Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19343B926 + (Interim Part 21 Rept Re Transamerica Delaval Turbocharger Thrust Bearings Lubrication,Initially Reported on 810102. Licensee Will Evaluate Manufacturer Proposed Mod.Final Rept Projected for 810602)
- ML20198J487 + (Interim Part 21 Rept Re Transient Analyses at Exposures Prior to Eoc.Nonconformance Rept Prepared & Processed by Mgt Review Team)
- ML20072A726 + (Interim Part 21 Rept Re Use of Defective Matl for Pinion Keys in Limitorque Motor Operators.Initially Reported on 820827.Rept Contains No Proprietary Info)
- ML18101A861 + (Interim Part 21 Rept Re Velan Valve Corp Check Valve Failure to Close.Insp of Internals Showed Moderate Wear in Gap Between Valve Disc & Hanger Arm.New Disc Installed & Valve Tested Satisfactorily)
- ML20054F589 + (Interim Part 21 Rept Re Weld & Radiographic Quality of Sacrificial Shield Monorail & Vent Stack Welds,Initially Reported 820510.HJ Kaiser Co to Perform Complete Review. Final Rept Will Be Submitted by 821231)
- ML20126F252 + (Interim Part 21 Rept Re Weld Discrepancies in Main Control Panels & Auxiliary Relay Racks.Generic Program Developed to Assess Impact of Weld Discrepancies.Completion of Program Expected by 810701)
- ML17262A982 + (Interim Part 21 Rept Re Weld Overlap Area on body-to-bonnet Weld on 1/2-inch ASME Class II Valve Purchased from Henry Vogt Machine Co.Weld Will Be liquid-penetrant Tested Per ASME Class 2 Requirements.Completion Scheduled by 911215)
- ML20249C731 + (Interim Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set Lube Oil & Jacket Water Piping Systems.Completed Exam of Macro & Microstructure & Satisfied Customer Contact Requirements)
- ML17348B441 + (Interim Part 21 Rept Re Westinghouse Reactor Vessel Head Adaptor Tube Cracking.Wog Approved Project Authorization on 920205 for Reactor Vessel Closure Head Penetration Alloy 600 Primary Water Stress Corrosion Cracking)
- ML20072H325 + (Interim Part 21 Rept Re lock-up of RM-23 Display in Radiation Monitoring Sys Giving Erroneous Indication of Channel Activity.Initially Reported on 830223.Problem Software Related.Final Rept Will Be Submitted by 830531)
- ML17265A729 + (Interim Part 21 Rept Re safety-related DB-25 Breaker Mechanism Procured from W Did Not Pas Degradatin Checks When Drawn from Stock to Be Installed Into BUS15/03A.Holes Did Not line-up & Tripper Pan Bent)
- RC-93-0130, Interim Part 21 Rept SSH 930003 Re Three Defective Spare Model D26MR31A Type M Relays Mfg by Cutler-Hammer & Supplied by Automation Ind/Vitro Labs.All Vitro Supplied C-H Relays Placed on Hold & Two Relays Sent Off Site for Evaluation + (Interim Part 21 Rept SSH 930003 Re Three Defective Spare Model D26MR31A Type M Relays Mfg by Cutler-Hammer & Supplied by Automation Ind/Vitro Labs.All Vitro Supplied C-H Relays Placed on Hold & Two Relays Sent Off Site for Evaluation)
- ML20212H142 + (Interim Part 21 Rept SSH 98-002 Re EG-B Unit That Was Sent to Power Control Svcs for Determination of Instability & Refurbishment of a Dg.Cause of Speed Oscillations Unknown. Completed Hot Bore Checks on Power Case)
- ML20126F253 + (Interim Part 21 Rept,Originally Reported on 810128,re Excessive Pressure Drops Across Essential Raw Cooling Water Sys Strainers.Evaluating Test Data to Determine Corrective Action.Next Rept to Be Submitted 810406)
- ML20069K413 + (Interim Part 21 Rept.Detailed Status of Corrective Actions Taken Will Be Sent by 821020)
- U-602954, Interim Part 21 rept,21-98-008 Re Identification That Bearings Installed in Hydrogen Recombiner B Cooling Fan Motor 0HG04CB Were Not Same as Bearings Specified on Motor Nameplate.Will Complete Evaluation of Issue by 980513 + (Interim Part 21 rept,21-98-008 Re Identification That Bearings Installed in Hydrogen Recombiner B Cooling Fan Motor 0HG04CB Were Not Same as Bearings Specified on Motor Nameplate.Will Complete Evaluation of Issue by 980513)
