MONTHYEARML20212G1611999-09-22022 September 1999 Proposed Tech Specs,Requesting one-time Extension of Unit 2 Surveillance Interval for Snubber Functional Testing ML20212F6611999-09-20020 September 1999 Proposed Tech Specs,Revising Surveillance Std to Which Ventilation Charcoal Must Be Laboratory Tested as Recommended by GL 99-02 ML20210B8981999-07-15015 July 1999 Final Typed Pages for LARs 109 & 115,previously Submitted by 990615 & 28 Ltrs.Revised Pages Replace Those Previously Provided for LARs 109 & 115 ML20210B8771999-07-15015 July 1999 Final,Typed TS (Pages for LARs 262 & 135,previously Submitted with Editorial Changes Identified by ML20210B8401999-07-15015 July 1999 Proposed Tech Specs Revising Surveillance Frequency for Quench & Recirculation Spray Systems Nozzle Air Flow Test from 5 Years to 10 Years,Per Guidance Provided in GL 93-05 ML20209C1941999-06-28028 June 1999 Typed,Final TS Pages for LAR 115.Summary Description of Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages ML20196G3871999-06-22022 June 1999 Proposed Final Tech Spec Pages for LARs 259 & 131 ML20196F6881999-06-17017 June 1999 Proposed Tech Specs Updating Heatup,Cooldown & Overpressure Protection Curves & Bases to Apply for Up to 15 EFPYs ML20196F0191999-06-17017 June 1999 Proposed Tech Specs Pages for LARs 262 & 135 ML20195K1821999-06-15015 June 1999 Proposed Tech Specs Pages for LAR 109 Re RCS ML20207E1851999-05-27027 May 1999 Proposed Tech Specs,Revising Frequency Notation for Manual Functions Specified in ESFAS to More Clearly Denote Appropriate Refueling Frequency for Testing ML20207E2331999-05-27027 May 1999 Proposed Tech Specs 3/4.3.3.3,relocating Seismic Instrumentation Requirements to Licensing Requirements Manual Based on Guidance Provided in GL 95-10 ML20207E2081999-05-27027 May 1999 Proposed Revised Tech Specs for LARs 259 & 131,revising Qualifications for Operations Mgt & Incorporating Generic Position Titles ML20205H5121999-03-31031 March 1999 Proposed Tech Specs Changes to Index Page Xvii,Changing Wording of Title for Table 3.7-1.Table 3.7-2 Will Be Changed to Be Consistent with Title of Table 3.7-3 ML20204E3851999-03-16016 March 1999 Proposed Tech Specs LCO 3.7.1.3,increasing Min Vol in Primary Plant DW to 127,500 Gallons,Adding New Footnote & Revising Wording Contained Action Statements ML20204E4381999-03-16016 March 1999 Proposed Tech Specs Bases Section 3/4.7.13,adding Wording Which Discusses Design Bases of Sys in Greater Depth ML20207K1331999-03-0303 March 1999 Proposed Tech Specs Changing Qualifications for Operations Mgt & Incorporating Generic Titles to Eliminate Need to Develop Amend Request When Corresponding plant-specific Titles Are Changed ML20207E6261999-02-26026 February 1999 Proposed Typed,Final Tech Specs Pages for LAR 111 ML20199G5431999-01-18018 January 1999 Proposed Tech Specs Re Limiting Safety Sys Settings 2.2.1 & Associated Table 2.2-1 ML20206N9541998-12-24024 December 1998 Proposed Tech Specs,Modifying Applicable Sections by Removing Rod Position Deviation Monitor,Rod Insertion Limit Monitor,Afd Monitor & QPTR Monitor ML20198F9661998-12-24024 December 1998 Proposed Tech Specs Section 3/4.8.1, AC Sources, Clarifying EDG Fuel Oil Storage Requirements by Addition of Term Usable & Increasing EDG Largest Single Load Rejection Test Requirements ML20198D6711998-12-14014 December 1998 Proposed