LIC-95-0208, Forwards Rev 9 to Core Operating Limits Rept
| ML20094D287 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 10/27/1995 |
| From: | Tira Patterson OMAHA PUBLIC POWER DISTRICT |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20094D291 | List: |
| References | |
| LIC-95-0208, LIC-95-208, NUDOCS 9511030258 | |
| Download: ML20094D287 (1) | |
Text
,
Omaha Public Power District P.O. Box 399 Hwy. 75 North of Ft. Calhoun Fort Calhoun, NE 680234399 402/636-2000 October 27, 1995 LIC-95-0208 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Hail Station Pl-137 Washington, DC 20555
Reference:
Docket No. 50-285
SUBJECT:
Transmittal of Fort Calhoun Station Core Operating Limit Report (COLR) - Revision 9 In accordance with Fort Calhoun Station (FCS) Technical Specification 5.9.5, attached is a revision to the FCS COLR. Revision 9, dated October 6, 1995, added text and a figure associated with Axial Power Distribution.
Please contact me if you have any questions.
Sincerely,
{uJ T. L. Patterson Division Manager Nuclear Operations TLP/ tem Attachment c:
Winston & Strawn (w/o attachment)
L. J. Callan, NRC Regional Administrator, Region IV W. C. Walker, NRC Senior Resident Inspector L. R. Wharton, NRC Project Manager d0 03005i s\\
i 9511030258 951027
.33,3 PDR ADOCK 05000285 P
. _ _.