Text
SAFEGUARDS INFORMATION PURSUANT TO 10CFR73.21 Security-Related Information - Withhold from Public Disclosure per 1 O CFR 2.390 When separated from both Safeguards Information enclosure(s) and Security-Related Information enclosure(s), this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.
HITACHI M190053 March 20, 2019 Director, Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852
Subject:
GEH Revised VNC Site Physical Security Plan (PSP)
References:
- 1) NAC License R-33, Docket 50-73
- 2) NAC License SNM-960, Docket 70-754 GE Hitachi Nuclear Energy.
Matt J. Feyrer Site Manager,
- Vallecltos Nuclear Center 6705 Vallecltos Rd Sunol, CA 94586 USA T 925 918 6018.
Matt.feyrer@ge.com
- 4) Letter, T. A. Caine (GEH) to Director,.Dlvision of Security Polley (NAC), "GEH Revised VNC Site Physical Security Plan", 3/21/16
- 5) Telecom, GEH andNRC NMSS/NSIR Staff, 3/6/19
Dear Sir or Madam:
. GE Hitachi Nuclear Energy Americas LLC (GEH) hereby submits a revised Vallecitos Nuclear Center (VNC) Site Physical Security Plan dated March 19, 2019, pursuant t_o 10 CFA 50.54 and to 10 CFR 70.32.
The revised VNC Site PSP includes clarifications of security measure details related to the facility site developed area and replaces the pr1;1vious plan dated March 21, 2016, in its entirety.
These PSP changes have been internally reviewed and documented as those that do not decrease the plan effectiveness and do not require prior NRC approval in accordance with 10 CFR50.54{p){2) or 10 CFR 70.32(e). provides a report describing the changes to the plan pursuant to 1 O CFR 50.54{p){2) and 10 CFR 70.32(e). Enclosure 2 is the revised plan itself. Text changes in the plan are indicated with a vertical line to the right of the changed text.
Note that Enclosure 1 contains security-related information and, as a result, GEH
, requests that Enclosure 1 be ~ithheld from public disclosure per 10 CFR 2.90 and NRC
Note that Enclosure 2_ VNC Site Physical Security Plan contains Safeguards Information, and as a result, GEH requests that Enclosure 2 be withheld from public disclosure per 10 CFR 2.90 and 73.21.
SAFEGUARDS INFORMATION SD D AD z_D N'vt s s z__o rJfLR-
:------------~l",;:T*M--a-S--
Director, NMSS U.S. NRC GEH Revised VNC Site Physical Security.Plan M190053 March 20, 2019 Page2 of 2 Upon removal of all of Enclosures 1 and 2, this transmittal letter may be decontrolled.
- Please contact me on (925) 918-6018,*if you have any questions or would like to discuss this matter further.
~~
Matt Feyrer,. Site Manager Vallecitos Nuclear Center
Enclosures:
(1) GEH Report Describing Changes to VNC Site Physical Security Plan (Security-Related Information)
(2) Revised VNC Site Physical Security Plan, March 19, 2019 (Safeguards Information) cc: NRC Region II Administrator, Atlanta, GA NRC Region IV Administrator, Arlington, TX D~ Hardesty, NRC NRR/DPA (w/o enclosures)