Interim Potential Const Deficiency Rept Re Heat Buildup in Emergency Diesel Generator Cabinets.Initially Reported on 850403.Util Will Perform Onsite Test of Equipment During Aug.Final Rept Will Be Submitted by 850915
ML20134H239
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 08/07/1985
From: Martin T
Public Service Enterprise Group
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8508280332
Download: ML20134H239 (2)


Text

_

'>*i

+

Public Service Electric and Gas

, 4*

Cornpany Thomas J. Martin 80 Park Plaza, Newark, NJ 07101 201-430-8316 Mailing Address: P.O. Box 570, Newark, NJ 07101 Vico President -

Engineering and Construction August 7, 1985 Dr. Thomas E. Murley, Administrator U.

S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Dr. Murley:

POTENTIAL CONSTRUCTION DEFICIENCY HEAT BUILD-UP IN EDG CABINETS HOPE CREEK GENERATING STATION On April 3, 1985, a verbal report was made to Region I, Office of Inspection and Enforcement representative, Mr.

E.

Kelly, advising of a potentially significant construction deficiency concerning heat build-up due to three (3) transformers mounted inside the generator control cabinets.

On May 6, 1985, an interim report was sent to your office.

The following interim report is provided in accordance with 10CFR50.55(e).

Our Architect / Engineer and Constructor, Bechtel, has advised us that three (3) panels were fabricated and tested in Colt Industries' shop under simulated jobsite conditions.

Pre-liminary test results indicate that the panel temperatures

-may exceed the environmental qualification temperature limits of the transformers when the diesel generators are run under

. full rated load.

We have reviewed the test conditions established by Colt Industries and conclude that they differ from the installed condition of the Hope Creek generator control cabinets in several respects.

Consequently, we intend to perform an

-8508280332 850807 N

PDR ADOCK 05000354 0

I\\

S PDR v\\

~

+

7,w.

.v Dr.

T.

E. Murley 2

8/7/85 onsite test of the Hope Creek equipment during the month of August.

The ambient temperature of the control cabinet will be monitored and recorded during a twelve hour test run.

We anticipate providing you with a final report on this

. issue by September 15, 1985, to include the requisite safety analysis.

Very truly yours, C -

Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D.

C.

20555 NRC Resident Inspector - Hope Creek P.

O.

Box 241 Hancocks Bridge, NJ 08038 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 i

l t_-