ML20111A694

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs 3.8.1.1 Re Electrical Power Sys,Ac Sources
ML20111A694
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/03/1996
From:
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20111A692 List:
References
NUDOCS 9605130452
Download: ML20111A694 (4)


Text

_

=

l*

Docket No. 50-336 l

B15697 l

Millstone Nuclear Power Station, Unit No. 2 Proposed Revision to Technical Specifications Electrical Power Systems - Shutdown Marked-up Pages l

May 1996 9605130452 960503 PDR ADOCK 05000336 p

PDR

i,*.

i 4

August 1.1975 i

ELECTRICAL POWER SYSTEMS

\\

sNimoWN.

LIMITING CONDITION FOR OPERAT!DN i

i t

3.8.1.2 As a minima, the following A.C. electrical power sources shall be OPERABLE:

i i

a.

One circuit between the offsite transmission network and the l

switchyard, and f.

b.

One diesel generator with a fuel oil supply tank containing a 1

minimum of 12.000 gallons of fuel.

i APPLICABILITY: MODES 5 and 6.

i l

ACTION:

}

With less than the above minimum required A.C. electrical power sources OPERABLE. suspend all operations involving CORE ALTERATIONS or positive 1

r:-

I reactivi ty changes-x'.' n'e.t.. I'

'. c..,....:.".. - :^ '::

g L4 raanie *-.-

u, SURVE!LLANCE REOUIREMENTS 4.8.1.2 The above required A.C. electrical oower sources shall be 0% per 3 gsnce a WomentM ".1.1.' f rat j

m u w c ~, w,.> <

es.. a,.

s- -

l y4...i.i.z;.2 y..,_ > #

l 4

.u.i.2...

9 i

4 I

j MILLSTONE - UNIT 2 3/4 8-5

)

6 '# M i

Docket No. 50-336 B15697 1

l 4

Millstone Nuclear Power Station, Unit No. 2 Proposed Revision to Technical Specifications Electrical Power Systems - Shutdown Retyped Pages May 1996

i ELECTRICAL POWER SYSTENS SHUTDOWN LINITING COMITION FOR OPERATION f

3.8.1.2 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a.

One circuit between the offsite transmission network and the switchyard, and i

b.

One diesel generator with a fuel oil supply tank containing a j

minimum of 12,000 gallons of fuel.

APPLICABILITY: MODES 5 and 6.

i ACTION:

With less than the above minimum required A.C. electrical power sources OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes or movement of irradiated fuel assemblies.

l SURVEILLANCE REQUIRENENTS i

4.8.1.2 The above required A.C. electrical power sources shall be demonstrated OPERABLE per Surveillance Requirements 4.8.1.1.1 and 4.3.1.1.?, except for testing pursuant to Surveillance Requirements 4.8.1.1.2.a.3, 4.8.1.1.2.c.2, and 4.8.1.1.2.c.5.

l i

4 NILLSTONE - UNIT 2 3/4 8-5 Amendment No.

01 M J