Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19205A441 + (NRC075 - Dean J., Deschenes, Et. Al., ASR/DEF-Damaged Bent Caps: Shear Tests and Field Implications (August 2009))
- ML19205A442 + (NRC078 - Letter from Paul O. Freeman, NextEra, to NRC, Seabrook Station Response to Confirmatory Action Letter, (May 24, 2012))
- ML19205A445 + (NRC079 - Enclosure 2 to SBK-L-12106, the Evaluation, Impact of ASR on Concrete Structures and Attachments, (May 2012) (Interim Structural Assessment))
- ML19205A446 + (NRC080 - Memorandum from John G. Lamb, NRC, to Meena Khanna, NRC, Forthcoming Meeting with NextEra Energy Seabrook, LLC (NextEra) Regarding Seabrook Station Concrete Degradation (Mar. 23, 2012))
- ML19205A447 + (NRC081 - Letter from Paul O. Freeman, NextEra, to NRC, Seabrook Station Actions for Resolution of Alkali Silica Reaction (ASR) Issues, (May 3, 2012))
- ML19205A448 + (NRC082 - Letter from Paul O. Freeman, NextEra, to NRC, Seabrook Station Actions for Resolution of Alkali Silica Reaction (ASR) Issues, (May 10, 2012))
- ML19205A449 + (NRC083 - Memorandum from William M. Dean, NRC, to R.W. Borchardt, NRC, Request for Deviation from the Reactor Oversight Process Action Matrix to Provide Increased Oversight of the Alkali-Silica Reaction Issue at Seabrook, (Sept. 5, 2012))
- ML19205A450 + (NRC084 - Letter from Darrell J. Roberts, NRC, to Kevin Walsh, NextEra, Deviation from the Reactor Oversight Process Action Matrix for Seabrook Station, Unit No. 1, (Sept. 12, 2012))
- ML19205A451 + (NRC085 - Letter from William M. Dean, NRC, Kevin Walsh, NextEra, Closure of Confirmatory Action Letter 1-12-002, Seabrook Station, Unit 1 (Oct. 9, 2013))
- ML19205A443 + (NRC087 - Email from Justin Poole, NRC, to Kenneth Browne, NextEra, Audit Plan Regarding Seabrook ASR License Amendment Review (Jan. 13, 2017))
- ML19205A444 + (NRC088 - Regulatory Guide (Rg) 1.29, Seismic Design Classification for Nuclear Power Plants (July 2016))
- ML042460383 + (NRC: License Renewal, Joseph M. Farley Nuclear Plant, Georgia and Alabama Federal Agency: NRC HP-040812-002)
- ML20003E672 + (NRC: Who We Are, What We Do - 2019)
- ML15223A393 + (NRCR00104 - on Yee Statement of Professional Qualifications (Revised))
- ML15223A391 + (NRCR00105 - Ching Ng Statement of Professional Qualifications (Revised))
- ML15223A387 + (NRCR00118 - Indian Point Unit 3 Technical Specifications (Excerpt) (Revised))
- ML15223A671 + (NRCR00147- NRC Staff'S Revised Statement of Position on State of New York and Riverkeeper'S Joint Contention NYS-38/RK-TC5 (Revised))
- ML15223A673 + (NRCR00161 - NRC Staff Testimony of Dr. Allen L. Hiser and Mr. Kenneth J. Karwoski Concerning Portions of State of New York and Riverkeeper, Inc. Joint Contention NYS-38/RK-TC5 (Revised))
- ML15231A640 + (NRCR00188 - Letter NL-15-060, Letter from Fred Dacimo, Entergy, to NRC, Entergy Actions Required Prior to Entry Into Period of Extended Operation Associated with License Renewal Application (Lra)(Revised))
- ML15309A221 + (NRCR10001 - NRC Staff Track 2 Exhibit List)
- ML16078A413 + (NRCR11001 - Exhibt List NRC Staff Prefiled Hearing Exhibit List (Revised))
- ML16081A325 + (NRCR12001 - NRC Staff Prefiled Hearing Exhibit List (Revised))
- ML15223A612 + (NRCR20101 - NRC Staff'S Revised Statement of Position Regarding NYS 26B/RK-TC-1B)
