Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080H393 + (Forwards Rev 11 to Initial Test Program,Per FSAR Section 14.2.3 Re Testing Equipment Commitment Availability 60 Days Before Scheduled Fuel Load for Initial Startup Test.Rev Will Be Included in Next FSAR Update)
- 3F0890-03, Forwards Rev 11 to Inservice Insp - Pump & Valve Program, Crystal River Unit 3 + (Forwards Rev 11 to Inservice Insp - Pump & Valve Program, Crystal River Unit 3)
- ML20042F283 + (Forwards Rev 11 to Inservice Testing Program)
- ML20063H194 + (Forwards Rev 11 to Issue 2, Beaver Valley Unit 1 IST Program for Pumps & Valves)
- ML20069P536 + (Forwards Rev 11 to Issue 4 of Physical Security Plan,Per 10CFR50.54(p).Rev Withheld (Ref 10CFR2.790(d) & 10CFR73.21))
- ML20138A643 + (Forwards Rev 11 to LACBWR QA Program Description)
- ML20045F462 + (Forwards Rev 11 to Limerick Generating Station,Units 1 & 2 1993 QA Program Description Changes)
- ML20137N746 + (Forwards Rev 11 to Maine Yankee Operational Quality Assurance Program Which Reflects an Organizational Realignment of Key Nuclear Safety Functions at Plant)
- ML20137N751 + (Forwards Rev 11 to Maine Yankee Operational Quality Assurance Program Which Reflects an Organizational Realignment of Key Nuclear Safety Functions at Plant)
- ML20073P508 + (Forwards Rev 11 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML20073B980 + (Forwards Rev 11 to Natl Board Tasks Rept. Rept Tracks Progress on Concerns Raised by Natl Board Interim Repts 1 & 2,Suppls 2,3,5 & 7.W/o Stated Executive Summary)
- ML20140J440 + (Forwards Rev 11 to ODCM for Vogtle Electric Generating Plant. Effected Pages Only for Revs 10 & 11,both Made in 1996,previously Submitted as Attachment 1 to 1996 Annual Rept - Part 2,dtd 970428)
- ML20140J444 + (Forwards Rev 11 to ODCM for Vogtle Electric Generating Plant. Effected Pages Only for Revs 10 & 11,both Made in 1996,previously Submitted as Attachment 1 to 1996 Annual Rept - Part 2,dtd 970428)
- ML20097E954 + (Forwards Rev 11 to Operational QA Manual)
- ST-HL-AE-4948, Forwards Rev 11 to Operations QA Plan + (Forwards Rev 11 to Operations QA Plan)
- ML20212B557 + (Forwards Rev 11 to Oyster Creek Emergency Dose Calculation Manual, IAW 10CFR50,App E,Section V)
- ML20211D202 + (Forwards Rev 11 to PGE-8010, Portland General Electric Co Nuclear QA Program, Per 10CFR50.54(a)(3))
- ML20209G252 + (Forwards Rev 11 to Part I of GE Nuclear Fuel Mfg Dept Application Referenced in Condition 9 of License SNM-1097. Updated Index Pages for Part I & Part I Page W/Corrected Typos Also Encl)
- HNP-99-134, Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.21 + (Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.21)
- AECM-85-0057, Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790 & 10CFR9.5) + (Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790 & 10CFR9.5))
- ST-HL-AE-2553, Forwards Rev 11 to Physical Security Plan,Rev 11 to Training & Qualification Plan & Rev 7 to Contingency Plan.Plans Withheld + (Forwards Rev 11 to Physical Security Plan,Rev 11 to Training & Qualification Plan & Rev 7 to Contingency Plan.Plans Withheld)
- ML20214X035 + (Forwards Rev 11 to Physical Security Plan,Per Fr Notice of Rule Changes.Rev Withheld)
- ML19332D837 + (Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790 & 73.21))
- ML20195H835 + (Forwards Rev 11 to Physical Security Plan,Safeguards Contingency Plan & Security Training & Qualification Plan. Rev Withheld (Ref 10CFR73.21))
- FVY-85-123, Forwards Rev 11 to Physical Security Plan.Changes Made in Response to Stating That Portions of Change 10 Unacceptable Per 10CFR50.54(p).Rev Withheld (Ref 10CFR73.21) + (Forwards Rev 11 to Physical Security Plan.Changes Made in Response to Stating That Portions of Change 10 Unacceptable Per 10CFR50.54(p).Rev Withheld (Ref 10CFR73.21))
- ML20236D884 + (Forwards Rev 11 to Physical Security Plan,Per Requirements of 10CFR50.54(p).Rev Withheld (Ref 10CFR73.21))
