ML20134M659

From kanterella
Jump to navigation Jump to search

Proposed Tech Specs 3.8.1.1 & 3.8.1.2,increasing Min Useable Fuel Required for Diesel Generators 11 & 12 from 48,000 to 57,200 Gallons & Changing Standby Svc Water Sys
ML20134M659
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/23/1985
From:
MISSISSIPPI POWER & LIGHT CO.
To:
Shared Package
ML20134M656 List:
References
TAC-59536, NUDOCS 8509040208
Download: ML20134M659 (5)


Text

- - - -

= : 2 2.2 2: = :: --

or tha acsockta) SSL<J sJ sysTee sh alI 6e )a.cle 4 i>, op .a n.U<.

. (SSW) system and verification that the design flow can be achieved to all SSW system components. However, should a core offloading be necessary prior to completion of these modifications (scheduled for the first scheduled refueling outage), irradiated fuel may be placed in the spent fuel pool when the RHR system operating in the spent fuel pool cooling mode is available. Until the SSW system is modified, the spent fuel pool cooler s tall be isolated from the SSW system by locked closed valvesr Tie post-s until the tion of these valves shall be verified every 31 day un /4ss fA4.

design flowrate for SSW system is demonstrated lrsMe.*

~

.rysTem ks.* b.n en de.c lo.n d in oy.

i (21) Spent Fuel Pool Ventilation System (Section 9.4.2, SER, $$ER #2) ,

If spent irradiated fuel is placed in the spent fuel pool prior to installation and operability of the safety related backup fuel pool cooling pump room coolers, the plant shall be placed in shutdown condition and remain shutdown with the RHR system dedicated to the fuel pool cooling mode.

(22) Remote Shutdown Panel (Section 9.5.4.1. SER, SSER #2)

Prior to startup following the first refueling outage, MP&L shall install electrical isolation switches between the control room and the Division 1 remote shutdown panel. l (23) Fire Protection Program (Section 9.5.9, SER)

MP&L shall maintain in effect and fully implement all provisions i' of the approved Fire Protection Plan. In addition, MP&L shall maintain the fire protection program to meet the intent of Appendix R to 10 CFR Part 50, except that an oil collection system for the reactor coolant pump is not required.

(24) Interplant Communication Systems (Section 9.6.1.2, SER, SSER #2, i 55ER #4, 55ER #5) l Tests of the communication systems used to mitigate the con-sequences of an event and attain a safe plant shutdown shall be I completed during preoperational and startup tests. An evaluation l of the test results shall be provided for NRC review within 90 l days after test completion. Any system modifications found l necessary as a result of NRC review shall be completed prior to startup following the first refueling autage.

- (25) Reliability of Diesel-Generators (Sections 8.3.1,9.6.3 through 9.6.7, SER, 55ER #2, 53ER #4, 55ER #6)

(a) Prior to startup following the first refueling outage, a j heavy duty turbocharger gear drive assembly shall be j B50904020e e30eg3+=11ad an s11 EMO diesel-generators.

PDR ADOCK 05000416

, P pg

~..__ - - _ _ - - . _ _ _ _ _ _ . . _ _ . _ . . _ _ . _ . _ _ . _ _ . _ _ _ . _ . _ . _ _ _ ~ . _ . . _ _ . _

(y1) Prain sI y s sGlrtd a o LCR N L S - 9 C/D ~z on Jul y '3; I ws (A Ecm- er /ou g, n .c) 1 L (b) Provide the second level undervoltage protection for Division 3 power supply (Item No. 373, T.S. Table 3.3.3-2).

! (c) Incorporate a bypass or coincident logic in all Division 1 and 2 diesel generator protective trips, except for trips on diesel engine overspeed and generator differential cur-1 rent (Item No. 808, T.S. 4.8.1.1.2.d.16.d).

(38) Control Room Leak Rate (Section 6.2.6, SSER #6)

MP&L shall operate Grand Gulf Unit I with an allowable control l

i room leak rate not to exceed 590 cfm. Upon restart of construc-tion of Unit 2 control room, MP&L will be permitted to operate at a leak rate of 760 cfm as evaluated in SSER No. 6.

& zHscar The facility requires exemptions from certain requirements of Appendices l

D.

A and J to 10 CFR Part 50. These include: (a) exemption from General

Design Criterion 17 of Appendix A until startup following the first refueling outage, for (1) the emergency override of the test mode for the Division 3 diesel engine (2) the second level undervoltage protec-tion for the Division 3 diesel engine, and (3) the generator ground 4 i over current trip function for the Division 1 and 2 diesel generators (Section 8.3.1 of SSER #7) and (b) exemption from the requirements of Paragraph III.D.2(b)(ii) of Appendix J for the containment airlock testing following not required (Section normal 6.2.6 door of SSER opening #7 . These w) hen containment exemptions are integrity is authorized by law and will not endanger life or property or the connon l defense and security and are otherwise in dm ;:ublic interest. There-j fore, these exemptions are hereby granted pursuant to 10 CFR 50.12.
  • With the granting of these exemptions, the facility will operate, to l the extent authorized herein, in conformity with the application, as l

}

amended, the provisions of the Act and the rules and regulations of l the Commission. _,