- ML15223A702 + (NRCR900001 - NRC Staff Pre-filed Hearing Exhibit List (Revised))
- ML18023A212 + (NRCS-2012 - TN5238--NRCS 2012)
- ML21187A208 + (NRCS_2021_Soil_Report)
- ML15279A507 + (NRC_2014_0317_001 Pge License Amendment for Humboldt Bay Power Plant Unit 3 Humboldt 10-5-15)
- ML20121A018 + (NRC_CpicPolicy_v2.4_2020_Update)
- ML21147A012 + (NRC_Meeting-PWROG_KIC(5-26-21 Final))
- ML24150A116 + (NRC_Presentation_on_Performance-Based_Design)
- ML24306A075 + (NRC_Presubmittal_1_Geuther)
- ML21195A078 + (NRC_RIC_TH26_Ahonen)
- ML20162A086 + (NRC_Regulatory_Framework_Gross_Ruptures_Rev6)
- PMNS20230813, NRCs 2023 Risk Forum Public Meeting - Current and Future Risk Informed Activities from Across Operating, New, and Advanced Reactors Business Lines + (NRCs 2023 Risk Forum Public Meeting - Current and Future Risk Informed Activities from Across Operating, New, and Advanced Reactors Business Lines)
- ML24100A817 + (NRCs 2024 Career Expo Registration Form- Pas Final 4-08-2024)
- ML12096A212 + (NRCs 24th Annual Regulatory Information Conference (RIC) 2012 Thank You Letter to Susan Perkins-Grew)
- ML24312A388 + (NRCs 2nd Acknowledgement Letter NuScale SDAA QAP Implementation Inspection NOV)
- PMNS20200806, NRCs Acceptance Review of Kairos Power LLC Quality Assurance Program Topical Report + (NRCs Acceptance Review of Kairos Power LLC Quality Assurance Program Topical Report)
- PMNS20200682, NRCs Acceptance Review of Kairos Power LLC Quality Assurance Program Topical Report + (NRCs Acceptance Review of Kairos Power LLC Quality Assurance Program Topical Report)
- ML25220A278 + (NRCs Acceptance for Detailed Review of American Centrifuge Operatings Information System Security License Amendment Request)
- ML25042A390 + (NRCs Acceptance for Detailed Review of ACOs License Amendment Request for Phase III HALEU Operations at the ACP in Piketon, Oh)
- ML24208A065 + (NRCs Acceptance for Detailed Review of Centrus/Acos CAAS Exemption Request)
- ML21123A265 + (NRCs Accident Tolerant Fuel Project Plan and Regulatory Perspectives on Storage and Transportation Slides)
- ML12165A607 + (NRCs Analysis of Entergy Nuclear Operations, Inc. Decommissioning Funding Status Report for Indian Point Nuclear Generating Station, Units 1,2, and 3 (TAC Nos. ME8371, Me 8372, and ME8373))
- ML21351A002 + (NRCs Analysis of GE Hitachi Nuclear Energy Decommissioning Funding Status Report for the Shutdown Power Reactors at the Vallecitos Nuclear Center, VBWR and EVESR)
- ML21285A191 + (NRCs Analysis of Holtec Decommissioning Internationals Decommissioning Funding Status Report for Oyster Creek Nuclear Generating Station and Pilgrim Nuclear Power Station, Docket Nos 50-219 and 50-293)
- ML21350A233 + (NRCs Analysis of Omaha Public Power Districts Decommissioning Funding Status Report (License No. DPR-40, Docket No. 50-285))
- PMNS20240944, NRCs Annual Higher Burnup Workshop V + (NRCs Annual Higher Burnup Workshop V)
- ML16167A372 + (NRCs Annual Performance Assessment of Palisades for 2015)
- ML25167A317 + (NRCs Approval of Centrus/Acos Vehicle Barrier System and Fissile Material Storage Area (Public))
- ML12123A082 + (NRCs Assessment of 2012 Decommissioning Funding Status Report for Crystal River Nuclear Generating Plant, Unit 3)