ML20237C413

From kanterella
Jump to navigation Jump to search

Requests Addl Info Re GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps, Issued on 971027.Response Addressing Listed Issues Requested within 30 Days from Receipt of Ltr
ML20237C413
Person / Time
Site: Peach Bottom  
Issue date: 08/14/1998
From: Thadani M
NRC (Affiliation Not Assigned)
To: Geoffrey Edwards
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
GL-97-04, GL-97-4, TAC-MA0025, TAC-MA0026, TAC-MA25, TAC-MA26, NUDOCS 9808210143
Download: ML20237C413 (3)


Text

.

3 s

y August 14, 1998 Mr. Garrett D. Edwards

. Director-Licensing MC 62A -

PECO Energy Company Nuclear Group Headquarters-

' Correspondence Control Desk P.O. Box No.195 :

Wayne, Pennsylvania 19087-0195.

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION RELATED TO GENERIC LETTER 97-04, PEACH BOTTOM ATOMIC POWER STATION (PBAPS), UNITS 2 AND 3

' (TAC NOS. MA0025 AND MA0026).

Dear Mr. Edwards:

..The NRC staff issued Generic Letter (GL) 97-04, Assurance of Sufficient Net Positive Suction

Head for Emergency Core Cooling and Containment Heat Removal Pumps," on October 7,1997.

In that GL, the staff requested that the licensees provide information necessary to confirm the adequacy of the net positive suction head (NPSH) available for emergency core cooling and containment heat removal pumps. By letter dated December 30,1997, The PECO Energy Company (the licensee) submitted its 90-day response to GL 97-04.

The NRC staff has reviewed the response and is concemed that the Peach Bottom Atomic Power Station (PBAPS)l Units 2 and 3, may not be within its licensing basis because it appears that the containment overpressure needed to assure adequate NPSH is greater than the ovemressure previously approved by the NRC staff. Please provide a response within 30 days from the date of the receipt of this letter, discussing how your response to GL 97-04 related to containment overpressure compares with your current licensing basis, if it is determined that

' PBAPS, Units 2 and 3, is outside of its licensing basis, the staff expects that the licensee will

take prompt action to modify PBAPS, Units 2 and 3, licensing basis as appropriate in accordance with the regulations, or otherwise restore the facility to a condition consistent with the licensing

.{

- basis. Should you have any questions, please contact me at 301-415-1476.

I Sincerely,

/S/

Mohan C. Thadani, Senior Project Manager Project Directorate 1-2 Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278 cc: See next page

[

{'[C k 9

DISTRIBUTION L Docket File RCapra ACRS JKudrick PUBLIC.

MO'Brien CAnderson, RGN I-KKavanagh PDI-2 Reading MThadani RCaruso f

JZwolinski g OGC DSkay Pdhh PDlMk OFFICE PDI-2/D NAME bThadani:mw MhBkrk RCapra M DATE 7 //3/98

-I/h 8 A4/98 h

. OFFICIAL RECORD COPY DOCUMENT NAME: A:\\ nosh-GL9.704.RAI 9909210143 990814

?" " * #"#

giig FM SEIElCOPY

[p+

k UNITED STATES NUCLEAR REGULATORY COMMISSION If WASHINGTON, D.C. 206SH001

%, n

/

August 14, 1998 Mr. Garrett D. Edwards Director-Licensing MC 62A-1 PECO Energy Company Nuclear Group Headquarters Correspondence Control Desk P.O. Box No.195 Wayne, Pennsylvania 19087-0195

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION RELATED TO GENERIC LETTER 97-04, PEACH BOTTOM ATOMIC POWER STATION (PBAPS), UNITS 2 AND 3 (TAC NOS. MA0025 AND MA0026)

Dear Mr. Edwards:

The NRC staff issued Generic Letter (GL) 97-04, " Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling and Containment Heat Removal Pumps," on October 7,1997.

In that GL, the staff requested that the licensees provide information necessary to confirm the adequacy of the net positive suction head (NPSH) available for emergency core cooling and containment heat removal pumps. By letter dated December 30,1997, The PECO Energy Company (the licensee) submitted its 90-day response to GL 97-04.

The NRC staff has reviewed the response and is concemed that the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, may not be within its licensing basis because it appears that the containment overpressure needed to assure adequate NPSH is greater than the overpressure previously approved by the NRC staff. Please provide a response within 30 days from the date of the receipt of this letter, discussing how your response to GL 97-04 related to containment overpressure compares with your current licensing basis. If it is determined that PBAPS, Units 2 and 3, is outside of its licensing basis, the staff expects that the licensee will take prompt action to modify PBAPS, Units 2 and 3, licensing basis as appropriate in accordance with the regulations, or otherwise restore the facility to a condition consistent with the licensing basis. Should you have any questions, please contact me at 301-415-1476.

Sincerely, W

Mohan C. Thadani, Senior Project Manager Project Directorate 1-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278 cc: See next page

f s

9 r Mr. Garrett D. Edwards Peach Bottom Atomic Power Station, PECO Energy Company Units 2 and 3 I

J cc:

J. W. Durham, Sr., Esquire Chief-Division of Nuclear Safety I

Sr. V.P. & General Counsel PA Dept. of l

PECO Energy Company Environmental Resources 2301 Market Street, S26-1 P.O. Box 8469 Phi!Melphia, PA 19101 Harrisburg, PA 17105-8469 PECO Energy Company 4

ATTN: Mr. T. N. Mitchell, Vice President Board of Supervisors Peach Bottom Atomic Power Station

.'each Bottom Township i

1848 Lay Road R.D.#1 Delta, PA 17314 Delta, PA 17314 i

PECO Energy Company Public Service Commission of Maryland ATTN: Regulatory Engineer, A4-5S Engineering Division i

Peach Bottom Atomic Power Station Chief Engineer 1848 Lay Road 6 St. Paul Centre Delta, PA 17314 Baltimore, MD 21202-6806 Resident inspector Mr. Richard McLean U.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division P.O. Box 399 Department of Natural Resources j

Delta, PA 17314 B-3, Tawes State Office Building

}

Annapolis, MD 21401 1

Regional Administrator, Region i U.S. Nuclear Regulatory Commission Dr. Judith Johnsrud 475 Allendale Road National Energy Committee King of Prussia, PA 19406 Sierra Club 433 Oriando Avenue Mr. Roland Fletcher State College, PA 16803 Department of Environment 201 West Preston Street Manager-Financial Control & Co-Owner Baltimore, MD 21201 Affairs Public Service Electric and Gas A. F. Kirby, lil Company Extemal Operations - Nuclear P.O. Box 236 Delmarva Power & Light Company Hancocks Bridge, NJ 08038-0236 P.O. Box 231 Wdmington, DE 19899 Manager-Peach Bottom Licensing PECO Energy Company PECO Energy Company Nuclear Group Headquarters Plant Manager Correspondence Control Desk Peach Bottom Atomic Power Station P.O. Box No.195 1848 Lay Road Wayne, PA 19087-0195 l

Delta, PA 17314 I

l 1

l