ML20101L493

From kanterella
Jump to navigation Jump to search
Forwards Rev 9 to General Ofc Emergency Implementing Procedure GO-EIP-111, Corporate Activation & Notification Procedures. Requests Document Transmittal Ack Form Be Signed & Returned
ML20101L493
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/27/1984
From: Mudd C
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
Shared Package
ML20101L496 List:
References
NUDOCS 8501020248
Download: ML20101L493 (1)


Text

-

Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham. Alabama 35291 Telephone 205 250-1000

/\\lahallla Power

.,a.

December 27, 1984 Docket No. 50-348 Docket No. 50-364 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

Enclosed in accordance with 10CFR50, Appendix E reouirements are two copies of General Office Emeroency Implementino Procedure G0-EIP-111. Also enclosed is a Document Transmittal Acknowledgment Form which we reauest that you sign and return so that we may verify your receipt of these documents in accordance with our document control procedures.

If you have any auestions, please advise.

Yours very truly, NOW b ke%

M

% C. H. Mudd, Jr.

CHMJ r:rgs

Enclosures:

G0-ETP-111 Receipt Acknowledgment xc:

Mr. K. W. McCracken Mr. C. H. Mudd, J r.

File A-27.9.1 i

8501020248 841227 k

I

}

PDR ADOCK 05000348 F

PDR L