ML20059G951

From kanterella
Jump to navigation Jump to search
Forwards Rev 16 to PGE-8010, Trojan Nuclear Plant Nuclear QA Program
ML20059G951
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 11/04/1993
From: Cross J
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20059G954 List:
References
NUDOCS 9311090204
Download: ML20059G951 (2)


Text

..

l M

Portland General ElectricCompany g

a E

James E. Cross Vice President and Chief Nuclear Officer November 4,1993 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555

Dear Sirs:

Portland General Electric (PGE) Nuclear Quality Assurance Program for Troian Nuclear Plant (PGE-8010. Revision 16)

This letter transmits PGE-8010, Revision 16, " Portland General Electric (PGE) Nuclear Quality _

Assurance Program for Trojan Nuclear Plant." This document replaces PGE-8010, Revision _15, in its entirety.

On July 6,1993, PGE submitted to the NRC a proposed revision to the Nuclear Quality -

Assurance (QA) Program for the Trojan Nuclear Plant. On September 28,1993, PGE resubmitted its proposed revision to the Nuclear QA Program for Trojan with changes as requested by NRC letter dated September 3,1993. These changes also reflected NRC comments conveyed during several discussions between PGE and the NRC. In a letter to PGE dated October 28,1993, the NRC approved the proposed revision to the Trojan QA Program, as submitted by PGE's September 28,1993 letter.

Enclosed with this letter is a copy of PGE-8010, Revision 16, " Portland General Electric (PGE)

Nuclear Quality Assurance Program for Trojan Nuclear Plant." This revision, which reflects changes appropriate for the permanently shutdown and defueled condition of the Trojan Nuclear Plant, continues to meet the requirements of 10 CFR 50, Appendix B.

Sincerely, i

AM S. M. Quennoz for J. E. Cross Enclosure 08^050 9311090204 931104 PDR ADOCK 05000344

@h P

PDR 1 S W Sa-ron St'eot. Pomand. Oregon 97204 (503)464-8897

' Document Control Desk November 4,1993 Pace 2 c:

Mr. Bobby H. Faulkenberry (Attn: Ms. Elizabeth Zimmerman)

Regional Administrator, Region V U. S. Nuclear Regulatory Commission Mr. Robert M. Bernero (w/o enclosure)

Director, Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington DC 20555 Mr. David Stewart-Smith State of Oregon Department of Energy Mr. James Melfi NRC Resident Inspector Trojan Nuclear Plant r