Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18270A374 + (Interim Letter: Chapters 7 and 8 of the NRC Staffs Safety Evaluation Report with Open Items Related to the Certification of the Nuscale Small Modular Reactor)
- ML19107A174 + (Interim Letter: Chapters 9, 10, 11, 12, and 16 of the NRC Staffs Safety Evaluation Report with Open Items Related to the Design Certification Application Review of the NuScale Small Modular Reactor)
- ML19331A036 + (Interim Letter: the NRC Staffs Safety Evaluation Report with No Open Items for Chapters 8 and 18 and the Advanced Accumulator Topical Report Related to the Certification of the US-APWR Design)
- ML19151A306 + (Interim Letters: Chapters 4 and 5 of the NRC Staffs Safety Evaluation Report with Open Items Related to the Design Certification Application Review of the Nuscale Small Modular Reactor)
- ML20079A149 + (Interim Licensing Criteria for Physical Protection of Certain Storage of Spent Fuel)
- Regulatory Guide 1.42 + (Interim Licensing Policy as Low as Practicable for Gaseous Radioiodine Releases from Light-Water-cooled Nuclear Power Reactors)
- ML19322B651 + (Interim Liquid Waste Disposal Sys,Interim Gaseous Waste Disposal Sys)
- RIS 2008-32, Interim Low Level Radioactive Waste Storage at Reactor Sites + (Interim Low Level Radioactive Waste Storage at Reactor Sites)
- ML19305D508 + (Interim Memorandum & Order Directing Licensee to Answer Interrogatory 16 of Aamodt 800225 Fourth Set of Interrogatories,Re Contention 2 in Restart Proceeding)
- ML13079A321 + (Interim Milestones for National Fire Protection Association (NFPA) 805 Compliance and Associated Compensatory Measures)
- ML19338E954 + (Interim Mod to Tech Spec Change Requests 42 & 58.Tech Spec 15.4.5.II.B.2 Should Be Revised to Delete Procedural Steps Associated W/Surveillance Testing Requirement of Spray Additive Valve)
- TXX-4853, Interim Modules Deficiency Rept CP-86-10 Re Defect in Electrical Penetration Assembly Supplied by Bunker Ramo. Investigation Scheduled for Completion by 860701.Next Rept Will Be Submitted by 860722 + (Interim Modules Deficiency Rept CP-86-10 Re Defect in Electrical Penetration Assembly Supplied by Bunker Ramo. Investigation Scheduled for Completion by 860701.Next Rept Will Be Submitted by 860722)
- ML20150F288 + (Interim Monitoring Study for Jul 1978-June 1979)
- ML20030D246 + (Interim Monitoring Study for June 1980-Jul 1981)
- ML19340B166 + (Interim Monitoring Study,Jul 1979-June 1980)
- ML20042B475 + (Interim Monitoring,1974-75)
- ML20178A377 + (Interim NMSS Procedure SA-202, Review of Regulations and Other Program Elements by the Standing Committee on Compatibility)
- ML070820448 + (Interim NRC Examination Report 2007-301)
- ML020910234 + (Interim NRC Review of Final Significance Determination Appeal of a White Finding and Notice of Violation for NRC Inspection Report No. 50-445/01-07: 50-446/01-07)
- L-PI-07-022, Interim Notification Per 10 CFR 21 Regarding Replacement Battery Post Seal Corrosion Issues + (Interim Notification Per 10 CFR 21 Regarding Replacement Battery Post Seal Corrosion Issues)
- ML18211A302 + (Interim Notification Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 11 KLVS146)
- ML19077A096 + (Interim Notification Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. ZJS1518)
- ML19361A029 + (Interim Notification Under 10, CFR Part 21 for Rosemount Model 1153 and 1154 Pressure Transmitters)
- L-MT-13-114, Interim Notification for Dry Shielded Canister MNP-61 BTH-1-B-2-016 Pursuant to 10 CFR 72.212, Conditions of General License Issued Under 10 CFR 72.210, for the Storage of Spent Fuel + (Interim Notification for Dry Shielded Canister MNP-61 BTH-1-B-2-016 Pursuant to 10 CFR 72.212, Conditions of General License Issued Under 10 CFR 72.210, for the Storage of Spent Fuel)
