Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "RAIs for GNF-A Safety Analytic Methods". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML13154A483  + (RAIs Following Ifib Analysis of APs 2013 Decommissioning Funding Status Report for Palo Verde Units 1, 2 and 3)
  • ML13154A431  + (RAIs Following Ifib Analysis of Edisons 2013 Decommissioning Funding Status Report for San Onofre Units 2 and 3)
  • ML13154A439  + (RAIs Following Ifib Analysis of FENOCs 2013 Decommissioning Funding Status Report for Beaver Valley 1 and 2)
  • ML13154A444  + (RAIs Following Ifib Analysis of FENOCs 2013 Decommissioning Funding Status Report for Davis-Besse and Perry)
  • ML13154A511  + (RAIs Following Ifib Analysis of NextEra Energys 2013 Decommissioning Funding Status Reports for Duane Arnold Energy Center and Point Beach Units 1 and 2)
  • ML13154A505  + (RAIs Following Ifib Analysis of NextEra Energys 2013 Decommissioning Funding Status Reports for Seabrook)
  • ML13154A495  + (RAIs Following Ifib Analysis of PSEGs 2013 Decommissioning Funding Status Report for Hope Creek Generating Station)
  • ML20245E175  + (RAIs Letter 08/31/2020)
  • ML20245E177  + (RAIs Public 08/31/2020)
  • ML19260G207  + (RAIs Regarding Anl Request for NRC Review of the Quality Assurance Plan Program for the Sfr Metallic Fuel Data Qualification)
  • ML112312318  + (RAIs Regarding Temporary Non-Code Compliant Condition)
  • ML102320276  + (RAIs Regarding to Request for Enforcement Discretion for Fire Protection)
  • ML19108A428  + (RAIs SLRA Set 1_ERO(Rev 1))
  • ML21161A119  + (RAIs Set 1 Final Aging Management of Irradiated Concrete and Steel Reactor Vessel Supports Final)
  • ML24309A216  + (RAIs TSTF-601, Extend Shield Building Completion Time After Refueling)
  • ML25241A166  + (RAIs TSTF-604, Rev. 0, Revise Ventilation System Actions)
  • ML23045A205  + (RAIs WEC Ash Part 1)
  • ML20028D892  + (RAIs and Responses, Safety Analysis Report (Sar), Chapter 15, Materials Evaluation)
  • ML080980500  + (RAIs for Braidwood Interim SG Tube ARC LAR)
  • ML19128A278  + (RAIs for Braidwood Tvel LTA Application)
  • ML19128A277  + (RAIs for Braidwood Tvel LTA Application)
  • ML21235A022  + (RAIs for Centrus Energy Corp./American Centrifuge Operating License Amendment Application for Using Digital IROFS - Cover Letter)
  • ML083560006  + (RAIs for Crystal River 3 LAR 301 - Application to Modify IST for Replacement Steam Generators (MD9547))
  • ML21063A320  + (RAIs for Dresden, Units 2 and 3, Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition (EPID L-2020-LLA-0239) (E-mail))
  • ML14238A517  + (RAIs for EPRI Reports 1022909 and 1025203 Referenced in NEI 12-16 Rev 2)
  • ML13190A215  + (RAIs for Hope Creek Regarding Response to Order EA-12-051 (SFP Instrumentation))
  • ML13190A221  + (RAIs for Hope Creek Regarding Response to Order EA-12-051)
  • ML072330440  + (RAIs for ISI Summary Report Steam Generator- MD3158)
  • ML20092G344  + (RAIs for LAR to Revise Technical Specifications 6.8.4.o, Reactor Coolant Pump Flywheel Inspection Program)
  • ML23173A063  + (RAIs for Limerick Generation Station, Units 1 and 2 - LAR and Exemption Request for Digital I&C Installation Support)
  • ML22292A240  + (RAIs for Master Dtf Agreement on IP1 IP2 10 18 2022)
  • ML14276A013  + (RAIs for NEI 12-16)
  • ML093521424  + (RAIs for Peach Bottom U2 Type a Test Extension LAR)
  • ML22026A102  + (RAIs for RR 20 - Alternate Examination of Canopy Seal Weld Control Element Drive Mechanism Number 27 Housing)
  • ML110550698  + (RAIs for Requested Exemption Regarding Part 26)
  • ML25017A282  + (RAIs for Review: Waterford 3 - Review of Steam Generator Tube Inspection Report for the 25th Rf)
  • ML13192A228  + (RAIs for Salem Regarding Response to Order EA-12-051 (SFP Instrumentation))
  • ML13179A303  + (RAIs for Salem Regarding Response to Order EA-12-051 (SFP Instrumentation))
  • ML13179A293  + (RAIs for Salem Regarding Response to Order EA-12-051 (SFP Instrumentation))
  • ML122630012  + (RAIs for Salem U1 Relief Request S1-I3R-114 TAC No. ME8565)
  • ML080780564  + (RAIs for Vogtle Interim SG Tube ARC LAR)
  • ML080710160  + (RAIs for Vogtle Interim SG Tube ARC LAR)
  • ML18018A005  + (RAIs for WCAP-16096-P/NP, Revision 5 Software Program Manual)
  • ML22235A113  + (RAIs for the Model No. HI-STAR Atb 1T Package)
  • ML22147A123  + (RAIs to Support Review of GNF-A Request to Approve Safety Analytic Methods)
  • ML22040A177  + (RAJ-II Safety Analysis Report Amendment Pre-application Meeting)
  • ML20213B073  + (RAJ-IIIS DOT Revalidation - Rsi Response Package)
  • ML20213B078  + (RAJ-IIIS Revalidation Rsi Response Attachment 4 - RAJ-IIIS Drawings (TTO-T06-047-01 & TTO-T06-047-02))
  • ML20213B075  + (RAJ-IIIS Revalidation Rsi Response Attachment 2 - SAR Section (B)-B Reference (1): Heat Transfer)
  • ML20213B077  + (RAJ-IIIS Revalidation Rsi Response Attachment 3 - SAR Section (B)-B Reference (2): Structural Material)