Typed,Final Tech Specs Pages for LARs 246 & 116, Consisting of Editorial Changes Due to Pagination,Changes Incorporated by Previous Amends & Corrected Typos ML20155J0161998-11-0303 November 1998 Proposed Tech Specs Page 3/4 1-15,re Reactivity Control Sys ML20155B9681998-10-23023 October 1998 Proposed Final,Typed Tech Specs Bases Pages for LARs 260 & 133 Re Limiting Safety Sys Settings ML20154Q8021998-10-15015 October 1998 Proposed Tech Specs,Deleting Two License Requirements, Modifying One LCO Applicability,Modifying Three Definitions, Changing Action Statement Number & Deleting Meteorological Monitoring Spec ML20154Q4341998-10-15015 October 1998 Proposed Tech Specs,Adding Discussion That Explains Why Use of Time Constants,Expressed as Equality,Such as T = X Seconds,Are Acceptable ML20154D6381998-09-30030 September 1998 Proposed Tech Specs Re Revised Typed Bases for LAR 235 ML20154C6501998-09-24024 September 1998 Proposed Tech Specs Section 3.1.2.8,eliminating Potential for non-conservative Interpretation of Values of RWST & Bat Min Contained Volume & Eliminating Need for Plant Administrative Controls ML20197C5711998-09-0808 September 1998 Proposed Typed,Final TS Pages Re Surveillance Requirements for LAR 235 ML20236S4921998-07-15015 July 1998 Proposed Tech Specs 3/4 3 Re Reactor Trip Sys & ESF Sys Instrumentation ML20236S2881998-07-13013 July 1998 Proposed Tech Specs Revising BVPS-1 UFSAR Pages 9.7-7 & 8 & BVPS-2 UFSAR Pages 3.6-11 & 12 Re Potential Flooding of Intake Structure Pump Cubicles ML20236P7761998-07-0909 July 1998 Proposed Tech Specs 3/4 3-2,3/4 3-11 & B 3/4 3-1b,modifying Source Range Neutron Flux Requirements to Allow Use of Alternate Detectors ML20236P8051998-07-0909 July 1998 Proposed Tech Specs Revising TS 3.7.1.1, Svs, Incorporating Improved STS Guidance of NUREG-1431 & Recommendations of W Nuclear Safety Advisory 94-01,dtd 940120 ML20249C4531998-06-23023 June 1998 Final Tech Specs Pages for LARs 256/126 ML20249C3161998-06-19019 June 1998 Proposed Tech Specs Modifying Channel Calibr Definition to Exclude RTDs & Thermocouples from TS Channel Calibr Requirements ML20247L3071998-05-14014 May 1998 Proposed Tech Specs,Final Pages for License Amend Requests 249/118 & 254/123,as Amends A-249,A-118,A-254 & A-123, Respectively ML20216G7011998-03-17017 March 1998 Proposed Tech Specs,Revising Engineered Safety Feature Actuation Sys Instrumentation Table 3.3-3,action 34 & Associated Bases Section ML20216G0801998-03-16016 March 1998 Proposed Tech Specs,Exempting Neutron Flux Detectors from Channel Calibr Requirements ML20216G1011998-03-16016 March 1998 Proposed Tech Specs Adding New LCO 3.0.6 to Section 3/4.0, Applicability ML20199J4391998-01-29029 January 1998 Proposed Tech Specs Re Radiological Doses for Locked Rotor Accident ML20198D4081997-12-19019 December 1997 Proposed Tech Specs,Modifying Neutron Flux Requirements to Allow Use of Alternate Detectors ML20198P6571997-11-0404 November 1997 Proposed Tech Specs Table 3.3-4 Re Emergency Bus Undervoltage Trip Setpoint,Allowable Valve & Time Delay for DG Start ML20212C8881997-10-22022 October 1997 Proposed Tech Specs 3.4.8,reducing RCS Specific Activity Limits Per GL 95-05 ML20217A9801997-09-11011 September 1997 Proposed Tech Specs Implementing line-item Improvements Provided in GL 93-08 for Removal of Response Times from TS ML20210L4381997-08-13013 