Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML17249A962  + (RO Bulletin 74-10, Failures in 4-Inch Bypass Piping at Dresden-2)
  • ML17054D115  + (RO Bulletin 74-10A, Failures in 4-inch Bypass Piping at Dresden-2)
  • ML20235D957  + (RO Bulletin 74-14, BWR Relief Valve Discharge to Suppression Pool)
  • ML20054L562  + (RO Correcting Reporting RO 82-20 Re Missed Surveillance Requirement on Personnel Hatch.Time at Which Surveillance Due Should Have Been 1100-h Instead of 1300-h)
  • ML19345G120  + (RO DPR-7/74-1:on 740327,while Collecting Semiannual Liquid Poison Sample,Sample Did Not Flow Properly Until Poison Injection Equalizing Valve Tapped.Caused by Valves Failure to Close W/Proper Seating Due to Foreign Particle on Seat)
  • ML19345G119  + (RO DPR-7/74-2:on 740617,while Performing Picoammeter Trip Setting Test,No Trip Observed Upon Reaching 123% on Picoammeter 2.Caused by Trip Circuit & 150 Volt Internal Power Supply Components Degradation.Components Replaced)
  • ML19345G117  + (RO DPR-7/74-3:on 741105-06,during Test of High Pressure Trip Sensors,Two Trip Settings Found Out of Tolerance on High Side.Caused by Setpoint Drifts.Switch Settings to Be Left Near Tolerance Band Ctr)
  • ML19345G110  + (RO DPR-7/74-5:on 741224,feedwater Control Valve Air Supply Closed Rendering Feedwater Control Valve Unavailable for Remote Operation.Caused by Maint Personnel Leaving Control Air Supply Valve in Closed Position)
  • ML19345G113  + (RO DPR-7/74-7:on 741117,five of Eight Feedwater Sparger Holddown U-bolts Failed,Allowing Sparger to Shift 1.7 Inches from Initial Location.Broken Bolts Being Tested to Identify Failure Mechanism.Redesigned Holddown Clamps Installed)
  • PM-82-164, RO Discussing Substandard Smoke Detection Installation.Mods to Affected Areas & App R Smoke Detection Additions Will Coincide W/App R Schedule to Allow for More Complete Design Review & Consolidated Smoke Detection Plan  + (RO Discussing Substandard Smoke Detection Installation.Mods to Affected Areas & App R Smoke Detection Additions Will Coincide W/App R Schedule to Allow for More Complete Design Review & Consolidated Smoke Detection Plan)
  • ML20002D576  + (RO EST-NR/50-213/81-01:on 801217,increased Impingement Rates of Spottail Shiners Were Observed.Caused by Schooling Habits & Freezing of Tributaries,Resulting in Uneven Spatial Distribution in CT River)
  • ML19343C248  + (RO ETS-NR/50-213/77-9:as of 771019,hogchoker Impingement Exceeded Monthly Limit of 25.No Apparent plant-related Cause Seen)
  • ML19343C242  + (RO ETS-NR/50-213/78-01:as of 780129,common Shiner Impingement Exceeded Monthly Limit of 100.Caused by Seasonal Temp)
  • ML19343C240  + (RO ETS-NR/50-213/78-02:as of 780223,common Shiner Impingement Exceeded Monthly Limits of 100.Caused by Seasonal Temps)
  • ML19343C238  + (RO ETS-NR/50-213/78-03:on 780406,discharge Canal Ph Level Exceeded Tech Specs & NPDES Allowable Limits.Caused by Addition of Caustic to Waste Neutralization Tank Due to Caustic Metering Tank Overflow)
  • ML19343C237  + (RO ETS-NR/50-213/78-04:as of 780329,common Shiner Impingement Exceeded Monthly Limit of 100.Caused by Seasonal Temps & Highly Fluctuating Yr Class Size)
  • ML19343C232  + (RO ETS-NR/50-213/78-05:on 780430,bluegill Impingement Found to Be 36,exceeding Monthly Limit of 25.No Apparent Cause.No Trend Toward Increased Impingement Rates Seen)
  • ML19268C467  + (RO ETS-NR/50-213/79-06:on 7912166,unplanned Release of Radioactive Gas Occurred from Plant Site.Caused by Control Valve Relay Failure.Release Was Made to Stack & Monitored. Written Rept Will Follow within 10 Days of Occurrence)
  • ML19323C989  + (RO ETS-NR/50-213/80-02:on 800504,during Slurrying of Ion Exchanger,Instantaneous Release Rate Limit for Gaseous Discharge Was Exceeded.Slurrying Procedure Modified to Require 45-day Hold Period)
  • ML20039B353  + (RO ETS-NR/50-213/81-03:on 811201 Maint Personnel Incorrectly Opened Drain Valve Following Repairs to Valves Previously Isolated by Operrating Personnel.Chlorine Residual Exceeded Ets.Approx 300 Fish Killed)
  • ML19351D287  + (RO ETS-NR/50-245/50-336/80-1:on 800812,excessive Levels of Co-58,Co-60 & Ag-110m Were Observed in Third Quarter Sample of Oysters.Caused by Increased Plant Liquid Discharges.Tech Specs Will Be Revised)
  • ML19250C457  + (RO ETS-NR/50-245/79-02:on 791106,during Chemical Analysis of Floor Drain Sample Tank B,Curie Content in Tank Exceeded ETS Limits.Caused by Gradual Sediment Accumulation in Tank Bottom.Tank Was Thoroughly Flushed,Refilled & Sampled)
  • ML19338G055  + (RO ETS-NR/50-245/80-02:on 800922,at Steady State Power, Discovered off-gas Hydrogen Analyzer Weekly Calibr Check Surveillance Had Not Been Performed within Required Interval.Caused by Scheduling Oversight)
