit 2.

In the near future, we expect to issue Supplemental Safety Evaluation Reports (SSERs) which will address (I) the resolution of all of the allegations received before July 31,

1984, and the resolution or status of all allegations received before January 31, 1985, with respect to Units I and 2 and (2) all of the other pertinent licensing issues.

Allegations received after January 31, 1985 will be screened by the staff prior to issuance of any operating license and will be addressed in a subsequent SSER.

In September 1981, the Commission amended 10 CFR 2.764 to el.iminate the need for Commission review of licensing board decisions to the extent of allowing plant fuel load and operation up to five percent of rated power (46 FR 47764, September 30, 1981).

However, in taking this action, the Commission specifically noted, in the accompanying Statement of Considerations, that such procedures would not apply to cases like Diablo Canyon where the licensing decision was issued before the effective date of the, amendment (September 23, 1981).

Board decisions issued before that date which authorize the issuance of a low power operating license are to be reviewed by the Commission before becoming effective, in accordance with the Commission s amendment to 10 CFR 2.764 effective on May 28,

1981, (46 FR 28627).

This is in addition to the effectiveness review required prior to the issuance of a full power license.

In referring to Diablo Canyon, the Commission did not distinguish between Units I and 2; an effectiveness review by the Commission appears, therefore, to be required prior to issuance of an operating license authorizing fuel load and low power testing up to 5X of.rated. power for Unit 2.

CONTACT:

C. Grimes, NRR X28414 PDR go

>0318 23 r

a

(

Q'$

~ tL rl<

The Commissioners The Commission performed an effectiveness review in September 1981, in connection with the issuance of a low power license for Unit 1 (CLI-81-22, 14 NRC 598).

The Commission's full power effectiveness review for Unit 1 was completed in August 1984 (CLI-84-13, 20 NRC 267).

The staff does not believe that there is any significant, difference in the units relative to the effect-iveness review factors set forth in 10 CFR 52.764.

This should facilitate the Commission's effectiveness review.

Similarly, the staff believes that the Unit 2 allegation-related matters and other pertinent licensing issues on which it is completing its review are, in general, of the same nature as those previously reviewed in connection with Unit 1, on which the Commission was briefed.

Therefore, the staff does not believe that any further briefing on these matters is necessary

and, upon completion of the Commission's effectiveness
review, we are prepared to issue a low-power license for Diablo Canyon Unit 2 as soon we have has established that all other matters are satisfactorily resolved.

(SigaetD gi>liam j. Dir~ke William J. Dircks Executive Director for Operations cc:

SECY OGC OPE DISTRIBUTION:

NRC PDR L PDR OELD

<Docket No.

50:323'PAS WDircks HDenton/DEisenhut HThompson/FMiraglia TNovak GKnighton HSchierling CGrimes SEP Rdg.

LE¹3 Rdg.

DKirsch, RV D:DL
  • HThompson 3/6/85 DD:NRR
  • DEisenhut 3/13/85 D:NRR
  • HDenton 3/13/85
  • PREVIOUS CONCURRENCES OBTAINED SEPB:DL LB¹3:DL LB¹3:DL
  • CGrimes:dk
  • HSchierling
  • GKnighton 2/19/85 2/19/85 2/19/85 AD:L:DL
  • TNovak 2/22/85 EDO WPiycks 3/>g/85 OELD DD:DL
  • LChandler
  • FMiraglia 2/26/85 3/6/85

hh1 HH.I )

H P

~

(

lt )

tt 4

I,

~

4 HH J

lI 1,4 HI

",P)

  • 4 t

1~

~

~

~ r I

, ~

h t

R/

~

P It

~

II

- Il

) ~ P,H

)

I H

~

4 H

H f

H F

IP 1

F4'+

4 I

4 1 Err 4 II' 4

)

I 4

t '4 I ~

ty H

'I f I

NH

)

1 I

I 1

I) Sj

)?

1' y't 4 ) ~ '

yl HH

, i ly

~ 1 4 A ]

h H

IJ H,y Hh H

tl

~ 1

UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 MEMORANDUM FOR:

Chairman Palladino Commissioner Roberts Commissioner Asselstine Commissioner Bernthal Commissioner Zech FROM:

SUBJECT:

William J. Dircks Executive Director for Ope ations DIABLO CANYON UNIT 2 LI NSING SCHEDULE - NEED FOR EFFECTIVENESS REVI Pacific Gas and Electric Company (PG

) informed the staff, in a letter dated January 31, 1985, that Diablo Canyon Unit 2 should be ready to load fuel by the end of March 1985.

