Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195J718 + (Proposed Tech Specs 3.7.6, SWS, Adding One SWS Heat Exchanger Inoperable as New Condition for LCO 3.7.6)
- ML20211E998 + (Proposed Tech Specs 3.7.6,separating Requirements for CR HVAC Sys Re Operation of CR Emergency Makeup Air & Filtration Sys Subsystem & CR Air Conditioning Subsystem)
- ML20249C832 + (Proposed Tech Specs 3.7.6.1,3.7.6.2,3.7.6.3,3.7.6.4 & 3.7.6.5,revising Control Room Ventilation to Be Consistent w/NUREG-1432)
- ML20078G129 + (Proposed Tech Specs 3.7.7,3.8.1.2,3.8.2.2,3.8.2.3 & 3.9.12, Changing Diesel Generators Required to Be Operable During Mode 5 W/Loops Filled)
- ML20080H595 + (Proposed Tech Specs 3.7.8,Table 4.7-2 Re Snubber Insp Intervals,Per GL 90-09)
- ML20212A908 + (Proposed Tech Specs 3.7.9 Re Fuel Storage Pool Makeup Water Sources)
- JPN-93-046, Proposed Tech Specs 3.7.A,changing Torus Vent Submergence Levels & Insp Intervals + (Proposed Tech Specs 3.7.A,changing Torus Vent Submergence Levels & Insp Intervals)
- ML20031C573 + (Proposed Tech Specs 3.7.a & 4.7.A for Primary Containment)
- ML20050E435 + (Proposed Tech Specs 3.76 Re Control Room Emergency Ventilation Sys)
- ML20003G227 + (Proposed Tech Specs 3.8 & 4.8 Reflecting Operability of Auxiliary Steam Generator Feedwater Sys)
- ML20066D630 + (Proposed Tech Specs 3.8 Revising Basis to Clarify Emergency Diesel Generator Trips to Avoid Misinterpretation of Spec)
- ML19312B816 + (Proposed Tech Specs 3.8,4.4 & 4.6 Re Fuel Loading & Refueling,Structural Integrity & Emergency Power Periodic Testing)
- ML20207A391 + (Proposed Tech Specs 3.8,clarifying Bases for SRs 3.8.1.7, 3.8.1.12 & 3.8.1.15)
- ML19338C272 + (Proposed Tech Specs 3.8-1,3.8-2 & 3.8-3 Eliminating Requirements for Two balance-of-plant Diesel Generators)
- ML20210P418 + (Proposed Tech Specs 3.8.1 & 3.8.5,documenting Changes Agreed Upon W/Nrc Re Electrical Power Sys)
- ML20153D879 + (Proposed Tech Specs 3.8.1 & 3.8.7 Re Balance of Plant/ Emergency Bus Allowable Outage Time Extension)
- ML20031F252 + (Proposed Tech Specs 3.8.1 & 4.8.1 Re Sources Electrical Power Sys Limiting Condition for Operation.Safety Evaluation Encl)
- ML20129J423 + (Proposed Tech Specs 3.8.1 Re A.C. Sources - Operating)
- ML20117N585 + (Proposed Tech Specs 3.8.1 Re AC Electrical Sources)
- ML20134M015 + (Proposed Tech Specs 3.8.1 Re AC Sources Operating)
- ML20198H760 + (Proposed Tech Specs 3.8.1 Re Extension of EDG Completion Time)
- ML20137V250 + (Proposed Tech Specs 3.8.1, AC Sources - Operating, Revising SR 3.8.1.8 & Applicable Bases Allowing Credit Overlap Testing)
- ML20070D310 + (Proposed Tech Specs 3.8.1.1 & 3.8.1.2 Re Min Storage Vols for Fuel Oil Storage Tanks)
- ML20134M659 + (Proposed Tech Specs 3.8.1.1 & 3.8.1.2,increasing Min Useable Fuel Required for Diesel Generators 11 & 12 from 48,000 to 57,200 Gallons & Changing Standby Svc Water Sys)
- ML20086Q836 + (Proposed Tech Specs 3.8.1.1 & Associated Bases,Extending EDG Allowed Outage Time from 72 H to Seven Days,W/Addl once-per- Refueling Cycle 10 Day AOT for Maint Purposes)
- ML20140C064 + (Proposed Tech Specs 3.8.1.1 Re AC Sources - Operating)
