Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199A384 + (Requests Addl Info Re Figures 1.2-18 & 1.2.2-20 of Section 9.1.4 of Ssar.Figures Related to Light Load Handling Equipment)
- ML19319A775 + (Requests Addl Info Re Financial Qualifications to Construct Facility.Info to Be Submitted as Amend to Application)
- ML19220B929 + (Requests Addl Info Re Financial Qualifications to Operate Facility & Permanently Maintain a Safe Shutdown)
- ML19263C663 + (Requests Addl Info Re Financing of Refueling Outage Bldg Const.W/Encl Questionnaire)
- ML17338A346 + (Requests Addl Info Re Fire Protec at Subj Facils.Info Concerns Water Supply,Cable Protec,Yard Hydrants,Smoke Venting Equip & Smoke Removal.Documentation Re Info Sought Encl)
- ML19259B611 + (Requests Addl Info Re Fire Protection Engineer Qualifications & QA Program Criteria Requirements)
- ML19269D526 + (Requests Addl Info Re Fire Protection Insulation on Cabling in Recirculating Pump Area.Evaluation of Need for Protective Insulation on Recirculating Pump Area Cabling & Associated Valve Operators to Be Completed by 790615)
- ML19320C827 + (Requests Addl Info Re Fire Protection Mods.Status of Evaluation Encl.Response Requested within 30 Days of Receipt of Ltr)
- ML19253B847 + (Requests Addl Info Re Fire Protection Program to Be Submitted by Telcon 780817 & in Writing 780822)
- ML20003E280 + (Requests Addl Info Re Fire Protection Safety Evaluation. Util Requested to Review BNL Encl Rept & Provide Info to Resolve Concerns)
- ML19319E109 + (Requests Addl Info Re Fire Protection Sys by 770801.NRC Position Resulting from 761019-22 Site Visit Encl.Info Required by 770801)
- ML19322A318 + (Requests Addl Info Re Fire Protection for Control Bldg Basement)
- ML20052F355 + (Requests Addl Info Re Fire Protection.Nrc Position on Alternative Safe Shutdown Encl)
- ML20234B048 + (Requests Addl Info Re First 10-yr Interval Inservice Insp Program,Including Verification That Volumetric Exam Will Be Performed on at Least 7.5% of Class 2 Piping Welds)
- ML19247B219 + (Requests Addl Info Re Fish Impingement Study)
- ML17219A241 + (Requests Addl Info Re Format of 861010 Application for Amend to License DPR-27.Separate Application or Suppl to 861010 Application Required Re Footnote on Tech Spec Page 3/4 6-11. Documentation Re Factors Under 10CFR50.92 Insufficient)
- ML20126J723 + (Requests Addl Info Re Four Potential Problem Areas in Design & Analysis of Instrumentation & Control Sys.Fsar Should Be Amended to Reflect Response to Encl Questions & Any Other Outstanding Items by 810801)
- ML19210C810 + (Requests Addl Info Re Fourth Set of First Round Questions Re OL Application.Includes Questions from Reactor Sys Branch & QA Branch)
- ML20212M567 + (Requests Addl Info Re Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events,In Response to 860123 Submittal Concerning 10CFR50.61.Response Requested within 30 Days)
- ML20244A686 + (Requests Addl Info Re Frosstey Fuel Performance Code Described in Rept PECo-FMS-003,including Gadolinia Matl Properties Used in Code & Upper Level of Gadolinia Concentrations to Be Used by Util)
- ML19260A482 + (Requests Addl Info Re Fsar.Fsar Should Be Amended Before 810131 to Reflect Responses)
- ML20003C424 + (Requests Addl Info Re Fsar.Fsar Should Be Amended to Reflect Responses)
- ML20003C172 + (Requests Addl Info Re Fsar.Response Should Be Submitted by 810327)
- ML20003C173 + (Requests Addl Info Re Fsar.Response Should Be Submitted by 810327)
- ML17213A563 + (Requests Addl Info Re Fuel Analysis in Order to Complete Review of SER Confirmatory Issue)
- ML19208B593 + (Requests Addl Info Re Fuel Pool Capacity Expansion)
- ML20004C177 + (Requests Addl Info Re Fuel Racks to Complete Review of 810123 Application,Supplemented on 810506,for Storage of New Fuel)
