Forwards Rev 9 to Inservice Testing Program,Callaway Nuclear Plant & Description of Changes.Changes Will Be Implemented During Refueling Outage II
ML20236F735
Person / Time
Site: Callaway Ameren icon.png
Issue date: 07/28/1987
From: Schnell D
UNION ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20236F738 List:
References
ULNRC-1560, NUDOCS 8708040014
Download: ML20236F735 (4)


Text

I(hI

{

= Etscriac s

1901 Gratrot Street, St. Lou:s Donald F. Schnell Vice President July 28, 1987 U.S.

Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

ULNRC-156 0 DOCKET NUMBER 50-483 CALLAWAY PLANT CALLAWAY PUMP AND VALVE INSERVICE TESTING PROGRAM REFS:

1) ULNRC-738 dated January 31, 1984
2) ULNRC-833 dated May 29, 1984
3) ULNRC-1039 dated February 11, 1985
4) ULNRC-1127 dated June 28, 1965
5) ULNRC-1152 dated August 9, 1985
6) ULNRC-1267 dated March 4, 1986
7) P.W.

O' Conner letter to D.

F.

Schnell dated July 10, 1986

8) ULNRC-1426 dated January 14, 1987
9) ULNRC-1484 dated April 14, 1987 Reference 1 transmitted the Callaway Pump and Valve Inservice Testing Program.

References 2 through 6 and 8 and 9 transmitted updates to this same program.

Included as an attachment to this letter is a further update to the Callaway Testing Program. is a brief i

description of the changes and Attachment 2 contains a copy of l

revised pages which should be inserted into the existing program.

The changes to testing resulting from these program changes will f

begin to be implemented during the Refuel II Outage.

]

If you have any additional questions, please contact me.

l Very truly yours, Donald F.

Schnell JMC/ tar Attachments 8708040014 870728 PDR ADOCK 05000483

- Ok P

pan i\\

Maihng Address: P.O Box 149. St. ' outs, MO 63166

4.

cc:

Gerald Charnoff, Esq.

Shaw, Pittman, Potts & Trowbridge 2300 N.

Street, N.W.

Washington, D.C.

20037

)

. Dr.

J. O. Cermak CFA, Inc.

i 4 Professional Drive (Suite 110)

Gaithersburg, MD 20879 W. L. Forney Chief, Reactor Project Branch 1 U.S. Nuclear Regulatory Commission j

Region.III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Bruce Little Callaway Pesident Office U.S.

Nuclear Regulatory Commission RR$1 Steedman, Missouri 65077 Tom Alexion (2)

Office of Nuclear Reactor Regulation

-J U.S.

Nuclear Regulatory Commission Mail Stop 316 7920 Norfolk Avenue Bethesda, MD 20014 Manager, Electric Department Missouri Public Service Commission P.O. Box 360 Jetferson City, MO 65102 I

}

l q

b

1 l

l k

i l

I l

~l bec:

3456-0021.6

{

l Nuclear Date DFS/ Chrono l

D.

F. Schnell

)

J.

E. Birk

{

l J.

F. McLaughlin l

]

l A.

P.

Neuhalfen l

R. J.'Schukai 1

M. A.

Stiller l

G.'L.

Randolph D. E. Shain l

H. Wuertenbaecher D. W. Capone A. C.

Passwater l

R.

P. Wendling l

T. H. McFarland l

R.

D. Affolter l

D.

E.

Shafer l

D.

J. Walker i

O. Maynard (WCNOC) l N.

P. Goel (Bechtel)

G56.37 (CA-460 )

Compliance (J. E. Davis)

NSRB (Sandra Auston) i l

i 1

i i

. _ _ _ _ - _ _ _ _ - - - _ ~

1 i

5 Page 1 of 1 CHANGES TO CALLAWAY NUCLEAR PLANT INSERVICE TESTING PROGRAM Item 1:

Change: Delete Relief Request AL-2 Basis for Change:

It has been determined that a quarterly mechanical exercise of the valves while monitoring the required opening torque is a sufficient test to prove operability. This I

is clearly stated in ASME Section XI IWV-3522.

1 Item 2:

Change: Revise Relief Request AE-1 to allow the option of representative disassembly or seat leak testing valves AE-V-120,121,122,123 as an alternate testing method.

l Bauts for Change:

Seat leakage tests are being developed to test these valves.

Disassembly should remain as an option in the event that seat leak testing is deemed infeasible.

Item 3:

Change: Add EJ-5 to Relief Request column for valve EJ-HV-8840.

Basis for Change:

Relief Request designator was inadvertently omitted during the last program revision.

3 Item 4:

Change: Revise Relief Request Pol to increase the discharge pressure gage tolerance from ! 5 psig to i 10 psig.

Basis for Change: The gage manufacturer lists a higher i

minimum tolerance level than the 2 5 psig limit stated in Relief Request P01.

The new t 10 psig tolerance is consistent with the manufacturer specifications and still meets the 2% accuracy limit specified by i

ASME Section XI Table IWP-4110-1.

Item 5:

Change: Delete valves EM-HV-8870A,B and EM-HV-8883 from Inservice Testing Program.

Basis for Change: These valves were inadvertently added to the program in the last revision; these valves are not required to be tested.

Item 6:

Change: Add Relief Request EM-7 to program.

Basis for Change:

Relief Request EM-7 was inadvertently omitted at the. previous revision.

j