FW: Acceptance Review Observations to GEH for the Containment and Reactor Building Structural Design LTR This email is for the purpose of documenting staff observations submitted to GEH for the acceptance review of topical report NEDC-33926P/NEDO-33926.
From: Diaz-Quiroz, Jesus G. (GE Vernova) Jesus.Diaz-Quiroz@ge.com Sent: Thursday, July 13, 2023 10:40 AM To: Jordan Glisan Jordan.Glisan@nrc.gov Cc: Jim Shea James.Shea@nrc.gov; Michelle Hayes Michelle.Hayes@nrc.gov; Wadkins, George (GE Vernova) George.Wadkins@ge.com
Subject:
[External_Sender] RE: Follow Up on GEH Containment and Reactor Building Structural Design LTR Acceptance Review Observations
- Jordan, We plan on providing requested the information by July 31. Also, the provided observations do not contain proprietary information.
- Regards, Jesús Diaz-Quiroz U.S. Licensing Manager, New Power Plants and Products GE Hitachi Nuclear Energy M 910 200 8535 jesus.diaz-quiroz@ge.com 3901 Castle Hayne Road M/C A65 PO Box 780 Wilmington, NC 28401 USA From: Jordan Glisan Sent: Friday, July 7, 2023 1:06 PM To: Diaz-Quiroz, Jesus G. (GE Power Portfolio) <Jesus.Diaz-Quiroz@ge.com>; Wadkins, George (GE Power Portfolio) <George.Wadkins@ge.com>
Cc: Chouha, Lamia (GE Vernova, consultant) <Lamia.Chouha@ge.com>; Michelle Hayes
<Michelle.Hayes@nrc.gov>; Jim Shea <James.Shea@nrc.gov>
Subject:
Acceptance Review Observations to GEH for the Containment and Reactor Building Structural Design LTR Good afternoon,
Thank you again for meeting with us today to have this discussion. Please find the observations shared in our call attached. This email is encrypted, and the attached document is password protected, the password will follow.
Again, it is requested that GEH provide us with the timeframe of when the identified information can be provided to the NRC staff.
Best Regards, Jordan Glisan Project Manager U.S. Nuclear Regulatory Commission NRR/DNRL/NLIB Phone: 301-415-3478 EMAIL ATTACHMENT Review Observations:
- 1. [Acceptance Review Item] LTR Section 3.1 states, in part. The proposed design approaches for the RB,.using these SC modules [with diaphragm plates] are supplemented by a test program that is being performed under the NRIC Advanced Construction Technology (ACT) project Section 7.0 of the LTR provides a summary of the National Reactor Innovation Center (NRIC) Demonstration Program prototype test conclusions that is relied upon in the LTR as a critical and essential technical basis for confirming the design approaches proposed in Sections 5.0 and 6.0 using DP-SC modules and extensively referenced in these LTR sections. However, although the LTR appears to indicate that conduct of those prototype tests have been completed, LTR Section 7.0 makes no reference to any approved controlled document of the NRIC Demonstration Program that provides the documented evidence of the Phase 1 prototype tests, results, and conclusions summarized in Section 7.0 and used to support the design approaches proposed in LTR Sections 5.0 and 6.0; the NRC staff needs this documentation to verify the stated testing and its conclusions to make its regulatory finding. GEH is requested to confirm such documentation currently exists, include reference to it in the LTR, and provide on the docket such approved documentation from the NRIC Demonstration Program.
- 2. [Acceptance Review Item] LTR Section 7 does not address or provide technical justification for impact of potential scaling effects (e.g., size effects on structural behavior for certain limit states seen in reinforced concrete) or lack thereof regarding the direct applicability of the results of NRIC scaled testing being used as a technical basis for the design of full-scale Diaphragm Plate Steel-Plate Composite (DPSC) structures for BWRX-300. GEH is requested to provide such critical discussion and technical justification related to impact of potential scaling effects on structural behavior.
- 3. [Acceptance Review Item] LTR Section 3.4 Steel-plate Composite Structures, states in part on page 49: As shown in Figure 3-6(b), DP-SC modules can be built by welding a series of components. The Item (C) welded single web U-shape is different than the Item (A) Double web bi-shape components and Item (B) Single web I-shape components, as shown in in Figure 3-6(b), Different Configurations of Steel-Plate Composite Structural Modules, and Figure 3-7, Diaphragm Plate Steel-Plate Composite Module System, and as described in Section 3.4, Steel-Plate Composite Structures, of the LTR. The LTR does not address potential differences in behavior of these configurations under load. GEH is requested to provide technical justification(s) that these different configurations would behave in the same manner under loading conditions.
- 4. [Acceptance Review Item] Reference 9-63 ACI 349.4R, Revision 4, Report on the Design for Impactive and Impulsive Loads for Nuclear Safety Related Structures, American Concrete Institute, appears to be a technical report that has not yet been published by ACI, but is referenced in LTR Section 5.8.1.3. It appears that Revision 1 thru 3 of the ACI 349.4R standard also do not exist; it appears to be a proposed new standard. If need to be used, GEH is requested to provide the published document. If only awaiting publication, please provide, on the docket, the documented evidence that it has been balloted and approved through all cognizant ACI committees.
Hearing Identifier:
GEH_BWRX300_Docs_Public Email Number:
24 Mail Envelope Properties (DM6PR09MB54169BBDC143600113A5FDB9F912A)
Subject:
FW Acceptance Review Observations to GEH for the Containment and Reactor Building Structural Design LTR Sent Date:
8/9/2023 2:10:27 PM Received Date:
8/9/2023 2:10:32 PM From:
Jordan Glisan Created By:
Jordan.Glisan@nrc.gov Recipients:
"Jim Shea" <James.Shea@nrc.gov>
Tracking Status: None "GEH-BWRX-300DocsPEm Resource" <GEH-BWRX-300DocsPEm.Resource@usnrc.onmicrosoft.com>
Tracking Status: None Post Office: