Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196J431 + (Forwards Rev 16 to Ford Nuclear Reactor Emergency Plan. Rev Corrects Various Minor Typos & Revised Significant Radiation Exposures to Reflect Current 10CFR20 Guidance as Listed)
- LIC-98-0023, Forwards Rev 16 to Fort Calhoun Station Site Security Plan. Plan Withheld + (Forwards Rev 16 to Fort Calhoun Station Site Security Plan. Plan Withheld)
- ML20195F404 + (Forwards Rev 16 to GGNS-TOP-1A, Operational QA Manual (Oqam). Changes Reflect Various Organizational Changes. Operational QA Manual Change Specifics & Basis for Conclusion as Required by 10CFR50.54(a)(3)(ii))
- L-93-305, Forwards Rev 16 to Guard Training & Qualification Plan.W/O Encl + (Forwards Rev 16 to Guard Training & Qualification Plan.W/O Encl)
- ML20245F348 + (Forwards Rev 16 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21))
- 0CAN078911, Forwards Rev 16 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21) + (Forwards Rev 16 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML20034J010 + (Forwards Rev 16 to Industrial Security Plan.Rev Incorporates Changes Associated W/Physical Barrier Design Description & Details Exceptions,As Exceptions Exist.Rev Withheld (Ref 10CFR73.21))
- ML20127F906 + (Forwards Rev 16 to Issue 4 of Bvps,Units 1 & 2 Physical Security Plan Per 10CFR50.54(p).Plan Withheld Per 10CFR73.21)
- ML20249C701 + (Forwards Rev 16 to MCEI-0400-46, McGuire Unit 1 Cycle 13 COLR, Per TS Section 6.9.1.9)
- ML20205T103 + (Forwards Rev 16 to McGuire Unit 2 Cycle 13 Colr)
- BECO-85-097, Forwards Rev 16 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR73.21) + (Forwards Rev 16 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML20078S152 + (Forwards Rev 16 to North Anna Power Station Emergency Plan & Revised Epips,Including Rev 14 to EPIP-4.01,rev 9 to EPIP-4.02,rev 9 to EPIP-4.04 & Rev 12 to EPIP-4.23)
- ML20118B627 + (Forwards Rev 16 to Nuclear Security Personnel Training & Qualification Plan.Rev Withheld)
- ML20214Q893 + (Forwards Rev 16 to Offsite Dose Calculation Manual, Changing EMF Setpoint Info & Adding EMF Location Figures.Rev Effective on 870515)
- ML20045C102 + (Forwards Rev 16 to Operating QA Manual)
- ML20215M316 + (Forwards Rev 16 to Organization Plan,Incorporating Util Reorganization Effective 870601.Reorganization Has No Direct Impact on clean-up Operations at Plant.Description of Each Div W/Revised Functional Responsibilities Provided.Fee Paid)
- ML20059G951 + (Forwards Rev 16 to PGE-8010, Trojan Nuclear Plant Nuclear QA Program)
- ML20154M872 + (Forwards Rev 16 to Physical Security Plan.Rev 16,w/Apps B & C,Submitted Under Separate Cover.Rev Withheld (Ref 10CFR73.21 & 2.790))
- ML20116L785 + (Forwards Rev 16 to Physical Security Plan,Rev 5 to Safeguards Contingency Plan & Rev 8 to Security Training & Qualification Plan.Encls Withheld (Ref 10CFR73.21))
- DCL-89-042, Forwards Rev 16 to Physical Security Plan,Per NRC .Rev Withheld (Ref 10CFR73.21) + (Forwards Rev 16 to Physical Security Plan,Per NRC .Rev Withheld (Ref 10CFR73.21))
- L-89-116, Forwards Rev 16 to Physical Security Plan,Addressing NRC Comments on Rev 15 W/Exception of Changes Made to Surveillance Frequencies in App a of Plan.Rev Withheld (Ref 10CFR73.21 & 2.790(a)(3)) + (Forwards Rev 16 to Physical Security Plan,Addressing NRC Comments on Rev 15 W/Exception of Changes Made to Surveillance Frequencies in App a of Plan.Rev Withheld (Ref 10CFR73.21 & 2.790(a)(3)))
- L-88-352, Forwards Rev 16 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790 & 73.21) + (Forwards Rev 16 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790 & 73.21))
- U-602248, Forwards Rev 16 to Physical Security Plan.Rev Withheld Per 10CFR73.21(c)(2) + (Forwards Rev 16 to Physical Security Plan.Rev Withheld Per 10CFR73.21(c)(2))
- ML20137X111 + (Forwards Rev 16 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21 & 2.790))
- ML20237C954 + (Forwards Rev 16 to Physical Security Plan,Incorporating Textual Changes from Continuing Review & Updating of Plan. Rev Withheld (Ref 10CFR73.21))
- NRC-90-0188, Forwards Rev 16 to Physical Security Plan.Plan Withheld + (Forwards Rev 16 to Physical Security Plan.Plan Withheld)
- ML20106E273 + (Forwards Rev 16 to Physical Security Plan.Rev Withheld)
- ML20154F007 + (Forwards Rev 16 to Physical Security Plan.Rev Withheld)
- DCL-88-051, Forwards Rev 16 to Physical Security Plan.Rev Withheld + (Forwards Rev 16 to Physical Security Plan.Rev Withheld)
- ML20079C891 + (Forwards Rev 16 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- ST-HL-AE-3458, Forwards Rev 16 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) + (Forwards Rev 16 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML20094F836 + (Forwards Rev 16 to Pilgrim Nuclear Power Station Emergency Plan & Revised EPIPs)
- ML17334B705 + (Forwards Rev 16 to Plant Emergency Plan,Incorporating Changes Related to Relocation of Emergency Operations Facility from St Joseph District Svc Center in Benton Township,Mi to Buchanan,Mi)
- ML20207C070 + (Forwards Rev 16 to Prairie Island Nuclear Generating Plan Usar,Per 10CFR50.71(e).Rev 12 of Fire Hazards Analysis,Encl, Which Satisfies Commitment Made in Licensee to Nrc.Revised USAR Sent Under Separate Cover)
- ML20207C097 + (Forwards Rev 16 to Prairie Island Nuclear Generating Plant Usar,Per 10CFR50.71(e).Rev 12 to Fire Hazards Analysis,Encl, Which Satisfies Commitment Made in Licensee to Nrc.Fire Hazards Analysis Sent Under Separate Cover)
- ML20138J109 + (Forwards Rev 16 to Procedure 116, Surveillance Test Program, in Response to SEP Integrated Plant Safety Assessment Rept (NUREG-0822),Section 4.26.2, Instrumentation for Reactor Trip Testing.)
