Directorate of Regulatory Operations Bulletin 74-10A December 17, 1974 FAILURES IN 4-INCH BYPASS PIPING AT DRESDEN-2

(

REFERENCE:

RO BULLETIN NO. 74-10, DATED 9/19/74)

Description of Circumstances (amended):

The Commonwealth Edison Company notified the Region III Office of the Directorate of Regulatory Operations by telephone on December 13, 1974 of the finding of additional through-wall cracks in the 4-inch diameter bypass loop around the discharge valve of the "B" recirculation pump at the Dresden-2 facility.

The circumferential cracks were located adjacent to the heat affected zone of a weld which joins the "B" bypass loop piping to a weldolet fitting on the 28-inch diameter main coolant recir-culation piping.

The cracks were revealed during a planned ultrasonic reexamination of the bypass piping as a part of the inservice inspection program at Dresden-2.

Similar ultrasoni.c examination of the same weld in mid-September 1974 revealed no evidence of cracks at that time.

The Dresden-2 facility is currently shut down for refueling.

All welds in 'the 4-inch bypass piping are to be reexamined during this shutdown.

The licensee is evaluating the significance of the cracks which have been detected as well as procedures for their repair.

Action Requested of Licensees (amended):

For all boiling water reactor facilities of jet-pump design with operating license:

1.

Reevaluate the results of ultrasonic and other examinations con-ducted previously in response to RO Bulletin 74-10 or as part of the baseline inservice inspection for those facilities not examined in response to RO Bulletin 74-10.

Notify this office by telephone by December 23,

1974, and reaffirm in writing by December 30, 1974, of the results of your reevaluation.

2.

Reexamine

{by ultrasonic or other suitable volumetric inspection technique) all accessible welds in the bypass piping lines around the recirculation pump discharge valves at the earliest of the following conditions:

i

a. If presently at cold shutdown and scheduled to remain in this condition for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or more, prior to resuming power operation.
b. If presently at a condition other than cold shutdown, at such time that (within the sensitivity specified in paragraph C.5.

of Regulatory Guide 1.45) any reactor coolant leakage detection system indicates, within a period of four hours or less, either an increase in unidentified leakage to twice the determined normal rate of unidentified leakage or an increase in the rate of unidentified leakage by two (2) gpm or more.

(In no case, however, shall the rate of leakage exceed that specified in the technical specifications without those actions required of the technical specification being taken.)

c.

Next cold shutdown, regardless of duration.

Notify this office in writing, within 10 days following their completion, of the results of the reexaminations conducted in response to this Bulletin.

Your written notification should also include a brief description of the examination technique and procedures

employed, as well as a description of any special engineering disposition or repairs necessitated by the results of these reexaminations.

A copy of all written notifications to this office (including all attachments) should also be sent to the Assistant Director for Construction and Operations, Directorate of Regulatory Operations, AEC Headquarters in Mashington, D.C.

<q'I<< CII+

~~4IIS 0$

UNITED STATES ATOMIC ENERGY COMMISSION Ol ACCTOAATC OI-ACGULATO AY OPC AATIONS ACGION I 631 PARK AVENUE KING OF PRUSSIA, PENNSYLVANIA 19406 December 13, 1974 Niagara Mohawk Power Corporation Attention:

R. R. Schneider Vice President, Electric Operations 300 Erie Boulevard West

Syracuse, NY 13202 Docket No. 50-220 Gentlemen:

The enclosed RO Bulletin requests action by you with regard to your power reactor facility(ies) with operating license or construction permit.

Should you have questions regarding this Bulletin or actions requested of you, please contact this office.

Sincerely, James P. O'Reilly Director

Enclosure:

RO Bulletin 74-16 "Approved by GAO, B-180225 (R0072), clearance expires 7-31-77.

Approval was given under a blanket clearance specifically for identified generic problems."

cc:

P. A. Burt, General Superintendent, Nuclear Generation T. J. Perkins, Plant Superintendent C. L. Stuart, Operations Supervisor E.

B. Thomas, Jr., Esquire A. Z. Roisman, Counsel for Citizens Committee for Protection of the Environment bcc:

L RO Files

'R Central Files PDR Local PDR Reg.

Reg.

Rdg Rm State of New York