- ML20090E254 + (Interim Part 21/Deficiency Rept 84-20 Re Silicon Controlled Rectifiers in Ite Brown-Boveri Trip Devices.Initially Reported on 840608.Investigation Continuing.Final Rept Will Be Submitted by 841231)
- ML20100E482 + (Interim Part 21/Deficiency Rept 84-46 Re Variation in Physical Characteristics of Tricentric Valves Supplied by Clow Corp.Initially Reported on 841017.Insp by Clow Corp Requested to Determine If Valves Operate Per Tech Specs)
- ML20098E659 + (Interim Part 21/Deficiency Repts 84-06 & 84-14 Re Failure of Steam Generator Snubbers Due to Laminar Indication.Initially Reported on 840807.Corrective Measures Undecided.Review Continuing)
- ML20094N902 + (Interim Part 21/deficiency Rept Re 6.9 Kv Switchgear Circuit Breakers.Initially Reported on 840420.Corrective Action & Submission of Final Report Will Be Accomplished by 841001)
- PLA-2120, Interim Part 21/deficiency Rept Re Base Metal Cracking in Fittings Used on Class IE Electrical Raceways & HVAC Supports.Initially Reported on 840206.Final Rept Expected Prior to Initial Criticality + (Interim Part 21/deficiency Rept Re Base Metal Cracking in Fittings Used on Class IE Electrical Raceways & HVAC Supports.Initially Reported on 840206.Final Rept Expected Prior to Initial Criticality)
- ML20094F533 + (Interim Part 21/deficiency Rept Re Busses on Colt Industries Diesel Generator Lube Oil Pump Discharge Nozzles.Initially Reported on 840425.Design for Tapered Thread Adapter Changed.Next Rept Expected by 840807)
- AECM-84-0311, Interim Part 21/deficiency Rept Re Flow Rate in Standby Svc Water Sys Loops a & B & Loss of Standby Svc Water Basin Transfer Capability.Initially Reported on 810303.Larger Capacity Pumps Will Be Installed + (Interim Part 21/deficiency Rept Re Flow Rate in Standby Svc Water Sys Loops a & B & Loss of Standby Svc Water Basin Transfer Capability.Initially Reported on 810303.Larger Capacity Pumps Will Be Installed)
- ML20099G735 + (Interim Part 21/deficiency Rept Re Improper Operation of Emergency Generator Load Sequencers Supplied by Vitro Labs. Initially Reported on 850117.Engineering Design Package Will Be Reviewed.Update Will Be Provided by 850415)
- ML20086J939 + (Interim Part 21/deficiency Rept Re Low Pressure Safety Injection & CS Pump Motors W/Defective Welds & Oil Leaks. Initially Reported on 830629.Due to Extensive Investigation, Final Rept Will Not Be Submitted Until 840206)
- ML20263C264 + (Interim Piping & Instrument Diagram:Process Sampling System. Sheet 4)
- ML20263C267 + (Interim Piping & Instrument Diagram:Process Sampling System. Sheet 5)
- ML20086F471 + (Interim Plugging Criteria 90 Day Rept)
- ML20085F920 + (Interim Plugging Criteria 90 Day Rept)
- ML20084V210 + (Interim Plugging Criteria 90 Day Rept)
- ML20097C335 + (Interim Plugging Criteria 90 Day Rept)
- ML20086S416 + (Interim Plugging Criteria 90 Day Rept. Unit 2)
- ML20087G110 + (Interim Plugging Criteria Return to Power Ltr Rept)
- ML20095G069 + (Interim Plugging Criteria Return to Power Rept)
- ML20094K610 + (Interim Plugging Criteria Return to Power Rept)
- ML20113B095 + (Interim Plugging Criteria Return to Power Rept)
- ML20141G636 + (Interim Plugging Criteria Return to Power Rept)
- ML20096F859 + (Interim Potential Const & Design Deficiency Rept Re Underrated Electrical Cable.Initially Reported on 840720. Cable Conductor Temp Rating of 150 C Instead of 90 C Required.Next Rept Will Be Submitted by 840928)
- ML20090D601 + (Interim Potential Const Deficiency Rept Re Differential Pressure Switches Installed on Emergency Diesel Generators by Colt Industries.Initially Reported on 840419.Item Withdrawn as Reportable Per 10CFR50.55(e))