- ML20138J106 + (Forwards Rev 16 to Procedure 116, Surveillance Test Program, in Response to SEP Integrated Plant Safety Assessment Rept (NUREG-0822),Section 4.26.2, Instrumentation for Reactor Trip Testing)
- 0CAN079301, Forwards Rev 16 to QA Manual Operations. Rev 16 Pertains Primarily to Organizational Changes & Changes to Reflect Current Practices in Implementing Requirements of Manual + (Forwards Rev 16 to QA Manual Operations. Rev 16 Pertains Primarily to Organizational Changes & Changes to Reflect Current Practices in Implementing Requirements of Manual)
- ML20084L379 + (Forwards Rev 16 to QA Program Manual for Midland Nuclear Plant. Rept Fulfills Commitment Made in)
- ML17262A281 + (Forwards Rev 16 to QA Program for Station Operation, Per 10CFR50.54.Rev Involves Changes in Mgt,Engineering & Production Organizations & Realignment of Nuclear Engineering Svcs Group)
- ML17262A282 + (Forwards Rev 16 to QA Program for Station Operation, Per 10CFR50.54.Rev Involves Changes in Mgt,Engineering & Production Organizations & Realignment of Nuclear Engineering Svcs Group)
- NRC-95-0132, Forwards Rev 16 to Radiological Emergency Response Preparedness (RERP) Plan, Including Changes from Rev 15 to RERP Plan.Rev 15 Not Issued Separately.Rev 15 Implemented by Incorporating Encl Rev 16 + (Forwards Rev 16 to Radiological Emergency Response Preparedness (RERP) Plan, Including Changes from Rev 15 to RERP Plan.Rev 15 Not Issued Separately.Rev 15 Implemented by Incorporating Encl Rev 16)
- ML20133K563 + (Forwards Rev 16 to Radiological Emergency Response Plan.Rev Will Be Included in First Annual Update of SAR)
- ML17219A372 + (Forwards Rev 16 to Radiological Emergency Plan.Rev Not Sent within 30 Days Required by Regulation Due to Administrative Error.Method Used to Track Implementation of Regulation Being Reviewed to Prevent Recurrence)
- ML20046C986 + (Forwards Rev 16 to Rept, Analysis of Hydrogen Control Measures at McGuire Station, Incorporating NRC 930526 SER Which Closes Subj Issue for Plants.Rept Also Applicable to Catawba Nuclear Station as Noted in Rev 9.W/o Rept)
- LR-N980049, Forwards Rev 16 to Salem Generating Station UFSAR IAW Requirements of 10CFR50.71(e).Rev Contains Identified Text, Table & Figure Changes Required to Reflect Plant Configuration as of 970731 + (Forwards Rev 16 to Salem Generating Station UFSAR IAW Requirements of 10CFR50.71(e).Rev Contains Identified Text, Table & Figure Changes Required to Reflect Plant Configuration as of 970731)
- ML20071K637 + (Forwards Rev 16 to Seabrook Station Radiological Emergency Plan & Rev 72 to Emergency Response Manual (Sser))
- ML20043A610 + (Forwards Rev 16 to Security Personnel Training & Qualification Plan.Rev Withheld (Ref 10CFR2.790))
- ML20078K903 + (Forwards Rev 16 to Security Personnel Training & Qualification Plan.Encl Withheld)
- ST-HL-AE-4941, Forwards Rev 16 to Security Personnel Training & Qualification Plan.Encl Withheld + (Forwards Rev 16 to Security Personnel Training & Qualification Plan.Encl Withheld)
- ML20237L295 + (Forwards Rev 16 to Security Plan,Addressing Deletions, Additions,Clarifications & Resolution of Items Between Region II & Util within Plan,Per 10CFR50.54(p).Rev Withheld (Ref 10CFR73.21))