RAIs for Salem U1 Relief Request S1-I3R-114 TAC No. ME8565
ML122630012
Person / Time
Site: Salem PSEG icon.png
Issue date: 09/18/2012
From: John Hughey
Plant Licensing Branch 1
To: Bernard Thomas
Public Service Enterprise Group
John Hughey - 415-3204
Shared Package
ml12263A120 List:
References
TAC ME8565
Download: ML122630012 (1)


Text

From: Hughey, John Sent: Tuesday, September 18, 2012 3:38 PM To: 'Thomas, Brian J.'

Cc: 'Duke, Paul R.'; Khanna, Meena

Subject:

RAIs For Salem U1 Relief Request S1-I3R-114 TAC No. ME8565 Attachments: S1-I3R-114 RAIs.docx

Brian, By letter dated April 24, 2012 (Acencywide Document Access and Management System No.

ML12125A152), the licensee, PSEG Nuclear LLC (PSEG), submitted Request for Relief (RR)

S1-I3R-114 from the requirements of the American Society of Mechanical Engineers (ASME)

Boiler and Pressure Vessel Code,Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components for Salem Generating Station, Unit 1 (Salem 1). The request for relief applies to the third 10-year inservice inspection interval (ISI), in which the licensee adopted the 1998 Edition through the 2000 Addenda of ASME Code Section XI as the code of record.

The NRC staff has reviewed the information submitted by PSEG, and based on this review, determined additional information is required to complete the evaluation. Please find attached a Request For Additional Information. Please respond to me by Friday, September 21, 2012, and advise if you desire to hold a teleconference to discuss the questions. The NRC staff requests a response to the attached RAI by October 19, 2012.

Thank you, John John Hughey Salem & Hope Creek Project Manager NRR / Division of Operating Reactor Licensing Phone: 301-415-3204 e-mail: John.Hughey@nrc.gov