August 1997 Proposed Tech Specs Revised Typed Pages for TS Change Requests 213 & 80,requiring Addl Revs from Pages Submitted in ML20141K5371997-05-23023 May 1997 Proposed Tech Specs Re Typed Paged for Change Request 213 & 80 ML20137C9111997-03-14014 March 1997 Proposed Tech Specs Re Administrative Controls Related to QA ML20147E6511997-03-10010 March 1997 Proposed Tech Specs Modifying Specification 3.4.5 to Allow SG Tube Sleeving Using Framatome Process ML20136G2091997-03-10010 March 1997 Proposed Tech Specs,Modifying Spec 3.4.5 to Allow SG Tube Sleeving Using CE Process ML20147E6301997-03-10010 March 1997 Proposed Tech Specs Modifying Unit 1 Design Feature Section 5.2.1 to Add ZIRLO as Fuel Assembly Matls & Adds Ref to NRC Approved WCAP-12610 to Administrative Control 6.9.1.12 for Both Units 1999-09-22
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212G1611999-09-22022 September 1999 Proposed Tech Specs,Requesting one-time Extension of Unit 2 Surveillance Interval for Snubber Functional Testing ML20212F6611999-09-20020 September 1999 Proposed Tech Specs,Revising Surveillance Std to Which Ventilation Charcoal Must Be Laboratory Tested as Recommended by GL 99-02 ML20210B8771999-07-15015 July 1999 Final,Typed TS (Pages for LARs 262 & 135,previously Submitted with Editorial Changes Identified by ML20210B8981999-07-15015 July 1999 Final Typed Pages for LARs 109 & 115,previously Submitted by 990615 & 28 Ltrs.Revised Pages Replace Those Previously Provided for LARs 109 & 115 ML20210B8401999-07-15015 July 1999 Proposed Tech Specs Revising Surveillance Frequency for Quench & Recirculation Spray Systems Nozzle Air Flow Test from 5 Years to 10 Years,Per Guidance Provided in GL 93-05 ML20209C1941999-06-28028 June 1999 Typed,Final TS Pages for LAR 115.Summary Description of Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages ML20196G3871999-06-22022 June 1999 Proposed Final Tech Spec Pages for LARs 259 & 131 ML20196F0191999-06-17017 June 1999 Proposed Tech Specs Pages for LARs 262 & 135 ML20196F6881999-06-17017 June 1999 Proposed Tech Specs Updating Heatup,Cooldown & Overpressure Protection Curves & Bases to Apply for Up to 15 EFPYs ML20195K1821999-06-15015 June 1999 Proposed Tech Specs Pages for LAR 109 Re RCS ML20207E1851999-05-27027 May 1999 Proposed Tech Specs,Revising Frequency Notation for Manual Functions Specified in ESFAS to More Clearly Denote Appropriate Refueling Frequency for Testing ML20207E2331999-05-27027 May 1999 Proposed Tech Specs 3/4.3.3.3,relocating Seismic Instrumentation Requirements to Licensing Requirements Manual Based on Guidance Provided in GL 95-10 ML20207E2081999-05-27027 May 1999 Proposed Revised Tech Specs for LARs 259 & 131,revising Qualifications for Operations Mgt & Incorporating Generic Position Titles ML20205H5121999-03-31031 March 1999 Proposed Tech Specs Changes to Index Page Xvii,Changing Wording of Title for Table 3.7-1.Table 3.7-2 Will Be Changed to Be Consistent with Title of Table 3.7-3 ML20211N6651999-03-25025 March 1999 Issue 3,rev 3 to Bvps,Unit 1 Inservice Testing (IST) Program for Pumps & Valves ML20204E4381999-03-16016 March 1999 Proposed Tech Specs Bases Section 3/4.7.13,adding Wording Which Discusses Design Bases of Sys in Greater Depth ML20204E3851999-03-16016 March 1999 Proposed Tech Specs LCO 3.7.1.3,increasing Min Vol in Primary Plant DW to 