ML20045F462
| ML20045F462 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 07/01/1993 |
| From: | Hunger G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20045F467 | List: |
| References | |
| NUDOCS 9307070319 | |
| Download: ML20045F462 (2) | |
Text
PHILADELPHIA ELECTRIC COMPANY 10CFR50. 54 (a) (3)
NUCLEAR GROUP HEADQUARTERS 955-65 CHESTERBROOK BLVD.
WAYNE, PA 19087-5691 015) 640m July 1, 1993 STATION SUPPORT DEPARTMENT Docket Nos. 50 '52 50-353 P
License Nos. NPF-39 NPF-85 l
U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, DC 20555
SUBJECT:
Limerick Generating Station, Units 1 and 2 Submittal of the Annual Revision of the Quality Assurance Program Description
Dear Sirs:
In accordance with the requirements of 10CFR50.54 (a) (3) and 10CFR50. 4 (b) (7), this letter submits one original of the annual revision of the Quality Assurance (QA) Program Description.
As a result of the changes to 10CFR50.71(e), we have chosen to submit the next revision (i.e., Revision 3) of the Updated Final Safety Analysis Report (UFSAR) for Limerick Generating Station (LGS) Units 1 and 2,
in November of this year instead of the established annual submittal date of July 1, 1993.
We will be providing a subsequent revision of the QA Program Description (i.e.
Section 17.2 of the UFSAR) when we submit Revision 3 of the I4S UFSAR in November, 1993.
Future changes to the QA Program Description are expected to be provided with our periodic UFSAR revisions.
9307070319 930701 h
PDR ADOCK 05000352 p
PDR L
ObVlh
/'q F
'\\\\
U.S. Nuclear Regulatory Commission July 1, 1993 r
Docur.ent Control Desk Page 2 i
The enclosed revision of the LGS QA Program Description l
reflects editorial and organizational changes and those changes described in Attachment 1 as required by 10CFR50. 54 (a) (3 ) (ii).
Based on the information provided in Attachment 1,
we have concluded that the QA Program Description changes included in this revision have either been previously approved by the NRC or do not i
reduce the commitments in the QA Program Description previously accepted by the NRC.
If you have any questions or require further information, please contact us.
Sincerely,
?
GI.A. Nwu R ' yx' Attachment Enclosure cc:
T.
T. Martin, Administrator, Region I, USNRC (w/att/2 copies of enclosures)
N.
S.
Perry, USNRC Senior Resident Inspector, LGS j
(w/att/1 copy of encl) t l
i t
v l
i
.I