MONTHYEARML24213A2602024-07-31031 July 2024 Request for Additional Information LAR to Support Implementation of Framatome Gaia Fuel IR 05000336/20244032024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 ML24113A2502024-04-22022 April 2024 Request for Additional Information (e-mail 4/22/2024) License Renewal Commitment for Aging Management Program of Alloy 600 Components ML24065A3112024-03-0505 March 2024 Request for Additional Information (Redacted) (03/05/2025 E-mail from R. Guzman to S. Sinha) Framatome Gaia Fuel LOCA LAR ML23318A0952023-11-14014 November 2023 Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel ML23199A2832023-07-18018 July 2023 Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23089A1882023-03-29029 March 2023 Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report ML23073A1802023-03-14014 March 2023 Notification of Commercial Grade Dedication Inspection (05000336/2023010 and 05000423/2023010) and Request for Information ML22251A1292022-09-0909 September 2022 Request for Additional Information Related to Response to Generic Letter 2004-04 ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML21225A5022021-08-13013 August 2021 Request for Additional Information for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Appendix E of Fleet Report Com-Naf-2 (EPID:L02021-LLT-0000) Public Version ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21182A2902021-07-0101 July 2021 7/1/2021 E-mail - Request for Additional Information Alternative Frequency to Supplemental Valve Position Verification Testing Requirements ML21112A3082021-04-22022 April 2021 Request for Additional Information (E-mail Dated 4/22/2021) License Amendment Request for Measurement Uncertainty Recapture Power Uprate ML21105A1152021-04-15015 April 2021 Request for Additional Information (e-mail Dated 4/15/2021) Proposed LAR for Addition of Analytical Methodology to the Core Operating Limits Report for a LBLOCA ML21078A0332021-03-18018 March 2021 NRR E-mail Capture - Millstone Power Station, Unit 2 - Request for Additional Information - Proposed LAR to Revise TSs for Steam Generator Inspection Frequency ML21076A4622021-03-17017 March 2021 NRR E-mail Capture - Draft RAI for Versatile Internals and Component Program for Reactors Vipre Code Review (L-2021-LLT-0000) ML21077A1652021-02-26026 February 2021 (02/26/2021 E-mail) Draft Request for Additional Information LAR to Revise Technical Specifications for Steam Generator Inspection Frequency ML21034A5762021-02-0303 February 2021 Request for Additional Information (e-mail Dated 1/3/2021) Alternative Request RR-05-06 Inservice Inspection Interval Extension for Steam Generator Weld Inspections ML20246G5612020-09-0202 September 2020 Request for Additional Information (E-mail Dated 9/2/2020) License Amendment Request for a One-Time Deferral of the Steam Generator Inspections ML20244A2902020-08-31031 August 2020 Request for Additional Information (E-mail Dated 8/31/2020) License Amendment Request to Revise Battery Surveillance Requirements ML20231A7172020-08-18018 August 2020 Request for Additional Information (e-mail Dated 8/18/2020) License Amendment Request to Revise TS Table 3.3-11 Accident Monitoring Instrumentation ML20184A0052020-07-0202 July 2020 Request for Additional Information (E-mail Dated 7/2/2020) Relief Request IR-3-33 for Limited Coverage Examiniations ML20075A0322020-03-15015 March 2020 Request for Additional Information (E-mail Dated 3/15/2020) Alternative Request IR-4-03 for Use of an Alternative Non-Code Methodology to Demonstrate Structural Integrity ML20050F9212020-02-19019 February 2020 Request for Additional Information (E-mail Dated 2/19/2020) Proposed LAR to Revise TS 3.8.1.1, AC Sources Operating ML20023D0372020-01-23023 January 2020 Request for Additional Information (E-mail Dated 1/23/2020) Proposed LAR to Revise TS 3.8.1.1, AC Sources Operating ML19361A0382019-12-23023 December 2019 12/23/19 E-mail from R.Guzman to S. Sinha - Draft Request for Additional Information Planned Audit of LAR to Revise TS 3.8.1.1 ML19277B9082019-10-0707 October 2019 Supplemental Information Needed for Acceptance of Requested Licensing Action Extension of Technical Specification 3.8.1.1, A.C. Sources - Operating, Allowed Outage Time ML19248D7552019-09-0505 September 2019 Request for Additional Information Via E-mail from R.Guzman to S. Sinha Proposed License Amendment Request to Adopt 10 CFR 50.69 ML19169A0962019-06-17017 June 2019 NRR E-mail Capture - Request for Additional Information Emergency Action Level Scheme Change for Millstone Power Station - Units 1, 2, and 3, North Anna Power Station - Units 1 and 2, and Surry Power Station - Units 1 and 2 ML19162A0052019-06-10010 June 2019 NRR E-mail Capture - Draft RAIs for Dominion EAL Scheme Change ML19042A1822019-02-11011 February 2019 Request for Additional Information LAR for TS Changes to Spent Fuel Storage and New Fuel Storage, 02/11/2019 E-mail from R. Guzman to S. Sinha ML18291B3262018-10-18018 October 2018 Request for Additional Information LAR Regarding Proposed Technical Specification Changes for Spent Fuel Pool Storage and New Fuel Storage, E-mail from R.Guzman to S.Sinha ML18277A1762018-10-0404 October 2018 Request for Additional Information LAR to Revise TS Action Statement for Loss of Control Building Inlet Ventilation Rad Monitor Instrumentation Channels (e-mail from R.Guzman to M.Whitlock, EPID: L-2018-LLA-0099) ML18213A1152018-08-0101 August 2018 Request for Additional Information Alternative Request P-06 'C' Charging Pump (08/01/2018 E-mail from R. Guzman to M. Whitlock) ML18171A1532018-06-20020 June 2018 Request for Additional Information Via E-mail from R.Guzman to W.Craft Alternative Requests for Inservice Testing Program (E-mail from R.Guzman to W.Craft) (EPID: L-2018-LLR-0012-LLR-0022) ML18137A3132018-05-17017 May 2018 Request for Additional Information Via E-mail from R.Guzman to W.Craft Proposed License Amendment Request to Revise ILRT Type a and Type C Test Intervals ML17297A8472017-10-27027 October 2017 Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools (CAC No. MF9430; EPID L-2016-LRC-0001) ML17033B6142017-02-0202 February 2017 Request for Additional Information, 2017/02/02 E-mail from R.Guzman to W.Craft Proposed Alternative RR-04-24 and IR-3-30 for the Elimination of Reactor Pressure Vessel Threads in Flange Examination (CAC Nos. MF8468/MF8469) ML17005A3282017-01-0505 January 2017 MPS2 EOC-23 and MPS3 EOC-17 Steam Generator Tube Inspection Reports - Requests for Additional Information ML16260A0062016-09-16016 September 2016 2016/09/16 E-mail from R. Guzman to W. Craft Request for Additional Information - License Amendment Request Realistic Large Break Loss of Coolant Accident Analysis (MF7761) ML16267A0022016-09-12012 September 2016 2016/09/12 E-mail from R.Guzman to W.Craft Request for Additional Information - LAR to Revise ECCS TS and FSAR Ch. 14 to Remove Charging (MF7297) ML16133A3562016-05-12012 May 2016 E-mail from R. Guzman to C. Sly Request for Additional Information Supporting License Amendment Request to Remove Charging Credit ML16068A4142016-03-0808 March 2016 Request for Additional Information - Relief Request RR-04-19 Examination Cat R-A, Risk-Informed Piping Examinations (MF6569) ML16055A5302016-02-24024 February 2016 2016/02/24 E-mail from R.Guzman to W.Craft Request for Additional Information - LAR to Adopt Dominion Core Design and Safety Analysis Methods (MF6251) ML16047A1712016-02-16016 February 2016 2016/02/16 E-mail from R.Guzman to M. Whitlock Request for Additional Information - Small Break Loss of Coolant Accident Re-Analysis (MF6700) ML16043A5232016-02-12012 February 2016 Request for Additional Information 2016/02/12 E-mail from R. Guzman to M.Whitlock Relief Requests IR-3-22 and IR-3-23 (CAC Nos. MF6573 and MF6574) ML16013A4772016-01-13013 January 2016 NRR E-mail Capture - Millstone Power Station, Units 2 and 3 - Request for Additional Information License Amendment Request for Removal of Severe Line Outage Detection (Slod) from the Offsite Power System - (MF6430, MF6431) ML16011A5172016-01-11011 January 2016 NRR E-mail Capture - Millstone Power Station, Unit 3, Reactor Vessel Surveillance Capsule Withdrawal Schedule - Request for Additional Information 2024-07-31
[Table view] |
Text
REQUEST FOR ADDITIONAL INFORMATION RELIEF REQUEST RR-04-12 TEMPROARY NON-CODE COMPLIANT CONDITION EMERGENCY DIESEL GENERATOR SUPPLY PIPING IN THE SERVICE WATER SYSTEM MILLSTONE POWER STATION, UNIT NO. 2 DOMINION NUCLEAR CONNECTICUT, INC DOCKET NO. 50-336 By letter dated August 19, 2011, Dominion Nuclear Connecticut, Inc. (DNC or the licensee) requested relief from certain Section XI requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (ASME Code) for Millstone Power Station, Unit No. 2 (MPS2). Relief Request RR-04-12 is based on the hardship of performing required ASME Code repair/replacement activities to a degraded piping flange in the A train 10-inch service water (SW) supply line to the emergency diesel generator heat exchangers. To complete its review, the U.S. Nuclear Regulatory Commission (NRC) staff requests the following additional information.
