ML20063H194
| ML20063H194 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 02/02/1994 |
| From: | Sieber J DUQUESNE LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20063H198 | List: |
| References | |
| NUDOCS 9402170153 | |
| Download: ML20063H194 (4) | |
Text
_ _ _ _ _ _ _ _ -. _ _ _ - _ _ _ _ - _ - _ _ _ _ _ _ _ _.
g Beaver Valley Power Station Shippingport, PA 15077-0004 r
JOHN D. SiEBER (412) 393-5255 cnINuelea O cer February 2, 1994 Nuclear Power Dmston U.
S.
Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20u55
Subject:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Updated Inservice Testing Program, Issue 2, Revision 11 The purpose of this submittal is to provide the Nuclear Regulatory Commission (NRC) with an informational copy of revisions to the Beaver Valley Power Station Unit 1 (BVPS-1) Inservice Testing (IST) Program and to clarify the time interval for the IST Program.
Enclosure 1
provides a summary of the IST program chan,es which have bee: '1corporated into Revision 11.
Enclosure 2
is Issue 2,
Revision 11 of the BVPS-1 IST Program.
It has been determined that the IST program changes do not require NRC approval prior to implementation.
This determination was made i
because all of the changes are either:
j editorial in nature, or in compliance with the 1982 Edition through Summer 1983 Addenda of the ASME XI Code, or in compliance with the positions delineated in Attachment 1 of Generic Letter No.
89-04,
" Guidance on Developing Acceptable Inservice Testing Programs" On September 13, 1993, the NRC granted relief from certain ASME Ccde requirements (TAC No. M84412).
The Safety Evaluation stated in Section 2.0, Background, that the " Beaver Valley Power Station, Unit I
1, IST Program covers the se, and 10-year interval which commenced on October 1,
1986, and ends September 30, 1996.'
However, on April 28,
- 1986, the NRC granted an extension to the first 10-year interval such that the first interval ended on September 9.0, 1987 (TAC No. 60624).
Based on thic NRC approval, the second 10-year interval would end on September 19, 1997.
The current schedule is for the second interval to end September 19,
- 1997, and for the third 10-year interval to cover the period from September 20, 1997, through September 19, 2007.
.~>s hh 1.r>'OfG.tl 04 arcuuc UUU1Yof l1 t\\
gg y
9402170153 940202 L
ADOCK05000gg4 g
DR
Beaver Valley Power Station, Unit No. 1 Updated Inservice Testing Program, Issue 2, Revision 11 Page 2 If you have any questions regarding this submittal, please contact Steve Sovick at (412) 393-5211.
Sincerely,
(}
4 D.
Sieber Enclosures cc:
Mr.
L. W.
Rossbach, Sr. Resident Inspector Mr.
T. T. Martin, NRC Region I Administrator Mr.
G.
E.
Edison, Project Manager l
I l
l
ENCIOSURE 1
SUMMARY
OF OWKsES TO THE UNIT 1 IST PROGPAM (REV.11)
I) The follwing changes to ;he Unit 1 IST Pr@tmu incorporated Proposed Revision 1D-Revised, as approved by the NRC in the SER dated 9/13/93.
A) AMM Relief Request No.
11 to the " Pump Relief Request Section" to allw the use of a pump performance curve for the Ccruponent Coolirg Water pumps.
(pages 53 and 54)
B) Added the seven NRC-rm-srled " Guidelines for the Use and Development s
of Pump Curves" to the " Pump Testirq Requirenents Section". (page 4)
C) Added reference to Relief Request No. 11 to the Pump Outline Sheets for the CtInponent Cboling Water pumps.
(pages 26, 27 and 28) i II) The followirq charges made to the Unit 1 IST Pr%tma are in accordance with the ASME XI Code and Generic letter 89-04:
A) The Alternate Tbst method of Relief Request No. 20 for the accumulator discharge check valves,
[ISI-48, 49, 50, 51, 52, 53], was revised to delete reference to a non-intrusive test. The non-intrusive test was utilized duriry the first performance of the C or Ft. Calhoun test method during 9R to validate the method. It was not intended that a y
non-intrusive test be utilized in subsequent cutages.
The NRC i miM a letter on 2/8/93 granting approval to use the C test method.
The NRC stated, "When the final evaluation of the testing y
performed at Ft.
Calhoun Station is complete, the NRC will inform DIf if any changes in the testing, such as the use of nonintrusive techniques, are required for Code cx:rapliance." The NRC imiM a SER to Et.
Calhoun Nuclear Station concerniry their test method for the accumulator discharge check valves on 10/1/93. The NRC approved the test method but made a few rre_,
riations. Concerning non-intrusive s
- testing, "It is suggested that the use of non-intrusive ronitorirg be considered for confirmation of test results, at least occasionally."
Therefore deleting the reference that implies a non-intrusive test will be performed every time the C the NRC unde.% of this test method. test is performed is consistent with y
(page 168)
III) The following charges made to nature:
the Unit 1 IST Pr%tma are editorial in A)
Corrected the level gauge mark number used for suction pressure for
[101-P-2B]. (page 11)
B)
Cbrrected the conment for bearing temperature to referenm the motor bearire conputer points for [1SI-P-1A,1B].
(pages 14 and 15) i
ENCLOSURE 1 SIMRRY OF ORNGES TO 'IEE UNIT 1 IST PROGRAM (REV.11)
C) Corrected the discharge pressure gauge mark rumbers for [1QS-P-1A,1B].
(pages 16 ard 17)
D) Revised the MOP curves included in the "Punp Miniman Operating Point (IOP) Curves Section" for the AtF414a7 Feedwater pmps, had on the new engineering calculation 8700-24.46 Rev. 1.
(pages 41, 42 and 43),
E) ImbM a test number for the remote position verification of various valves with reach-rods.
(pages 65, 66, 67, 73, 86,119,125 and 126)
F) Deleted a ty~rapaphical error that aMari a ~ (R) frequency to various valves tested during cold shutdowns.
(pages 69, 90, 91 and 92)
G) Deleted the page number frm the IJ log for the reverse flow test of
[1FW-42, 43, 44).
(page 104)
H) Corrected the size of valves [1FP-800, 804] per TER 7771.
(page 117)