127,500 Gallons,Adding New Footnote & Revising Wording Contained Action Statements ML20207K1331999-03-0303 March 1999 Proposed Tech Specs Changing Qualifications for Operations Mgt & Incorporating Generic Titles to Eliminate Need to Develop Amend Request When Corresponding plant-specific Titles Are Changed ML20207E6261999-02-26026 February 1999 Proposed Typed,Final Tech Specs Pages for LAR 111 ML20199G5431999-01-18018 January 1999 Proposed Tech Specs Re Limiting Safety Sys Settings 2.2.1 & Associated Table 2.2-1 ML20198F9661998-12-24024 December 1998 Proposed Tech Specs Section 3/4.8.1, AC Sources, Clarifying EDG Fuel Oil Storage Requirements by Addition of Term Usable & Increasing EDG Largest Single Load Rejection Test Requirements ML20206N9541998-12-24024 December 1998 Proposed Tech Specs,Modifying Applicable Sections by Removing Rod Position Deviation Monitor,Rod Insertion Limit Monitor,Afd Monitor & QPTR Monitor ML20198D6711998-12-14014 December 1998 Proposed Typed,Final Tech Specs Pages for LARs 246 & 116, Consisting of Editorial Changes Due to Pagination,Changes Incorporated by Previous Amends & Corrected Typos ML20205F6961998-11-30030 November 1998 Revs to Offsite Dose Calculation Manual ML20211K6871998-11-30030 November 1998 Issue 2,Rev 1 to Inservice Testing (IST) Program for Pumps & Valves ML20155J0161998-11-0303 November 1998 Proposed Tech Specs Page 3/4 1-15,re Reactivity Control Sys ML20155B9681998-10-23023 October 1998 Proposed Final,Typed Tech Specs Bases Pages for LARs 260 & 133 Re Limiting Safety Sys Settings ML20154Q8021998-10-15015 October 1998 Proposed Tech Specs,Deleting Two License Requirements, Modifying One LCO Applicability,Modifying Three Definitions, Changing Action Statement Number & Deleting Meteorological Monitoring Spec ML20154Q4341998-10-15015 October 1998 Proposed Tech Specs,Adding Discussion That Explains Why Use of Time Constants,Expressed as Equality,Such as T = X Seconds,Are Acceptable ML20154D6381998-09-30030 September 1998 Proposed Tech Specs Re Revised Typed Bases for LAR 235 ML20154C6501998-09-24024 September 1998 Proposed Tech Specs Section 3.1.2.8,eliminating Potential for non-conservative Interpretation of Values of RWST & Bat Min Contained Volume & Eliminating Need for Plant Administrative Controls ML20197C5711998-09-0808 September 1998 Proposed Typed,Final TS Pages Re Surveillance Requirements for LAR 235 ML20154D5241998-08-14014 August 1998 Issue 2,Rev 0C to Inservice Testing (IST) Program for Pumps & Valves ML20202G9831998-07-22022 July 1998 Issue 3,rev 2 to BVPS Unit 1 IST Program for Pumps & Valves ML20236S4921998-07-15015 July 1998 Proposed Tech Specs 3/4 3 Re Reactor Trip Sys & ESF Sys Instrumentation ML20236S2881998-07-13013 July 1998 Proposed Tech Specs Revising BVPS-1 UFSAR Pages 9.7-7 & 8 & BVPS-2 UFSAR Pages 3.6-11 & 12 Re Potential Flooding of Intake Structure Pump Cubicles ML20236P8051998-07-0909 July 1998 Proposed Tech Specs Revising TS 3.7.1.1, Svs, Incorporating Improved STS Guidance of NUREG-1431 & Recommendations of W Nuclear Safety Advisory 94-01,dtd 940120 ML20236P7761998-07-0909 July 1998 Proposed Tech Specs 3/4 3-2,3/4 3-11 & B 3/4 3-1b,modifying Source Range Neutron Flux Requirements to Allow Use of Alternate Detectors ML20249C4531998-06-23023 June 1998 Final Tech Specs Pages for LARs 256/126 ML20249C3161998-06-19019 June 1998 Proposed