o VIRGINIA ELECTRIC AND POWER COMPANY j
niennonn,VIHOINIA 20061 December 14, 1994 U.S. Nuclear Regalatory Commission Serial No.94-694 Attention: Document Control Desk NEP/SAH Washington, D.C. 20555 Docket Nos.
k 338 50-339 Gentlemen:
License Nos.
NPF-4 NPF-7 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 REylSIONS TO EMERGENCY PLAN REVISIONS TO EMERGENCY PLAN IMPLEMENTING PROCEDURES Pursuant to 10 CFR 50.54(q), enclosed are revisions to the North Anna Power Station Emergency Plan and selected Emergency Plan Implementing Procedures.
These revisions do not implement actions which decrease the effectiveness of our Emergency Plan. The Emergency Plan and implementing Procedures continue to meet the standards of 10 CFR 50.47(b). Please update your manuals by performing the actions described
'n Attachment 1, Tabulation of Changes.
Your attention is also directed to Attachment 2, North Anna Emergency Plan Revision 16 Summary. This information is being provided to facilitate your review of the enclosed Emergency Plan revision.
Very truly yours, James P. O'Hanlon Senior Vice President - Nuclear Encicsures cc:
U.S. Nuclear Regulatory Commission (2 copies) 101 Marietta Street, N.W.
Atlanta, GA 30323 Mr. R. D. McWhorter NRC Senior Resident inspector North Anna Power Station Oh
- a218asi
- aange F
Serial No.94-694 NAPS EPLAN/EPIP Revision ATTACHMENT 1 TABULATION OF CH/.NGES VIRGINIA ELECTRIC AND POWER COMPANY REVISIONS TG NORTH ANNA POWER STATION EMERGENCY PLAN AND EMERGENCY PLAN IMPLEMENTING PROCEDURES Enclosed are recent revisions to the North Anna Power Station Emergency Plan and selected Emergency Plan Implementing Procedures (EPIPs). Please take the following actions in order to keep your manual updated with the most recent revisions.
REMOVE AND DESTROY DATED INSERT EFFECTIVE DATE North Anna Power Station 01/01/94 North Anna Power Station 12/01/94 Emergency Plan, Rev.15 Emergency Plan, Rev.16 (entire document)
(entire document)
EPIP-4.01, Rev.13 01/01/94 EPIP-4.01, Rev.14 11/28/94 EPIP-4.02, Rev. 8 01/01/94 EPIP-4.02, Rev. 9 11/28/94 EPIP-4.04, Rev. 8 01/01/94 EPIP-4.04, Rev. 9 11/28/94 EPIP-4.23, Rev.11 12/23/92 EPlP-4.23, Rev.12 12/05/94 EPIP-5.05, Rev. 9 09/15/94 EPIP-5.05, Rev.10 11/2S/94 l
Emeraency Plan Priv? */ and Proprietary Material has been removed.
Reference Genenc Letter 140 R1 -27.
Serial No. 94494
)
NAPS EPLAN/EPIP Revision j
ATTACHMENT 2 NORTH ANNA EMERGENCY PLAN REVISION 16
SUMMARY
Page 1.2:
Deletes " biannual" and " biennial" as neither appear in the Plan.
Adds definition for Effective Date: Date of change; implementation date assigned by approval authority; date from which 30-day NRC submittals are required in accordance with 10 CFR 50, Appendix E.V.
Page 1.4:
Deletes " Unrestricted Area" as it is not used within the context of the Plan.
Page 1.6:
Deletes IEIN (no longer issued).
Page 1.7:
Corrects abbreviations for PMCL, RSCL.
Page 1.8:
Corrects abbreviation: " THY CDE - Thyroid Effective Dose" to Thyroid CDE -
Thyroid Dose Equivalent.
Pagc 2.4:
Changes "damtender" to " Spillway Attendant."
Page 5.37:
Corrects line diagram (to reflect teams reporting to Director level position instead of one another).
Page 6.4:
Section 6.3.1: Changes "value" to " threshold."
Page 6.5:
Updates Site Area Emergency dose thresholds to EPA-400 value of 100 mrem TEDE,500 mrem Thyroid CDE.
Page 6.7:
Note: This change implements corrective actione agreed upon between Virginia Power and the NRC, as specified by NRC letter titled " Revision 15 to Emergency Plan for North Anna Power Station, Docket Nos. 50-338 and 50-339," dated May 27,1994 (refer to NLP Serial # 94-355).
Changed to read, "Onsite personnel will be immediately notified of an emergency that is initially classified as an Alert or higher event, unless doing so poses a threat to personnel safety. For example, hurricane force winds, a tornado, or a security breach may dictate suspension or deferral of assembly, accountability and/or initiation of facility staffing. However, these activities would be implemented as quickly as achievable given the specific situation."
Note: The word " initially" was added following NRC correspondence. This change does not affect the commitment to insert modifications related to emergency assembly and accountability. Rather,
" initially" is inserted to underscore the intent to notify personnel at the onset of an emergency.
Page 1 of 3 i
- Page 6.13:
Table 6.1: Changes "Whole Body" to "TEDE" in center column.
Pgs. 7.7-9:
Updates descriptions of radio communications systems to reflect installation of newly installed radio trunking equipment.
1 Page 7.9:
Updates FTS-2000 abbreviations to reflect NRC Ge1eric Letter 91-14.
Changes to the same abbreviations also appear on pages 7.18 and 7.19.
- Page 7.12:
Third paragraph, last sentence: Change " monthly" to " quarterly." Refer to change on page 8.17 for additional information.
Page 7.22:
Defines unit of distance (miles).
l Corrects degrees for Frederick's Hall monitoring location (205).
e Page 8.6:
Deletes " approval date" and insert "the assigned effective date."
t Page 8.17:
Modifies Section 8.7. Testing and Maintenance of Emergency Equipment, to reflect VP-NRC submittal SN: 94-275, and subsequent NRC approval by i
letter dated October 3,1994 (NLP SN: 94-600). The shaded areas below indicate inserted text, while text lined through is deleted.
a)
The contents of the emergency kits dedicated for emergency use shall be inventoried merth!y yUkj@ and following gisji@ their i
uc0 during On Omerg0ncy.
b)
Dedicated emergency survey instrumentation shall be inventoried and operationally checked merth!y gUarte@ and following ' pch;U@
e Ony emerg^nej 70guir5g thd u00.
-Page 9.2:
Note: This change implements corrective actions agreed upon between Virginia Power and the NRC, as specified by NRC letter titled " Revision 15 to Emergency Plan for North Anna Power Station, Docket Nos. 50-338 and 50-339," dated May 27,1994 (refer to NLP Serial # 94-355). This change restores reference to CERP Recovery Organization.
Page 9.3:
Corrects abbreviation : Thyroid Committed Dose Equivalent (CDE).
Appx.10.1: Page 10.1.2: Updates Letters of Agreement listing (names / titles of Federal, State and local support agencies updated).
Updated LOAs are also inserted.
Appx.10.4: Deletes EPIP-3.01 (provisions incorporated into EPIP-5.09).
Appx.10.5: Pages 10.5.2 and 10.5.3: Change "Ultravue Respirators" to "" Full-face respirators, e.g., Ultravue or equivalent."
Page 2 of 3
Appx.10.11 Page 10.11.12, Alert initiating conditions 13 and 14: Sequence of these two
~
EALs has been reversed (interchanged) to be consistent with the ordering of EALs listed in Section 4 of the plan.-
. Appx.10.11 Page 10.11.13, Alert initiating condition 15:
Capitalize Main Steam High Range Monitor for consistency within o