Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135G128 + (Forwards Rev 9 to Certificate of Compliance 9094 for Model CNS 14-195-H)
- ML20135G197 + (Forwards Rev 9 to Certificate of Compliance 9096 for Model CNS 21-300)
- ML20135G198 + (Forwards Rev 9 to Certificate of Compliance 9096 for Model CNS 21-300)
- LIC-96-0056, Forwards Rev 9 to Core Operating Limit Rept, Adding Figure to COLR for Axial Power Distribution LSSS for 4 Pump Operation. Error Corrected as Documentable Error Change & Revs Made to Remainder of Procedure + (Forwards Rev 9 to Core Operating Limit Rept, Adding Figure to COLR for Axial Power Distribution LSSS for 4 Pump Operation. Error Corrected as Documentable Error Change & Revs Made to Remainder of Procedure)
- LIC-95-0208, Forwards Rev 9 to Core Operating Limits Rept + (Forwards Rev 9 to Core Operating Limits Rept)
- ML15224A265 + (Forwards Rev 9 to Corporate Process Control Program Manual)
- ML13324A914 + (Forwards Rev 9 to Description of Progress on Selected Ongoing Regulatory Projects at Facility,Including long-term Svc Seismic Upgrading,Fire Protection,Tdi Diesel Generators & Environ Qualification)
- ML20096F186 + (Forwards Rev 9 to EPIP-4.06, Personnel Monitoring & Decontamination & Rev 18 to NAPS Emergency Plan)
- ML20202E521 + (Forwards Rev 9 to Emergency Mgt Basic Plan for Matagorda County,Bay City & Palacios, Rev 8 to Emergency Mgt Plan Annex W Radiological Emergency Preparedness (REP) Plan & Revs 3 & 4 to Emergency Mgt Plan Annex W Procedures)
- ML20027A557 + (Forwards Rev 9 to Emergency Plan Manual for Subj Facil to to Replace Outdated Pages of Manual)
- ML20247G065 + (Forwards Rev 9 to Emergency Plan,Incorporating Plume Exposure Pathway/Evacuation Zones,Reformat Stated Tables, Update Organizational Changes & Correcting Typos)
- ML17305A418 + (Forwards Rev 9 to Emergency Plan,Per 10CFR50.54 (Q).Change Does Not Decrease Emergency Plan Effectiveness & Plan Will Continue to Meet Stds in 10CFR50.47 (B) & 10CFR50,App E Requirements.W/O Encl)
- ML20138J515 + (Forwards Rev 9 to Emergency Plan,Revising Listed Sections. Questions Generated in Emergency Preparedness Appraisal During Wk of 850812 Addressed.Next Rev Will Be Submitted on 851115)
- RBG-38830, Forwards Rev 9 to Emergency Plan.Rev Required Due to Changes to EIP-2-001, Classification of Emergencies + (Forwards Rev 9 to Emergency Plan.Rev Required Due to Changes to EIP-2-001, Classification of Emergencies)
- ML20196H237 + (Forwards Rev 9 to Emergency Preparedness Plan for BVPS, IAW 10CFR50.4.Changes Do Not Decrease Effectiveness of Plan & Continues to Meet Requirements of App E of 10CFR50)
- ML20081D127 + (Forwards Rev 9 to Emergency Response Plan Implementing Procedure ERPIP-5.0, Preparation & Control of Emergency Response)
- ML20127M340 + (Forwards Rev 9 to Environ Rept, Being Made to Correspond to Info Provided in Re Radiological Impacts of Facility,Environ Sampling & Monitoring Programs for Claiborne Enrichment Ctr)
- ML20092G093 + (Forwards Rev 9 to FSAR for Univ of Fl Training Reactor)
- NRC-99-0052, Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions + (Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions)
- NRC-93-0042, Forwards Rev 9 to Fermi 2 Security Personnel Training & Qualification Plan,Per 10CFR50.54(f)(2).Rev Changes Table of Contents & Definition of Annual to Allow for Extensions of Required Training.W/O Encl + (Forwards Rev 9 to Fermi 2 Security Personnel Training & Qualification Plan,Per 10CFR50.54(f)(2).Rev Changes Table of Contents & Definition of Annual to Allow for Extensions of Required Training.W/O Encl)
- NRC-99-0037, Forwards Rev 9 to Fermi 2 Ufsar,Per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of Changes to QA Program & Vol 1 of Technical Requirements Manual,Encl + (Forwards Rev 9 to Fermi 2 Ufsar,Per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of Changes to QA Program & Vol 1 of Technical Requirements Manual,Encl)
- ML20083Q603 + (Forwards Rev 9 to Fire Protection Evaluation-Fire Hazards Analysis Rept, Per 821118 Commitment)
- AECM-90-0106, Forwards Rev 9 to GGNS-TOP-1A, Operational QA Manual, for Evaluation + (Forwards Rev 9 to GGNS-TOP-1A, Operational QA Manual, for Evaluation)
- ML20101L493 + (Forwards Rev 9 to General Ofc Emergency Implementing Procedure GO-EIP-111, Corporate Activation & Notification Procedures. Requests Document Transmittal Ack Form Be Signed & Returned)
- ML20066K810 + (Forwards Rev 9 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21))
- GO2-91-176, Forwards Rev 9 to Guard Training & Qualification Plan.Rev Withheld + (Forwards Rev 9 to Guard Training & Qualification Plan.Rev Withheld)
- ML20141F832 + (Forwards Rev 9 to IST Plan for Pumps & Valves First Interval, Which Implements Same Requirements from ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition of Section XI on Units 1 & 2)
- ML20141F835 + (Forwards Rev 9 to IST Plan for Pumps & Valves First Interval, Which Implements Same Requirements from ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition of Section XI on Units 1 & 2)
- ML20062G265 + (Forwards Rev 9 to Indus Security Plan,AD1808.00,reflecting Changes in Eeoc Educational Guidelines.Encl W/Held Pursuant to 2.790)
- ML20215N425 + (Forwards Rev 9 to Industrial Security Manual & Rev 6 to Security Force Training & Qualifications Manual,Per 10CFR50.54(p).Revs Withheld (Ref 10CFR73.21))
- ML20140D814 + (Forwards Rev 9 to Industrial Security Plan.Rev Withheld (Ref 10CFR2.790 & 73.21))
- ML20140D724 + (Forwards Rev 9 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21 & 2.790))
- ML20043G566 + (Forwards Rev 9 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21))
- 0CAN118501, Forwards Rev 9 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21) + (Forwards Rev 9 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML20235A243 + (Forwards Rev 9 to Inservice Insp Program,Consisting of Description,Program & Exam Schedule.Rept Submitted Due to Facility Mods & NRC Approval of Amend 99 to Facility Tech Specs.W/57 Oversize Drawings.Fee Paid)
- ML20236F735 + (Forwards Rev 9 to Inservice Testing Program,Callaway Nuclear Plant & Description of Changes.Changes Will Be Implemented During Refueling Outage II)
- ML20151M782 + (Forwards Rev 9 to Inservice Testing Program,Vermont Yankee, Including Description,Program,Testing Schedules & Relief Requests,Per 10CFR50.55a(g)(5).Rev Necessary to Incorporate Commitments Made in .Fee Paid)
- ML20006D339 + (Forwards Rev 9 to Issue 4 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(d) & 73.21))
- JAFP-95-0483, Forwards Rev 9 to Ja Fitzpatrick Nuclear Power Plant IST Program for Pumps & Valves Second Interval + (Forwards Rev 9 to Ja Fitzpatrick Nuclear Power Plant IST Program for Pumps & Valves Second Interval)
- ML20134G558 + (Forwards Rev 9 to MCEI-0400-47, McGuire Unit 2,Cycle 11 COLR, for Oct 1996)
- ML20134G561 + (Forwards Rev 9 to MCEI-0400-47, McGuire Unit 2,Cycle 11 COLR, for Oct 1996)
- ML20095J353 + (Forwards Rev 9 to McGuire Unit 1 Cycle 11,Core Operating Limits Rept, for Dec 1995)
- B10675, Forwards Rev 9 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR2.790 & 73.21(b)) + (Forwards Rev 9 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR2.790 & 73.21(b)))
- ML18038A360 + (Forwards Rev 9 to Nine Mile Point Nuclear Station Unit 1 FSAR (Updated), Vol I & Rev 2 to Nine Mile Point Nuclear Station Unit 1 Fire Hazards Analysis. Annual Safety Evaluation Summary Rept Also Encl)
- ELV-05100, Forwards Rev 9 to Nuclear Security Training & Qualification Plan,Deleting Training Requirement to React to Direct Fire Weapons.Rev Withheld + (Forwards Rev 9 to Nuclear Security Training & Qualification Plan,Deleting Training Requirement to React to Direct Fire Weapons.Rev Withheld)
- ML20092K678 + (Forwards Rev 9 to Offsite Dose Calculation Manual)
- ML20211K659 + (Forwards Rev 9 to Operating QA Manual for Review.Operating QA Manual Revised to Incorporate Clarification to Operating QA Program.W/O Encl)
- ML20101P149 + (Forwards Rev 9 to Oyster Creek Nuclear Generating Station Pump & Valve IST Program, Allowing Continuity Between Testing Performed to Meet Requirements of IST Program & 10CFR50,App J,Option B)
- ML20134K240 + (Forwards Rev 9 to PBAPS Physical Security Plan & Safeguards Contingency Plan.Rev Withheld)
- ML20082D931 + (Forwards Rev 9 to Peach Bottom Atomic Power Station Units 2 & 3 Updated FSAR & Rev 4 to Fire Protection Plan)
- ML17346A811 + (Forwards Rev 9 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))