- ML21089A050 + (Interim Notification for Potential Part 21)
- ML20004C740 + (Interim Nuclear Div)
- ML20024B278 + (Interim Operating Guideline for Response to Allow Maint of HPI Sys on Low RCS Pressure)
- ML19290D544 + (Interim Order on Emergency Planning Late Contentions.Accepts Aamodt 800115 Contentions 4 & 5,Newberry Intervenors Contentions 3(d)(1)(13) 7 & 9-12 & Certain Environ Coalition on Nuclear Power Contentions.W/Certificate of Svc)
- ML20091N981 + (Interim Part 21 & Const Deficiency Rept Re Ethylene Propylene Seals on Four Gh Bettis Actuators Which May Swell Due to Absorbing Oils from Actuator Lubricant.Initially Reported on 840503.GH Bettis Submitted Part 21 Rept)
- ML20137R190 + (Interim Part 21 & Deficiency Rept (CDR 85-00-12) Re Gt Strudl Computer Program Error.Initially Reported on 850916. Evaluation of 25 Sample Runs Discovered No Impact.Generic Evalution in Process.Final Rept Expected by 860115)
- ML20202F460 + (Interim Part 21 & Deficiency Rept (Rdc 145(86)) Re Kaman Instrumentation Co High Voltage Power Supply (P/N 450447) Found Oscillating Between 240 & 1,030 Volts at 100 Hz. Initially Reported on 860326.Investigation Continuing)
- AECM-84-0357, Interim Part 21 & Deficiency Rept 1 Re Pieces of Steel Received for Use from Dubose Steel,Inc.Initially Reported on 840601.Final Determination Underway.Final Rept Expected by 841031 + (Interim Part 21 & Deficiency Rept 1 Re Pieces of Steel Received for Use from Dubose Steel,Inc.Initially Reported on 840601.Final Determination Underway.Final Rept Expected by 841031)
- ML20097A826 + (Interim Part 21 & Deficiency Rept 116 Re Failure of Static Uninterruptible Power Supply Inverters.Initially Reported on 840726.All 72 Capacitors Replaced W/Newly Qualified Capacitors (Style 020 139))
- ML20097F453 + (Interim Part 21 & Deficiency Rept 149 Re Gh Bettis Actuators W/Swollen Seals.Caused by Reaction of Ethylene Propylene Seals W/Lubricant Mobile 28)
- ML20091M297 + (Interim Part 21 & Deficiency Rept 2 Re Internal Coating of MSRV & MSIV Accumulators.Caused by Improper Surface Preparation & Application of Coating.Tanks Will Be Replaced W/Stainless Steel Tanks)
- ML20113B128 + (Interim Part 21 & Deficiency Rept 55-84-23 Re Ruskin Interlocking Blade Fire Dampers.Initially Reported on 841203.Cause of Deficiency Will Be Determined by Vendor. Investigation Plan Implemented)
- ML20137N610 + (Interim Part 21 & Deficiency Rept 85-08 Re Isolated Failures of Betts Spring Co Intake & Exhaust Valve Springs Reported by Tdi.Initially Reported on 851218.Corrective Actions Will Be Pursued If Units Reactivated)
- TXX-4662, Interim Part 21 & Deficiency Rept CP-85-48 Re Diesel Generator Intake Silencer Internals That May Dislodge & Be Ingested by Turbocharger.Initially Reported on 851205. Evaluation Completion Anticipated by 860131 + (Interim Part 21 & Deficiency Rept CP-85-48 Re Diesel Generator Intake Silencer Internals That May Dislodge & Be Ingested by Turbocharger.Initially Reported on 851205. Evaluation Completion Anticipated by 860131)
- TXX-4691, Interim Part 21 & Deficiency Rept CP-86-01 Re Supplier of Terminal Blocks Used in Class 1E Applications.Initially Reported on 860107.Supplier Requested to Perform Addl Tests & Provide Info for Hardware.Final Rept by 860307 + (Interim Part 21 & Deficiency Rept CP-86-01 Re Supplier of Terminal Blocks Used in Class 1E Applications.Initially Reported on 860107.Supplier Requested to Perform Addl Tests & Provide Info for Hardware.Final Rept by 860307)