  • ML20008E204  + (RO ETS-NR/50-245/80-02:on 800922,offgas Hydrogen Analyzer Weekly Calibr Check Surveillance Found Not Performed within Required Time Interval.Caused by Scheduling Oversight. Technicians Reminded to Be Cognizant of Requirements)
  • ML19343C246  + (RO Ets/Nr 50-213/77-8P:on 771104,river Effluent Monitor Pump Found Inoperable.Caused by Open Electrical Breaker in Motor Control Ctr 5.Weekly Composite Samples of All Test Tank Discharges to Be Analyzed.Flow Sensing Device on Order)
  • ML19254E395  + (RO Following Scheduled Maint Outage:Rhr Sys Secured to Above Tube Bundel Tops Prior to Increasing Steam Generator Water Levels,Contrary to Tech Specs.Steam Generator Levels Immediately Raised to Normal Operating Level)
  • ML20064K399  + (RO Followup on 800403 Rept:On 800225,two Frequencies on Peak Shock Annunciator Sys Actuated Visual Alarms W/O Occurrence of Seismic Event.Problem Traced to Reed Switches in Containment Transmitter.Sys Checked & Recalibr)
  • ML20096C333  + (RO Followup rept:fire-rated Assemblies Found Inoperable During Jul 1984 Routine Surveillance,Per .Followup Rept Re Aug 1984 Inoperable Fire Doors Will Be Submitted by 840920)
  • ML19323B003  + (RO I-80-01:800407,reactor Tripped.Caused by Loss of All Offsite Power.Natural Circulation Established.Bus A1 Put on Startup Transformer 2.Bus B2 Was Tied to B1.B3 Which Was Tied to B4.Diesel Generators Secured)
  • BSEP-83-3042, RO I-83-01:on 830811,HPCI Sys Declared Inoperable Due to Problems Found During Operability Test.Ler Will Be Submitted by 830930  + (RO I-83-01:on 830811,HPCI Sys Declared Inoperable Due to Problems Found During Operability Test.Ler Will Be Submitted by 830930)
  • ML20053E807  + (RO Iii:On 810224,failure of Discharge Valve on Instrument & Svc Air Compressor Resulted in Loss of Instrument Air Sys Pressure Causing Plant Scram.Failed Check Valve Replaced W/Similar Unit)
  • ML21005A238  + (RO Ile (Answer Key))
  • ML051360233  + (RO Initial Exam - May 2005)
  • ML071730551  + (RO Initial Examination - Dresden April 2007)
  • ML020870768  + (RO Initial Examination 03/08/2002)
  • ML030020337  + (RO Initial License Examination November 2002)
  • ML17252B022  + (RO Inquiry Report 05000249/1972013Q Regarding the Discovery of High Steam and High Condensate Flow Switches to Be Out of Calibration)
  • IR 05000249/1972013  + (RO Inquiry Report 05000249/1972013Q Regarding the Discovery of High Steam and High Condensate Flow Switches to Be Out of Calibration)
  • IR 05000029/1972110  + (RO Inquiry Rept 50-029/72-110:on 721204,licensee Informed of Problem W/Control Rod Shrouds.Decision Reached to Replace 32 Control Rod Shroud Tubes.Estimated Time of Mod Completion Is 730430)
  • IR 05000263/1972017  + (RO Inquiry Rept 50-263/72-17Q Re Failure of RHR Pumps on 721216 During Operation in Shutdown Cooling Mode)
  • ML20207B881  + (RO Inquiry Rept 72-01 Re Excessive Leakage of C-14 Sealed Source Used in Thickness Gauge)
  • IR 05000289/1972004  + (RO Inquiry Repts 50-289/72-04 & 50-320/72-03:on 720925, Anonymous Phone Caller Claimed Bomb Was Placed Near Main Aisle in Turbine Bldg.Personnel Evacuated,Police Notified & Unsuccessful Search Conducted)
  • ML20107B219  + (RO Insp Rept 50-219/73-02 on 730213-16.Violations Noted. Major Areas Inspected:Follow Up to Previous Insps on 730102, 05 & 06 & Licensee Corrective Actions)
  • IR 05000219/1973003  + (RO Insp Rept 50-219/73-03 on 730228-0302,0305 & 07. Violations Noted.Major Areas Inspected:Licensee Environ Monitoring Program)
  • IR 05000219/1974010  + (RO Insp Rept 50-219/74-10 on 740530-31.No Violations Noted)
  • IR 05000219/1974011  + (RO Insp Rept 50-219/74-11 on 740609-10.No Violations Noted. Major Areas Inspected:Ipclrt)
  • IR 05000219/1974013  + (RO Insp Rept 50-219/74-13 on 740710-12.Violations Noted, Including Failure to Analyze Stack Gas Particulate Filter for Gross Alpha,Beta & Gamma Activity within One Wk of Removal)
  • ML20042B112  + (RO Insp Rept 50-247/72-08 on 720526,0602,08 & 15.Insp of Fuel Assembly Rod Guide Tubes Revealed Undersized Conditions & Internal Surface Scoring)
  • IR 05000263/1972003  + (RO Insp Rept 50-263/72-03 on 720508-09.No Noncompliances Noted.Major Areas Inspected:Radwaste Facility Const,Qa Program Development Status & Replacement of Barksdale AC Pressure Switches)
  • IR 05000264/1974001  + (RO Insp Rept 50-264/74-01 on 740306 & 07.No Violations Noted.Areas Inspected:Personnel Monitoring,Surveys & Survey Instruments,Rabbit Sys,Radwaste,Area Radiation Monitor,Water Monitor & Continuous Air Monitor)