Tech Specs Modifying Channel Calibr Definition to Exclude RTDs & Thermocouples from TS Channel Calibr Requirements ML20248M1901998-05-19019 May 1998 Proposed Rev 2F to Bvps,Unit 2 Inservice Testing (IST) Program for Pumps & Valves ML20247L3071998-05-14014 May 1998 Proposed Tech Specs,Final Pages for License Amend Requests 249/118 & 254/123,as Amends A-249,A-118,A-254 & A-123, Respectively ML20247J2851998-04-20020 April 1998 Alternative Request BV1-RV-AUG-1,Rev 1 for Reactor Vessel Lower Circumferential Weld (RC-R-1-C-8) ML20247J6761998-04-20020 April 1998 Alternative Request BV2-RV-AUG-1,Rev 1 for Reactor Vessel Lower Circumferential Weld (2RCS-REV21-C-4) ML20216J9771998-04-13013 April 1998 BVPS Unit 1,Cycle 13 Startup Physics Test Rept ML20248K3061998-03-20020 March 1998 Rev 1,Issue 3 to Inservice Testing Program for Pumps & Valves ML20237B9721998-03-19019 March 1998 Rev 1 to Procedure Npdap 2.14, Fitness-For-Duty for Duquesne Light Employees ML20216G7011998-03-17017 March 1998 Proposed Tech Specs,Revising Engineered Safety Feature Actuation Sys Instrumentation Table 3.3-3,action 34 & Associated Bases Section ML20216G1011998-03-16016 March 1998 Proposed Tech Specs Adding New LCO 3.0.6 to Section 3/4.0, Applicability ML20216G0801998-03-16016 March 1998 Proposed Tech Specs,Exempting Neutron Flux Detectors from Channel Calibr Requirements 1999-09-22
[Table view] |
Text
,- ELECTRICAL POWER SYSTEMS D.C. DISTRIBUTION - OPERATING m
LIMITING CONDITION FOR OP RATION 3.8.2.3 The following D.C. bus traica shall be energized and OPERABLE:
TRAIN "A" (orange) consisting of 125-volt D.C. busses No. 1-1 & 1-3, 125-volt D.C. battery banks 1-1 & 1-3 & chargers 1-1 & 1-3.
TRAIN "B" (purple) consisting of 125-volt D.C. busses No. 1-2 & 1-4, 125-volt D.C. battery banks 1-2 & 1-4 and chargers 1-2 & 1-4 APPLICABILITY: MODES 1, 2, 3 and 4.
ACTIONt
- a. With one of the required battery banks inoperable, restore the inoperable battery bank to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- b. With one of the required full capacity chargers inoperable, demon-strate the OPERABILITY of its associated battery bank by performing Surveillance Requirement 4.8.2.3.2.a.1 within one hour, and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If any Category A limit in Table 3.8-1 is not met, declare the battery inoperable.
SUR'iEILLANCE REQUIREMENTS 4.8.2.3.1 Each D.C. bus train shall be determined OPERABLE and energized at least once per 7 days by verifying correct breaker alignment and indi-cated power availability.
4.8.2.3.2 Each 125-volt battery bank and charger shall be demonstrated OPERAELE:
- a. At least once per 7 days by verifying that:
- 1. The parameters in Table 3.8-1 meet the Category A limits, and
- 2. The total battery terminal voltage is greater than or equal to 127.8 - volts on float charge.
BEAVER V ALLEY- U NIT 1 3/4 8-8 P206100174 820603 PDR ADOCK 05000334 P PDR Proposed Nording
]
- ELECTRICAL POWER SYSTEMS SURVEILLANCE REOUIREMENTS (Continued)
- b. At least once per 92 days and within 7 days after a battery discharge with battery terminal voltage below 110 -volts, or battery overcharge with battery terminal voltage above 150 -volts, by verifying that:
- 1. The parameters in Table 3.8-1 meet the Category B limits,
- 2. The average electrolyte temperature of every tenth cell of connected cells is above (60 F).