- ML20028D661 + (Interim Potential Const Deficiency Rept Re Emergency Diesel Generator O Rings.Initially Reported on 821213.Colt Industries Reported Potential Problem If Cooling Sys Contaminated W/Diesel Fuel.Also Reportable Per Part 21)
- ML20134H239 + (Interim Potential Const Deficiency Rept Re Heat Buildup in Emergency Diesel Generator Cabinets.Initially Reported on 850403.Util Will Perform Onsite Test of Equipment During Aug.Final Rept Will Be Submitted by 850915)
- ML20096E661 + (Interim Potential Const Deficiency Rept Re Silicon Controlled Rectifiers in Emergency Diesel Generator Exciters.Initially Reported on 840503.Item Not Reportable Per 10CFR50.55(e))
- ML20079R506 + (Interim Potential Const Deficiency Rept Re Agastat Time Delay Relays.Initially Reported on 831207.Four Defective Relays Identified.Next Rept by 840125)
- ML20091N888 + (Interim Potential Const Deficiency Rept Re 13 Defective GE Hea Relays Due to Malfunction in Trip Force Values.Initially Reported on 840502.Replacement Relays from GE Scheduled for Aug 1984.Next Rept Will Be Submitted by 840921)
- ML20083K956 + (Interim Potential Deficiency Rept 55-83-10 Re Weld Defects on Containment Liner Dome.Initially Reported on 831201. Investigation Continuing.Next Rept Will Be Issued in 90 Days)
- ML20083Q769 + (Interim Potential Deficiency Rept 55-83-08 Re Const Damage to Guard Pipe Bellows Assemblies.Initially Reported on 830627.Addl Evaluation Necessary to Determine Significance of Damage to Assemblies.Final Rept Expected in 120 Days)
- ML20077G222 + (Interim Potential Deficiency Rept 55-83-07 Re Pipe Shop Welds by Southwest Fabricating.Initially Reported on 830614. Plan Developed Detailing Actions Required,Including Review of Issue by Independent Third Party)
- ML20116H477 + (Interim Potential Deficiency Rept 55-84-18 Re ASTM A-36 Plate Matl.Initially Reported on 840803.List of Plate Matls Purchased from Interstate Compiled.Util Evaluating Adequacy of A-36 Matl)
- ML20114B647 + (Interim Potential Deficiency Rept 55-84-02 Re Problems Concerning Identification & Traceability of Installed Electrical Hanger Matls.Initially Reported on 840111.Next Rept to Be Submitted within 45 Days)
- ML20094B289 + (Interim Potential Deficiency Rept 55-84-14 Re Baldwin Assoc QA Vendor Surveillance Program.Initially Reported on 840621. Investigation Incomplete.Update on Investigation Will Be Submitted in Approx 90 Days)
- U-102142, Interim Potential Deficiency Rept 55-84-12 Re Installation of Concrete Expansion Anchors in Floors W/Finishing Slabs. Initially Reported on 840604.Investigation Continuing.Next Rept Will Be Submitted within 90 Days + (Interim Potential Deficiency Rept 55-84-12 Re Installation of Concrete Expansion Anchors in Floors W/Finishing Slabs. Initially Reported on 840604.Investigation Continuing.Next Rept Will Be Submitted within 90 Days)
- ML20090H059 + (Interim Potential Deficiency Rept 55-84-12 Re Installation of Concrete Expansion Anchors in Floors W/Finishing Slabs. Initially Reported on 840604.Investigation Planned to Determine Extent of Problem)
- U-600239, Interim Potential Deficiency Rept 55-84-18 Re ASTM A-36 Plate Matl.Interim Repts Submitted on 850401 & 0703.Safety Significance Evaluation Completed.Addl 30 Days Needed to Finalize Investigation & Submit Final Rept + (Interim Potential Deficiency Rept 55-84-18 Re ASTM A-36 Plate Matl.Interim Repts Submitted on 850401 & 0703.Safety Significance Evaluation Completed.Addl 30 Days Needed to Finalize Investigation & Submit Final Rept)
- ML20086P162 + (Interim Potential Deficiency Rept 55-84-03 Re Irregularities in Installation of Concrete Expansion Anchors.Initially Reported on 840111.Caused by Craftsmen Not Instructed Properly & Failure to Perform in-process QC Insp)