- ML19225C655 + (Requests Addl Info Re GE Analytical Model for LOCA Analysis in Accordance w/10CFR50 App K,Amend 1:Calculation of Low Flow Film Boiling Heat Transfer for BWR LOCA Analysis)
- ML17228A255 + (Requests Addl Info Re GL 92-01,rev 1 within 60 Days of Ltr Date in Order to Maintain Review Schedule)
- ML20045G948 + (Requests Addl Info Re GL 92-01,rev 1, Reactor Vessel Structural Intrgrity, Issued on 920306 to Compile Info Necessary to Confirm That Licensees & Permit Holders Satisfy Requirements for Ensuring Reactor Vessel Integrity)
- ML20141J045 + (Requests Addl Info Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, for Crystal River Nuclear Plant,Unit 3.Response Should Be Provided within 45 Days of Ltr Receipt)
- ML20140G552 + (Requests Addl Info Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, for Crystal River Nuclear Plant,Unit 3.Response Should Be Provided within 45 Days of Ltr Receipt)
- ML17311B269 + (Requests Addl Info Re GL 92-08, Thermo-Lag 330-1 Fire Barriers. Response Should Be Submitted within 45 Days of Ltr Receipt)
- ML18153A478 + (Requests Addl Info Re GL 92-08, Thermo-Lag 330-1 Fire Barriers at North Anna & Surry Power Stations,Units 1 & 2)
- ML20059A578 + (Requests Addl Info Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, to Help Ensure Timely Resolution of Fire Barrier Issues at Plant)
- ML20059A568 + (Requests Addl Info Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, to Help Ensure Timely Resolution of Fire Barrier Issues at Plant)
- ML17290A855 + (Requests Addl Info Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, to Help Ensure Timely Resolution of Fire Barrier Issues at Plant)
- ML17354A393 + (Requests Addl Info Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, for Plant)
- ML14183A611 + (Requests Addl Info Re GL 93-04, Rod Control Sys Failure & Withdrawal of Rod Cluster Control Assemblies, 10CFR50.54(f))
- ML18101A427 + (Requests Addl Info Re GL 93-04, Rod Control Sys Failure & Withdrawal of Rod Cluster Assemblies,10CFR50.54(f))
- ML20211A484 + (Requests Addl Info Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, Issued on 960930.Info to Be Submitted within 60 Days)
- ML20151T852 + (Requests Addl Info Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. Response Requested within 90 Days of Date of Ltr)
- ML15112A229 + (Requests Addl Info Re GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps, Issued 971007.Response Requested to Be Provided by 980918)
- ML20204D011 + (Requests Addl Info Re GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Hrps. Mutually Agreeable Target Date of 30 Days from Date of Ltr Was Established for Response)
- ML18153A318 + (Requests Addl Info Re GL 97-04, Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling Heat Removal Pumps, Issued on 971007)
- ML20237C413 + (Requests Addl Info Re GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps, Issued on 971027.Response Addressing Listed Issues Requested within 30 Days from Receipt of Ltr)
- ML20237C569 + (Requests Addl Info Re GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps, Issued on 971007.Response as Listed,Requested within 30 Days)
- ML20247L854 + (Requests Addl Info Re GL 97-04, Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling & Containment Heat Removal Pumps)
- ML19345A292 + (Requests Addl Info Re Gap Conductance Analysis Model to Allow AEC to Assess Impact on Schedule for Review of Densification Evaluation)
- ML20199F548 + (Requests Addl Info Re General Electric Medical System Application Dtd 980308,requesting Registration of V-Transact Rod Unit-Attenuation Sys to Be Manufactured by Elgems)
- ML20141D663 + (Requests Addl Info Re Generic Issue 79,concerning Thermal Stress in Reactor Vessel Flanges & Studs in B&W Reactor Vessel During Natural Circulation Cooldown & Info Re Listed Matls Properties,Within 45 Days)