- c. At least once per 18 months by verifying that:
- 1. The cells, cell plates, and battery racks show no visual indication of physical damage or abnormal deterioration, 4
- 2. The cell-to-cell and terminal connections are clean, tight, and coated with anti-corrosion material.
- 3. The resistance of each cell-to gell and terminal connection is less than or equal to 150 x 10 ohms; and
- 4. The battery charger will supply at least (100) amperes at 140 -volts for at least (4) hours.
- d. At least once per 18 months, during shutdown, by verifying that the battery capacity is adequate to supply and maintain in OPERABLE status all of the actual or simulated emergency loads for the 2-hour design duty cycle when the battery is subjected to a battery service test.
l e. At least once per 60 months, during shutdown, by verifying that the l battery capacity is at least 80% of the manufacturer's rating when subjected to a performance discharge test. Once per 60 month interval, this performance discharge test may be performed in lieu of the l battery service test.
l f. At each refueling outage with the station shutdown, performance dis-l charge tests of battery capacity shall be given to any battery that shows signs of degradation. Degradation is indicated when the battery capacity drops more than 10% of rated capacity from its average on
. previous performance tests.
I BEAVER VALLEY - UNIT 1 3/4 8-9 Proposed Wording
.~ .
TABLE 3.8- 1 }
BATTERY SURVEILLAt1CE RE0VIREME?iTS 1
CATEGORY A(1) CATEGORY B(2) k Parameter Limits for each Limits for each A11cwable(3) designated pilot connected cell value for each cell connected call i
Electrolyte > Minimum level > Minimum level Above top of l Level indication mark, indication mark, plates, l and < h" above and < h" above and not l maxiEum level maxi 5um level overflowing l indication mark indication mark r l
Float Voltage > 2.13 volts > 2.13 volts (c)
> 2.07 volts ,
l Not more than !
I
.020 below the average of all I
> 1.195 connected cells Specifi > 1.200(b) f Gravity {a)
Average of all Average of all i; connected cells connect i
> 1.205 >1.195g) cells t
4 (a) Corrected for electrolyte temperature and level. !
(b) Or battery charging current is less than (2) amps when on charge. l (c) Corrected for average electrolyte temperature. [-
(1) For any Category A parameter (s) outside the limit (s) shown, the battery
-l may be considered OPERABLE provided that within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> all the Category B measurements are taken and found to be within their allowable values, and provided all Category A and B parameter (s) are restored 'to within limits f within the next 6 days. l (2) For any Category B parameter (s) outside the limit (s) shown, the battery l may be considered OPERABLE provided that the Category B parameters are j within their allcwable values and provided the Category 8 parameter (s) are "
restored to within limits within 7 days.
(3) Any Category B parameter not within its allowable value indicates an inoperable battery. ;
ihumbers in paretheses assume a manufacturer's recc. . ended full chargel
{specificgravityof1.215. l 3/4 S-9a BEAVER VALLEY - L'n~' 1 Proposed '4ording
3/6.8 ELECTRICAL POWER SYSTEMS BASES 3/4.8.1, 3/4.8.2 A.C. SOURCES, D.C. SOURCES AND ONSITE POWER DISTRIBUTRION SYSTEMS The OPERABILITY of the A.C. and D.C. power sources and associated distribution systems during operation ensures that sufficient power will be available to supply the safety related equipment required for 1) the safe shutdown of the facility and 2) the mitigation and control of accident cond-itions within the facility. The minimum specified independent and redundant A.C. and D.C. power sources and distribution systems satisfy the requirements of Geueral Design Criterion 17 of Appendix "A" to 10 CFR 50.
The ACTION requirements specified for the levels of degradation of the power sources provide restriction upon continued facility operation commensurate with the level of degradation. The OPERABILITY of the power sources are consistent with the initial condition assumptions of the safety analyses and are based upon maintaining at least one redundant set of onsite A.C. and D.C.
power sources and associated distribution systems OPERABLE during accident conditions coincident with an assumed loss of offsite power and single failure of the other onsite A.C. source.