- B13393, Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790) + (Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790))
- ML20055H583 + (Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML20136J109 + (Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML20212P137 + (Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- DCL-84-043, Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) + (Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- W3P90-1512, Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) + (Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML20214F235 + (Forwards Rev 11 to Plant Nuclear Security Personnel Training & Qualification Program,Per 10CFR50.54(p).Rev Withheld (Ref 10CFR73.21))
- ML20147C246 + (Forwards Rev 11 to Plant Radiological Emergency Response Plan,Merging Interim Emergency Operations Facility (EOF) & Corporate Emergency Organizations Into EOF Emergency Organization & Changing Emergency Action Levels)
- ML20217C182 + (Forwards Rev 11 to Plant Safeguards Contingency Plan.Rev Withheld (Ref 10CFR50.54(p)))
- ML20102B879 + (Forwards Rev 11 to QA Manual,Page II-18-1 Re Audits,Per Telcon Concerning Closeout of Open Item)
- ML20133F800 + (Forwards Rev 11 to QA Policy & Procedures Manual, in Response to Telcon & .Fee Paid)
- ML20134M242 + (Forwards Rev 11 to QA Program Description, Clarifying Section I, Organization Paragraph 7.d Revised to Assure Majority of SRC Members Be Degreed Individuals)
- ML20134M245 + (Forwards Rev 11 to QA Program Description, Clarifying Section I, Organization Paragraph 7.d Revised to Assure Majority of SRC Members Be Degreed Individuals)
- ML17254A712 + (Forwards Rev 11 to QA Program for Station Operation. Organization Changes & Responsibilities in Engineering Organization Discussed)
- ML17254A713 + (Forwards Rev 11 to QA Program for Station Operation. Organization Changes & Responsibilities in Engineering Organization Discussed)
- ML18095B029 + (Forwards Rev 11 to QA Program,Chapter 17.2 for Duane Arnold Energy Ctr)
- NG-90-2640, Forwards Rev 11 to QA Program,Chapter 17.2 for Duane Arnold Energy Ctr + (Forwards Rev 11 to QA Program,Chapter 17.2 for Duane Arnold Energy Ctr)
- ML20138B178 + (Forwards Rev 11 to QA Program.Rev Includes Statement That Nuclear Safety & Regulation Dept Reviews Safety Evaluations as Nuclear Operations Board Staff Function)
- ML20199E092 + (Forwards Rev 11 to QA-AD-001, Chem-Nuclear Sys QAP, for NRC Review & Approval)
- ML20150D209 + (Forwards Rev 11 to Radiological Emergency Response Plan Section M, Recovery & Reentry Planning & Post-Accident Operations)
- ML18026A954 + (Forwards Rev 11 to Radiological Emergency Plan & Revised Emergency Plan Implementing Procedures,Including Procedure IP-19 Re Emergency Data Info Sys)
- ML17309A563 + (Forwards Rev 11 to Re Ginna Nuclear Power Plant UFSAR, Reflecting Changes to Facility & Info & Analyses Submitted to NRC or Prepared Per NRC Requirements Since Last Annual Update Submitted 931216)
- ML20101H638 + (Forwards Rev 11 to Revised Inservice Testing Program for Cps)
- GO2-91-203, Forwards Rev 11 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21) + (Forwards Rev 11 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21))
- L-96-159, Forwards Rev 11 to Safeguards Contingency Plan.Encl Withheld (Ref 10CFR2.790(a)(3)) + (Forwards Rev 11 to Safeguards Contingency Plan.Encl Withheld (Ref 10CFR2.790(a)(3)))
- ML20012A153 + (Forwards Rev 11 to Safeguards Contingency Plan & Details of Changes Made by Rev.Encls Withheld (Ref 10CFR73.21))
- ML20079C699 + (Forwards Rev 11 to Safeguards Contingency Plan Including, Corporate Mgt & Station Security Organizational Changes & Update to Figure Cpcn 3.2-3 Depicting Site Layout.Rev Withheld (Ref 10CFR73.21))
- ML20102A688 + (Forwards Rev 11 to Section 0100 of Corporate Nuclear QA Program, Reflecting Organizational Changes)
- ML20090A838 + (Forwards Rev 11 to Section 4.0 of Inservice Testing (IST) Program Plan for Valves,Per NRC Transmitting SER for IST Program)