Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML24026A196 + (GEH - Response to NRC Request for Additional Information)
- ML21111A334 + (GEH - Response to Request for Additional Information for Acceptance Review of the Morris Operation SNM-2500 Decommissioning Funding Plan (DFP))
- ML20031C699 + (GEH - Responses to the NRC Requests for Additional Information for the GE Model No. 2000)
- ML19081A143 + (GEH - Revised Vnc Site Physical Security Plan (PSP))
- ML19081A122 + (GEH - Revised Vnc Site Physical Security Plan (PSP))
- ML23230A393 + (GEH - SNM-960 Triennial Update - Facility Decommissioning Funding Plan (DFP) NRC Request for Additional Review)
- M190063, GEH - Submittal of Annual Nuclear Test Reactor (Ntr) Operating Report for the Year 2018 + (GEH - Submittal of Annual Nuclear Test Reactor (Ntr) Operating Report for the Year 2018)
- ML19081A042 + (GEH - Submittal of Annual Nuclear Test Reactor (Ntr) Operating Report for the Year 2018)
- ML24103A024 + (GEH - Submittal of Annual Nuclear Test Reactor (Ntr) Operating Report for the Year 2023)
- ML21265A247 + (GEH - Supplemental Information Supporting GE Nuclear Test Reactor License Renewal Audit Questions and Responses)
- ML21265A246 + (GEH - Supplemental Information Supporting GE Nuclear Test Reactor License Renewal Audit Questions and Responses)
- M190202, GEH - Third Reply to NRC Request for Information Needed for GE-Hitachi Exemption Request for Alternate Decommissioning Schedules + (GEH - Third Reply to NRC Request for Information Needed for GE-Hitachi Exemption Request for Alternate Decommissioning Schedules)
- ML19319B845 + (GEH - Third Reply to NRC Request for Information Needed for GE-Hitachi Exemption Request for Alternate Decommissioning Schedules)
- M200039, GEH - Vallecitos Nuclear Center Getr Site Specific Cost Estimate and Decommissioning Funding Plan + (GEH - Vallecitos Nuclear Center Getr Site Specific Cost Estimate and Decommissioning Funding Plan)
- ML20066J983 + (GEH - Vallecitos Nuclear Center Getr Site Specific Cost Estimate and Decommissioning Funding Plan)
- ML18199A273 + (GEH ABWR DC Renewal Audit Plan - PCT Increase)
- ML18324A747 + (GEH ABWR DC Renewal SE for Subsections 8.2.5 and 8.3.3)
- ML18170A118 + (GEH ABWR DC Renewal Safety Evaluation for Subsection 6.2.1.6)
- ML24054A539 + (GEH Additional Information Supporting Authorization of the GE Nuclear Test Reactor Possession-Only License (Pol))
- LR-N16-0113, GEH Affidavits Supporting the Withholding of Information in Enclosure 6 from Public Disclosure + (GEH Affidavits Supporting the Withholding of Information in Enclosure 6 from Public Disclosure)
- ML22118B146 + (GEH Annual Nuclear Test Reactor (Ntr) Operating Report No. 62 for the Year 2021 (Rev 1))
- ML18108A248 + (GEH Annual Nuclear Test Reactor (Ntr) Operating Report for the Year)
- ML18108A250 + (GEH Annual Nuclear Test Reactor (Ntr) Operating Report for the Year 2017)
- M210041, GEH Annual Nuclear Test Reactor (Ntr) Operating Report for the Year 2020 + (GEH Annual Nuclear Test Reactor (Ntr) Operating Report for the Year 2020)
- ML21088A323 + (GEH Annual Nuclear Test Reactor (Ntr) Operating Report for the Year 2020)
- ML16300A120 + (GEH Annual Shutdown Reactor Report for 2016 - Getr Revision 1)
- M180070, GEH Annual Shutdown Reactor Reports for the Year 2017 + (GEH Annual Shutdown Reactor Reports for the Year 2017)
- ML18088A736 + (GEH Annual Shutdown Reactor Reports for the Year 2017)
- ML22089A223 + (GEH Annual Shutdown Reactor Reports for the Year 2021)
- ML23083B340 + (GEH Annual Shutdown Reactor Reports for the Year 2022)
- ML20086K769 + (GEH Annual Shutdown Rector Reports for the Year 2019)
- ML23023A143 + (GEH BWRX-300 December 14, 2022 Public Meeting White Paper and TR Safety Strategy Summary Encl. 3)
- ML23023A149 + (GEH BWRX-300 December 14, 2022 Public Meeting White Paper and TR Safety Strategy Summary Encl. 1)
- ML23023A150 + (GEH BWRX-300 December 14, 2022 Public Meeting White Paper and TR Safety Strategy Summary Memo)
- ML23023A147 + (GEH BWRX-300 December 14, 2022 Public Meeting White Paper and TR Safety Strategy Summary Encl. 2)
- ML22040A003 + (GEH BWRX-300 LTR NEDO-33914, Advanced Civil Construction and Design Approach - Letter to GEH)
- ML22040A005 + (GEH BWRX-300 LTR NEDO-33922P, Containment Evaluation Method - Afser Letter to GEH)
- ML23087A095 + (GEH BWRX-300 March 8, 2023, Public Meeting Summary LTR NEDC-33934P, Safety Strategy)
- ML22353A589 + (GEH BWRX-300 Observation Public Meeting Summary on Steel-Plate Composite Structural Design White Paper)
- ML19326A016 + (GEH BWRX-300 PM Assignment Letter October 2019 Final)
- PMNS20200052, GEH BWRX-300 Public Meeting + (GEH BWRX-300 Public Meeting)
- ML23024A006 + (GEH BWRX-300 Public Meeting TR Instrumentation and Controls Architecture Summary)
- ML22215A081 + (GEH BWRX-300 Public Meeting TR Safety Strategy Summary June 29 2022 Memo)
- ML22294A006 + (GEH BWRX-300 Public Meeting TR Severe Accident Management and Source Term Methodology Summary October 5 2022)
- PMNS20241380, GEH BWRX-300 Public Meeting to Discuss GEH Proposed Changes to Sccv and RB Structural Design Topical Report + (GEH BWRX-300 Public Meeting to Discuss GEH Proposed Changes to Sccv and RB Structural Design Topical Report)
- ML22228A266 + (GEH BWRX-300 SMR - -A LTR Verification GEH BWRX-300 NEDC-33922, Containment Evaluation Method)
- ML22118A371 + (GEH BWRX-300 SMR - Approval Letter for GEH LTR NEDC-33922P Containment Evaluation Method Revision 2)
- ML22118A075 + (GEH BWRX-300 SMR - Approval Letter for GEH LTR NEDO-33914, BWRX-300 Advanced Civil Construction and Design Approach)
- ML24172A107 + (GEH BWRX-300 SMR - April 25, 2024 Pre-Application Public & Partially Closed Meeting with GEH Regarding BWRX-300 Reactor Stability)
- ML23221A341 + (GEH BWRX-300 SMR - FW Acceptance Review Observations to GEH for the Containment and Reactor Building Structural Design LTR)
- ML24338A269 + (GEH BWRX-300 SMR - FW GE Vernova Hitachi BWRX-300 Safety Strategy - Draft Request for Additional Information Regarding Postulated Loss-of-Coolant Accidents for the BWRX-300 Design)