- 1. Provide the thickness of the flange (the face and hub), the wall thickness of the pipe, and operating temperature and pressure of the subject piping system.
- 2. Section 5.3. Provide the normal flow rate through the pipe at the flange location. Confirm that if the leak rate at the flange is 50 gpm, the service water supply to the associated diesel generator heat exchanger is still considered operable.
- 3. Section 5.5 discusses a flooding analysis based on a 2 gpm leak rate instead of 1 gpm leak rate. Discuss why 2 gpm is assumed instead of 1 gpm.
- 4. Section 5.6, Extent of Condition. (a) DNC states that [n]o other SW system flange leaks are present in the MPS2 SW system. What inspections were done to ensure no other leaks are present? When were these inspections done? Was the entire SW system at MPS2 inspected?
(b) Has the Millstone Power Station, Unit No. 3 (MPS 3) SW system been inspected for leaks?
(c) DNC states that the current condition is presumed to be damage to the coating system upon reinstallation into the system after inspection of the pressure boundary during a refueling outage. DNC also states that one train of SW is inspected each refueling outage. Therefore it appears to the NRC staff that other areas of the SW system are susceptible to this sort of degradation. Discuss whether the entire MPS2 and MPS3 SW system piping has been inspected to identify the potential for the subject degradation occurring in other parts of the service water piping system. If not, provide justification.
- 5. Section 5.7 states that Operations will qualitatively monitor leakage once per shift (A) Discuss in detail how the leakage will be monitored when the operator performs the walkdown every shift. Include the following information in your discussion:
(a) The degraded flange is located close to the ceiling in the room. How will the operator observe the leak rate from the floor of the room during the walkdown.
(b) Provide the required distance between the operator and the leaking flange location during the walkdown (i.e., the operator cannot exceed this required distance to observe the leakage).
(B) Confirm that 1 shift is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
(C) Discuss if there will be a leakage catcher/container situated at the vicinity of the flange to catch the leaking fluid.
(D) Discuss whether the affected flange area will be without insulation until the flange is repaired.
(E) Section 5.3 of the relief request states that the current leak rate is approximately 10 drops/minute. Discuss whether the operator can observe 10 drops/min during his walkdown of the subject pipe.
(F) Discuss whether the leak rate will be recorded after each walkdown to observe any adverse trend. How will consistency in leak rate observations be ensured between shifts?
(G) Describe in detail how the 1 gpm leak rate will be determined at the degraded location, when and if the leak rate reaches 1 gpm.
(H) Discuss how many hours before a 1 gpm leak rate can be determined once the leak rate increases.
(I) How is DNC going to correlate the leak rate to the level of degradation of the flaw?
(J) Describe why the weekly trending, given the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement, and qualitative analysis is adequate.
(K) Are administrative controls in place at certain leakage rates below the 1 gpm? What are these controls and at what leak rates are they administered?
- 6. Section 5.7 states that if the flaw size reaches 33% of the original flange inside circumference, the A Train SW system will be declared inoperable. (a) Provide the flange inside circumference measurement. (b) For this flaw, what is its depth limitation if the length is limited to 33% of the flange inside circumference? (c) The pipe at the flange location may be DRAFT
susceptible to the same corrosion, therefore should a limit also be applied to the reduction of wall thickness of the pipe close to the flange.
- 7. Section 5.7 discusses two limits beyond which the A train SW system will be declared inoperable: a leak rate of 1 gpm and flaw size of 33% of the flange inside circumference. (a)
Discuss if there are any other limits being applied. The NRC staff has concerns regarding the flange thickness and believes that a limitation on the flange thickness beyond which the SW system should be declared inoperable would be prudent. Please provide such a limitation and how it will be monitored or discuss why it is not necessary (b) Confirm that when either the 1 gpm limit or the flaw size limit is reached the affected piping system is declared inoperable. (c)
If the pipe at the flange location develops a leak rate of 1 gpm, will the A train SW system will also be declared inoperable. If not, why not?
- 8. For the compensatory UT inspection, discuss exactly the areas of the flange and pipe that will be examined, the transducer that will be used, and what will be recorded.
- 9. If MPS2 enters MODE 5 prior to the next refueling outage, currently scheduled to start October 2012, will the flange be replaced at this earlier time?
- 10. Once in Mode 5, how long will it take to complete the work activities for the flange replacement? Can the affected flange be isolated from the SW system to perform these repairs? If isolation is possible, why not isolate and replace the flange?
DRAFT