- TXX-4915, Interim Part 21 & Deficiency Rept CP-86-47 Re Generic Design Concern W/Qualification of Fire Barrier Seals Supplied by Bisco.Initially Reported on 860616.Evaluation Continuing. Next Rept Will Be Submitted by 860829 + (Interim Part 21 & Deficiency Rept CP-86-47 Re Generic Design Concern W/Qualification of Fire Barrier Seals Supplied by Bisco.Initially Reported on 860616.Evaluation Continuing. Next Rept Will Be Submitted by 860829)
- TXX-5002, Interim Part 21 & Deficiency Rept CP-86-46 Re Design Change to Gould Battery Racks Transverse Bracing.Technical Disposition of Nonconformance & Resolution of Design Changes to Be Complete by 860930.Next Rept by 861021 + (Interim Part 21 & Deficiency Rept CP-86-46 Re Design Change to Gould Battery Racks Transverse Bracing.Technical Disposition of Nonconformance & Resolution of Design Changes to Be Complete by 860930.Next Rept by 861021)
- TXX-4876, Interim Part 21 & Deficiency Rept CP-86-41 Re LOCA Evaluations on Effects of Operational Status of Plant Equipment During Mode 4 Operation of Eccs.Initially Reported on 860528.Evaluation Underway.Next Rept Expected by 860813 + (Interim Part 21 & Deficiency Rept CP-86-41 Re LOCA Evaluations on Effects of Operational Status of Plant Equipment During Mode 4 Operation of Eccs.Initially Reported on 860528.Evaluation Underway.Next Rept Expected by 860813)
- TXX-4900, Interim Part 21 & Deficiency Rept CP-86-46 Re Design Change to Gould Battery Racks Transverse Bracing W/O Formal Evaluation by Vendor.Initially Reported on 860611.Util Evaluation Continuing.Next Rept Will Be Submitted by 860827 + (Interim Part 21 & Deficiency Rept CP-86-46 Re Design Change to Gould Battery Racks Transverse Bracing W/O Formal Evaluation by Vendor.Initially Reported on 860611.Util Evaluation Continuing.Next Rept Will Be Submitted by 860827)
- ML20245D772 + (Interim Part 21 & Deficiency Rept CP-89-007 Re Failure of Rosemount Model 1153 & 1154 Transmitters.Initially Reported on 890320.Evaluation of Safety Impact on Plant Operations Continuing.Next Rept Will Be Issued by 890731)
- ML20244C252 + (Interim Part 21 & Deficiency Rept CP-89-06 Re Connecting Linkage for Closing Spring Charging Motors in Class 1E 6.9 Kv Switchgear.Initially Reported on 890313.Class 1E Circuit Breakers to Be Inspected.Scheduled Completion Dates Stated)
- ML20247N778 + (Interim Part 21 & Deficiency Rept CP-89-003 Re Cable Assemblies for post-accident Neutron Flux Monitors Supplied by Gamma-Metrics (Gm).Initially Reported on 890215.GM Part 21 Rept Issued.Next Rept Will Be Issued Prior to Fuel Load)
- ML20137R070 + (Interim Part 21 & Deficiency Rept CRD 85-00-17 Re Binding of Telemecanique (Formerly Gould) Motor Control Starters. Initially Reported on 851018.Mfg Insp of Starters Planned. Next Rept Will Be Submitted by 860131)
- ML20133P161 + (Interim Part 21 & Deficiency Rept D/N 59 Re Cracked Welds on Diesel Generator Air Deflectors Supplied by Louis-Allis Co. Initially Reported on 850624.Corrective Actions Not Received from Vendor.Next Rept Expected by 850927)
- U-101988, Interim Part 21 & Deficiency Rept Re ASTM A-36 Plate Matl. Initially Reported on 840803.Investigation Plan Implemented as Listed.Next Rept Will Be Provided in Approx 90 Days + (Interim Part 21 & Deficiency Rept Re ASTM A-36 Plate Matl. Initially Reported on 840803.Investigation Plan Implemented as Listed.Next Rept Will Be Provided in Approx 90 Days)
- ML20083Q631 + (Interim Part 21 & Deficiency Rept Re Bettis Actuator Keying Problem W/Fisher Valves.Initially Reported on 840315.Cause Not Determined.Insp Incomplete Pending Vendor Analysis.Final Rept Expected Prior to Fuel Load)
- ML20093E764 + (Interim Part 21 & Deficiency Rept Re Boeing Steam Generator Snubber Failure Due to High Pressure Metallic Seal Nonconformity.Initially Reported on 840731.First Rebuilt Unit to Be Tested Approx 841005)