- ML20210H177 + (Proposed Tech Specs 3.8.1.1 Re EDG AOT Increase from 72 H to Ten Days)
- ML20111A694 + (Proposed Tech Specs 3.8.1.1 Re Electrical Power Sys,Ac Sources)
- ML20134F008 + (Proposed Tech Specs 3.8.1.1 Re Electrical Power Systems)
- ML20084V235 + (Proposed Tech Specs 3.8.1.1, Electric Power Sys,Ac Sources, Operating, 3.8.1.2, Electrical Power Sys,Shutdown 3.8.2.2, Electrical Power Sys,Ac Distribution - Shutdown)
- ML17355A392 + (Proposed Tech Specs 3.8.1.1,3.4.3 & 3.5.2,extending AOT for Inoperable EDG from 72 Hours to 7 Days on one-time Basis)
- ML20079J202 + (Proposed Tech Specs 3.8.1.1,Action H,4.8.1.1.2.g & 4.8.1.1.4)
- ML20082K603 + (Proposed Tech Specs 3.8.1.1,Actions b.3,c.3 & e.3,allowing one-time Extension of Allowed out-of-svc Times for DGs 3 & 4 from 7 Days to 14 Days)
- ML18010A372 + (Proposed Tech Specs 3.8.1.1.b.1 & 3.8.1.2.b.1 Re Emergency Diesel Generator Day Tank Level)
- ML20100R122 + (Proposed Tech Specs 3.8.1.1.b.2 & b.3,3.8.1.2.b.2 & b.3, 3.8.1.1 Action (I) & 3.8.1.2 Action (C) Re Rev of Diesel Fuel Oil Storage & Transfer Requirements)
- ML20133G910 + (Proposed Tech Specs 3.8.1.14 & 3.8.1.15, AC Sources - Operating, Surveillance Requirements)
- ML20128M568 + (Proposed Tech Specs 3.8.1.14 Re Surveillance Requirements)
- ML20093L791 + (Proposed Tech Specs 3.8.1.2, Electrical Power Sys, Shutdown, 3.8.2.2, Electrical Power Sys,Ac Distribution - Shutdown & 3.8.2.4, Electrical Power Sys,Dc Distribution - Shutdown)
- ML20210K892 + (Proposed Tech Specs 3.8.1.3,requesting one-time Outage on Each EDG to Perform Necessary Mod & Maint)
- ML20134M154 + (Proposed Tech Specs 3.8.2 Allowing Use of Low Specific Gravity Cells in Vital 125 Volt Dc Sys When Desired)
- ML20135B038 + (Proposed Tech Specs 3.8.2 Re DC Sources)
- ML20078Q293 + (Proposed Tech Specs 3.8.2, AC Sources-Shutdown, 3.8.5, DC Sources-Shutdown & 3.8.8, Inverters-Shutdown)
- ML20046B593 + (Proposed Tech Specs 3.8.2,3.8.5,3.8.8 & 3.8.10 & Associated Bases Re Electrical Power Sys)
- ML20078F613 + (Proposed Tech Specs 3.8.2.1 & 3.8.2.2,requiring Only One of Two Battery Chargers Associated W/Each Class 1E 125 Volt Dc Channel I & IV to Be Operable)
- ML20080K186 + (Proposed Tech Specs 3.8.2.1 & 3.8.3.1 Supporting 125 Vdc Vital Instrumentation & Control Power Sys Circuit Breakers Replacement)
- ML18010A670 + (Proposed Tech Specs 3.8.2.1,3.8.2.2,3.8.3.1 & 3.8.3.2 Re Dc Electrical Power Sys Battery Chargers)
- ML20077D258 + (Proposed Tech Specs 3.8.2.2 & 3.8.2.4 Re Containment Integrity in Modes 5 & 6)
- ML20083C096 + (Proposed Tech Specs 3.8.2.3 & 4.8.2.3.1 Re Electrical Power Sys,Dc Distribution - Operating.Justification & Significant Hazards Consideration Determination Encl)
- ML20053E885 + (Proposed Tech Specs 3.8.2.3,3/4.8.1 & B 3/4 8-2 Re Limiting Conditions & Surveillance Requirements for Station Batteries)
- ML20087A005 + (Proposed Tech Specs 3.8.3.1 Re Electrical Distribution Sys & 3.8.2.1 Re Battery Chargers)
- ML19331C941 + (Proposed Tech Specs 3.8.7 & 4.8.7 Re Svc Water Sys Limiting Condition for Operation & Surveillance Requirement)