E. MP&L shall maintain in effect and fully implament all the provisions l

of the Connission-approved physical security plan, guard training and qualification plan and safeguards contingency plan, including amend-

' ments made pursuant to the authority of 10 CFR Section 50.54(p). The l

approved plans, which are safeguards information protected under 10 CFR 73.21, are collectively entitled Grand Gulf Nuclear Station

" Physical Security Plan," Revision 1, 2 and 3; the Grand Gulf Nuclear Station " Security Training and Qualification Plan," and the Grand Gulf Nuclear Station " Safeguards Contingency Plan." The identification of vital areas and measures used to control access to these areas, as

' described in the physical security plan, may be subject to amendnents l

in the future based upon a confirmatory evaluation of the plant to determine those areas where acts'of sabotage might cause a release of radionuclides in sufficient quantities to result in dose rates equal l to or exceeding 10 CFR Part 100 guidelines.

i 1

a Insert to Facility Operating License NPF-29 Page 14 (40) With the plant in OPERATIONAL condition 4, SSW cooling tower basin A may be considered OPERABLE in accordance with Technical Specification 3.7.1.3 with less than a 30 day supply of water (without makeup) during the time that

' SSW basin B is drained to replace its associated service water pump provided:

a) SSW basin A water level is maintained greater than or equal to 87".

b) At least two sources of water (other than normal makeup with one source not dependent on offsite power) are available for makeup to SSW basin A.

This license condition may remain in effect until plant startup following the outage scheduled for fall 1985.

4 T

t 1

f a

4 5

i t

?

J14PMI85071201 - 8

i .

3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A. C. - SOURCES A.C. SOURCES - OPERATING LIMITING CONDITION FOR OPERATION

., 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a. Two physically independent circuits between the offsite transmission network and the onsite Class 1E distribution system, and
b. Three separate and independent diesel generators, each with:

. 1. -Separate day fuel tanks containing a minimum of 220 gallons of ,

- fuel.

2. A separate fuel storage system containing'a minimum of:

5 7,2 d o M 00,000 gallons of fuel each for diesel generators 11 and l 12, and b) 39,000 gallons of fuel for diesel generator 13.

3. A separate fuel transfer pump.

APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.

ACTION:

a. With either one offsite circuit or diesel generator 11 or 12 of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveil-lance Requirements 4.8.1.1.1.a within one hour and 4.8.1.1.2.a.4,*

for one diesel generator at a time, within two hours and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least two offsite circuits and diesel generators 11 and 12 to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD ~

SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b. With one offsite circuit and diesel generator 11 or 12 of the above required A.C. electrical power sources inoperable, demonstrate the i OPERABILITY of the remaining A.C. sources by performing Surveillance Requirements 4.8.1.1.1.a within one hour and 4.8.1.1.2.a.4,* for one diesel generator at a time, within two hours e.nd at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least one of the inoperable A.C.

sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT SHUT-DOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following i 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore at least two offsite circuits and diesel genera-tors 11 and 12 to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

" Specification 4.8.1.1.2.a.4 must be performed for diesel generator 13 only when the !{PCS system is OPERABLE.

GRAND GULF-UNIT 1 3/4 8-1 M' **

  • ELECTRICAL POWER SYSTEMS A.C. SOURCES - SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.1.2 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a.

One circuit between the offsite transmission network and the onsite Class lE distribution system, and

b. Diesel generator 11 or 12, and diesel generator 13 when the HPCS system is required to be OPERABLE, with each diesel generator having:
1. A day tank containing a minimum of 220 gallons of fuel.
2. A fuel storage system containing a minimum of:

.f'f 200M'",^^^ gallons of fuel for each OPERABLE diesel generator 11 or 12.

b) 39,000 gallons of fuel for diesel generator 13.

3. A fuel transfer pump.

APPLICABILITY: OPERATIONAL CONDITIONS 4, 5 and *.

ACTION:

a. With all offsite circuits inoperable and/or with diesel generators 11 and 12 inoperable, suspend CORE ALTERATIONS, handling of irradiated fuel in the primary or secondary containment, operations with a potential for draining the reactor vessel and crane operations over the spent fuel storage pool and the upper containment pool when fuel assemblies are stored therein. In addition, when in OPERATIONAL CONDITION 5 with the water level less than 22 feet 8 inches above the reactor pressure vessel flange, immediately initiate corrective action to restore the required power sources to OPERABLE status as soon as practical.
b. With diesel generator 13 inoperable, restore the inoperable diesel  ;

generator 13 to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or declare the HPCS i

system inoperable and take the ACTION required by Specification 3.5.2 l and 3.5.3.

c. The previsions of Specification 3.0.3 are not applicable. l SURVEILLANCE REQUIREMENTS 4.8.1.2 At least the above required A.C. electrical power sources shall be demonstrated OPERABLE per Surveillance Requirements 4.8.1.1.1, 4.8.1.1.2 and 4.8.1.1.3, except for the requirement of 4.8.1.1.2.a.5.

GRAND GULF-UNIT 1 3/4 8-9 M an h ent~ Nd.

. _ - _ - _ _ _ _ _ _ _ _ - _ _ _ - _ _ - - _ - _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ - _ _ _