Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Rev 9 to Guard Training & Qualification Plan.Rev Withheld". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20141F832  + (Forwards Rev 9 to IST Plan for Pumps & Valves First Interval, Which Implements Same Requirements from ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition of Section XI on Units 1 & 2)
  • ML20141F835  + (Forwards Rev 9 to IST Plan for Pumps & Valves First Interval, Which Implements Same Requirements from ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition of Section XI on Units 1 & 2)
  • ML20062G265  + (Forwards Rev 9 to Indus Security Plan,AD1808.00,reflecting Changes in Eeoc Educational Guidelines.Encl W/Held Pursuant to 2.790)
  • ML20215N425  + (Forwards Rev 9 to Industrial Security Manual & Rev 6 to Security Force Training & Qualifications Manual,Per 10CFR50.54(p).Revs Withheld (Ref 10CFR73.21))
  • ML20140D814  + (Forwards Rev 9 to Industrial Security Plan.Rev Withheld (Ref 10CFR2.790 & 73.21))
  • ML20140D724  + (Forwards Rev 9 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21 & 2.790))
  • ML20043G566  + (Forwards Rev 9 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21))
  • 0CAN118501, Forwards Rev 9 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21)  + (Forwards Rev 9 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21))
  • ML20235A243  + (Forwards Rev 9 to Inservice Insp Program,Consisting of Description,Program & Exam Schedule.Rept Submitted Due to Facility Mods & NRC Approval of Amend 99 to Facility Tech Specs.W/57 Oversize Drawings.Fee Paid)
  • ML20236F735  + (Forwards Rev 9 to Inservice Testing Program,Callaway Nuclear Plant & Description of Changes.Changes Will Be Implemented During Refueling Outage II)
  • ML20151M782  + (Forwards Rev 9 to Inservice Testing Program,Vermont Yankee, Including Description,Program,Testing Schedules & Relief Requests,Per 10CFR50.55a(g)(5).Rev Necessary to Incorporate Commitments Made in .Fee Paid)
  • ML20006D339  + (Forwards Rev 9 to Issue 4 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(d) & 73.21))
  • JAFP-95-0483, Forwards Rev 9 to Ja Fitzpatrick Nuclear Power Plant IST Program for Pumps & Valves Second Interval  + (Forwards Rev 9 to Ja Fitzpatrick Nuclear Power Plant IST Program for Pumps & Valves Second Interval)
  • ML20134G558  + (Forwards Rev 9 to MCEI-0400-47, McGuire Unit 2,Cycle 11 COLR, for Oct 1996)
  • ML20134G561  + (Forwards Rev 9 to MCEI-0400-47, McGuire Unit 2,Cycle 11 COLR, for Oct 1996)
  • ML20095J353  + (Forwards Rev 9 to McGuire Unit 1 Cycle 11,Core Operating Limits Rept, for Dec 1995)
  • B10675, Forwards Rev 9 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR2.790 & 73.21(b))  + (Forwards Rev 9 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR2.790 & 73.21(b)))
  • ML18038A360  + (Forwards Rev 9 to Nine Mile Point Nuclear Station Unit 1 FSAR (Updated), Vol I & Rev 2 to Nine Mile Point Nuclear Station Unit 1 Fire Hazards Analysis. Annual Safety Evaluation Summary Rept Also Encl)
  • ELV-05100, Forwards Rev 9 to Nuclear Security Training & Qualification Plan,Deleting Training Requirement to React to Direct Fire Weapons.Rev Withheld  + (Forwards Rev 9 to Nuclear Security Training & Qualification Plan,Deleting Training Requirement to React to Direct Fire Weapons.Rev Withheld)
  • ML20092K678  + (Forwards Rev 9 to Offsite Dose Calculation Manual)
  • ML20211K659  + (Forwards Rev 9 to Operating QA Manual for Review.Operating QA Manual Revised to Incorporate Clarification to Operating QA Program.W/O Encl)
  • ML20101P149  + (Forwards Rev 9 to Oyster Creek Nuclear Generating Station Pump & Valve IST Program, Allowing Continuity Between Testing Performed to Meet Requirements of IST Program & 10CFR50,App J,Option B)
  • ML20134K240  + (Forwards Rev 9 to PBAPS Physical Security Plan & Safeguards Contingency Plan.Rev Withheld)
  • ML20082D931  + (Forwards Rev 9 to Peach Bottom Atomic Power Station Units 2 & 3 Updated FSAR & Rev 4 to Fire Protection Plan)
  • ML17346A811  + (Forwards Rev 9 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))