The OPERABILITY of the minimum specified A.C. and D.C. power sources and associated distribution systems during shutdown and refueling ensures that
- 1) the facility can be maintained in the shutdown or refueling condition for extended time periods and 2) sufficient instrumentation and control capability l is available for monitoring and maintaining the unit status.
The Surveillance Requirement for demonstrating the OPERABILITY of the Station batteries are based on the recommendations of Regulatory Guide 1.129,
" Maintenance Testing and Replacement of Large Lead Storage Batteries for Nuclear Power Plants," February 1978, and IEEE Std 450-1980, "IEEE Recommended Practice for Maintenance, Testing, and Replacement of Large Lead Storage Batteries for Generating Stations and Substations."
l Verifying average electrolyte temperature above the mininum for which the l battery was sized, total battery terminal voltage on float charge, connection resistance values and the performance of battery service and discharge tests ensures the effectiveness of the charging system, the ability to handle high l discharge rates and compares the battery capacity at that time with the rated l capacity.
Table 3.8-1 specifies the normal limits for each designated pilot cell and each connected cell for electrolyte level, float voltage and specific gravity. The limits for the designated pilot cells float voltage and specific l gravity, greater than 2. l3 volts and .0L5 below the manufacturer's full charge specific gravity or a battery charger current that had stabilized at a low value, is characteristic of a charged cell with adequate capacity. The normal
- limits for each connected cell for float voltage and specific gravity, greater than 2.l3 volts and not more than .020 below the manufacturer's full charge specific gravity with an average specific gravity of all the connected cells j not more than .010 below the manufacturer's full charge specific gravity, l ensures the OPERABILITY and capability of the battery.
l BEAVER VALLEY - UNIT 1 B 3/4 8-1 l Proposed Wording
{
,- ELECTRIC POWER SYSTEMS
, BASES A.C. SOURCES, D.C. SOURCES AND ONSITE POWER DISTRIBUTION SYSTEMS (Continued)
Operation with a battery cell's parameter outside the normal limit but within the allowable value specified in Table 3.8-1 is permitted for up to 7 days. During this 7 day period: (1) the allowable values for electrolyte level ensures no physical damage to the plates with an adequate electron transfer capability; (2) the allowable value for the average specific gravity of all the cells, not more than .020 below the manufacturer's recommended full charge specific gravity, ensures that the decrease in rating will be less than the safety margin provided in sizing; (3) the allowable value for an indiv-idual cell's specific gravity, ensures that an individual cell's specific gravity will not be more than .040 below the manufacturer's full charge specific gravity and that the overall capability of the battery will be maintained within an acceptable limit; and (4) the allowable value for an i individual cell's float voltage, greater than 2,07 volts, ensures the bat-tery's capability to perform its design function.
i l
i l
BEAVER VALLEY - UNIT 1 B 3/4 8-2 Proposed Wording i
I k
a Attachment B The proposed Technical Specification revisions are in accordance 4
with IEEE 450-1980 and the Standard Technical Specification (NUREG-0452, Revision 4)
The Surveillance Requirements were revised to include quarterly visual inspection, electrolyte temperature measurements, and terminal resistance measurements and an annual performance discharge test fo r batteries which show signs of degradation. Surveillance Requirements are at least as stringent as existing requirements with the exception i of deleting the limit on individual cell voltage deviation from acceptance i value. This requirement is no longer recommended in IEEE 450 or the Standard Technical Specifications.
4 i The BASES vere revised to reflect the changes to the Surveillance
! Requirements.
Therefore, the proposed technical specification changes will not result in significant increases in malfunctions because equal or greater assurance of system operability is provided.
- The OSC and ORC have reviewed this proposed change and based on the
- above safety evaluation, it is concluded there is reasonable assurance that the public health and safety will not be endangered by operation
! in the proposed manner.
I i
f I
- , - - - - - , - , - - , .., 3 -.,y ye rm.-----. .,,,,yeev w.v,- - ,t- --
yw --+g---+-