Th staff's review of licensing issues and allegations is continuing.

In t very near future, we expect to issue Supplemental Safety Evaluation ports (SSERs) which will address (1) the resolution of all of the alle9 ions received before July 31,

1984, and (2) design verification, as i relates to Unit 2.

We will also issue SSERs addressing all of the other rtinent licensing issues and the resolution or status of all allegations r ceived before January 31, 1985, with respect to Units 1 and 2. Allegations received after that date will be screened by the staff prior to issuance o

any operating license and will be addressed in a

subsequent SSER.

In September 1981, the ommission amended 10 CFR 2.764 to eliminate the need for Commission review f licensing board decisions to the extent of allowing plant fuel load and eration up to five percent of rated power (46 FR 47764, September 30, 1981)

However, in taking this action, the Commission specifically noted, in the acco anying Statement of Considerations, that such procedures would not apply t cases like Diablo Canyon where the licensing decision was issued before th effective date of the amendment (September 23, 1981).

Board decisions issue before that date which authorize the issuance of a low power operating lice se are to be reviewed by the Commission before becoming effective, in accordance with the Commission's amendment to 10 CFR 2.764 effective on May 28,

1981, (46 FR 28627).

This is in addition to the effectiveness review required prior to th issuance of a full power license.

In referring to Diablo Canyon, the Commis ion did not distinguish between Units 1 and 2.

CONTACT:

C. Grimes, NRR X28414

4 r

~ t

The Commissioners The Commission performed an effectiveness review in September 1981, in connection with the issuance of a low power license for Unit 1 (CLI-81-22, 14 NRC 598).

The Commission's full power effectiveness review for tjnit 1 was completed in August 1984 (CLI-84-13, 20 NRC 267).

In this regar

, the staff does not believe that there is any significant difference in e units relative to the effectiveness review factors set forth in 10 CFR 52.7 4.

This should facilitate the Commission's effectiveness review.

Upon co pletion of the Commission's consideration of the associated review fact s

and conclusion regarding the effectiveness of the decision, the staff Iill be prepared to issue a low-power license for Diablo Canyon Unit 2 as soon as it has established that all other matters are satisfactori resolved.

Willi J. Dircks Exe tive Director for Operations cc:

SECY OGC OPE DI STRI BUT I ON NRC PDR L PDR OELD Docket No. 50-323 PPAS WDircks HDenton/DEisenhut HThompson/Fh1i ra ia TNovhk GKnighton HSchi er 1 ing CGrimes SEP Rdg.

LBg3 Rd

DKirsc, RV e

ehm VStello EDO r/f

  • PREVIOUS CONCURRENCES OBTAINED SEPB:DL LB83:DL LBP3:DL
  • CGrimes:dk
  • HSchierling
  • GKnighton 2/19/85 2/19/85 2/19/85 D:DL DD:

D:

R

  • HThompson D

a en ut HD ton 3/6/85 3/y/85 3/ )/85 AD:L:DL

  • TNovak 2/22/85 EDO WDircks 3/

/85 OELD DD:DL

  • LChandler
  • FMiraglia 2/26/85 3/6/85

F

"<<n, F

Ik J Std 8

f' 1

fp -'1

<<P t

P1 I,

I' 1 IJ I

g(

The Commissioners The Commission performed an effectiveness review in September 1981, in connection with the issuance of a low power license for Unit 1 (CLI-81-22, 14 NRC 598).

The Commission s full power ef ectiveness review for Unit 1 was completed in August. 1984 (CLI-84-13, 20 NRC 267).

In this regard, the staff does not believe that~there is any signif'nt difference in the units relative to the effectiveness renew factors set orth in 10 CFR 52.764.

This should facilitate the Commissioh's effectivene s review.

William J. Dircks Executive Director for Operations cc:

SECY OGC OPE Distribution:

NRC PDR L PDR ELD Docket No.

50-323 PPAS WDircks

HDenton, DEjsenhut HThompson/FMiraglia TNovak GKnighton HSchierling CGrimes SEP Rdg LBg3 Rdg.
DKirsch, RV JRoe TRehm VStello EDO r/f SEPB:DL CGrimes:dk 2/f t/85 DD:NRR DEisenhut 2/

/85 LB83:DL HSchierl g

2/Q /85 D:NRR HDenton 2/

/85 L

PL G

ghton 2/)9'/85

)

EDO WDircks 2/, /85 T

ak ~,

@+85 OELD 8

AD:

FNi

)a 8 qg/85 P$ /85

J J

l