Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Request for Addl Info Required for Reviewing Application". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19331C002  + (Forwards Request for Addl Info Required to Complete Evaluation of Containment Purging During Normal Plant Operations.Arrangements Should Be Made for Submittal or Meeting in Bethesda,Md to Discuss NRC Concerns)
  • ML17249A780  + (Forwards Request for Addl Info Required for SEP Design Basis Events Analyses Review.Requests Response within 90 Days)
  • ML20028C013  + (Forwards Request for Addl Info Required to Complete Review of 820716 Revised Chapter 5 to Fundamental Nuclear Matl Control Plan)
  • ML19329A124  + (Forwards Request for Addl Info Required for Review of Amends to Licenses DPR-38,DPR-47 & DPR-55 Submitted by Util on 761013)
  • ML20027B712  + (Forwards Request for Addl Info Required to Resolve SER Confirmatory Issue 21 Re Development of Emergency Operating Procedures for Reanalysis of Transients & Accidents)
  • ML20137V728  + (Forwards Request for Addl Info Required to Complete Safety Review of 850801 Application for Receipt,Possession & Storage of Fresh Fuel Assemblies & Other SNM Required for Seabrook 1.Review Will Continue Upon Receipt of Info)
  • ML19253B659  + (Forwards Request for Addl Info Required for Review of Met Ed Request for Tech Spec Change Re Facility Reload)
  • ML19319A831  + (Forwards Request for Addl Info Required for Facility ECCS Analysis Review.Specific Areas of Concern Include Loop Analysis & Evaluation of Minimizing Potential for Excessive Chemical Concentration After LOCA)
  • ML20037B542  + (Forwards Request for Addl Info Required to Complete Review of ECCS Reanalysis)
  • ML19331B497  + (Forwards Request for Addl Info Required for Emergency Plan Approval.Provisions Should Be Provided by 800829)
  • ML20126B109  + (Forwards Request for Addl Info Required Prior to 850709-11 Site Visit to Perform Caseload Forecast.Info Required Prior to 850614)
  • ML19242D688  + (Forwards Request for Addl Info Required to Conduct Review of PGE-1020, Rept on Design Mods for Trojan Control Bldg)
  • ML19329C455  + (Forwards Request for Addl Info Required for Review of BAW-10105.Overall ECCS Break Spectrum Submittal Requirements Statement for All Applicants)
  • ML20213D019  + (Forwards Request for Addl Info Required to Complete First Round Questions for Evaluation of Licensees FSAR)
  • ML19305B032  + (Forwards Request for Addl Info Required to Continue Licensing Action Review.Schedule for Providing Addl Info Requested within 10 Days)
  • ML19345C150  + (Forwards Request for Addl Info Required to Complete NRC Evaluation of Application for Operating Licenses for Facilities.Response Should Be Submitted within 6 Wks)
  • ML17276A406  + (Forwards Request for Addl Info Required Per Generic Issues Branch License Application Review.Status of Unresolved Safety Issues & Summary of Relevant Programs & Interim Measures Taken Should Be Included.Response Due by 811229)
  • ML19339A182  + (Forwards Request for Addl Info Required to Complete Evaluation Re Application for Ols.Fsar Should Be Amended to Include Requested Info.Response Should Be Provided within 6 Wks)
  • ML19319A833  + (Forwards Request for Addl Info Required for Facility ECCS Analysis Review)
  • ML19316A633  + (Forwards Request for Addl Info Required from Util Re Initial Tests & Operation,Startup Rept Submittal,Tech Specs & Conduct of Operations for FSAR Review)
  • ML19322C118  + (Forwards Request for Addl Info Required from Util Re Gaseous Effluent Release Points & Meterological Measurements Program)
  • ML20206H800  + (Forwards Request for Addl Info Required to Complete Review of Site Stablilzation Plan.Site Visit Requested 2 Wks After Receipt of Response)
  • ML20039C606  + (Forwards Request for Addl Info Required for NRC to Perform Detailed Review of Gessar Ii.Ssar Should Be Amended to Include Info within 3 Months from Docketing Date)
  • ML20135H364  + (Forwards Request for Addl Info Required to Evaluate Util 850523 Request Under 10CFR20.302(a) to Dispose of Low Level Radioactivity Contaminated Sewage Sludge by Land Application Onsite)
  • ML19220C388  + (Forwards Request for Addl Info Required for OL Review)
  • ML16340A541  + (Forwards Request for Addl Info Required for Reviewing Application)
  • ML20009A769  + (Forwards Request for Addl Info Requiring Response by 810717 for Completion of Environ Rept Evaluation Re Aquatic Ecology & Maint of Licensing Review Schedule)
  • ML20040C334  + (Forwards Request for Addl Info Resulting from Pnl Review of FSAR Initial Test Program)
  • ML18018A737  + (Forwards Request for Addl Info Resulting from 830728 Audit of Class I Piping Design Documentation.Timely Response Should Be Submitted to Meet Target Date of Nov 1983 for SER Issuance)
  • ML19338D033  + (Forwards Request for Addl Info Resulting from FSAR Review. Outstanding Items Include Assessment of Degree of Damage Due to Tornado Generated Missiles & Description of Amplification Factors Used in Plant Design)
  • ML20054H345  + (Forwards Request for Addl Info Resulting from Geosciences Branch Review.Items Re Proprietary Seismic Reflection Lines Should Be Treated Soon Due to Extensive Time That May Be Needed to Acquire Records)
  • ML20236K448  + (Forwards Request for Addl Info Specified in Encl to Ltr Re Exemption from Financial Protection Requirement Limits of 10CFR50.54(w) & 10CFR140.11,as Detailed in Ltr ,as Supplemented on 980618 & 25)
  • ML17326B374  + (Forwards Request for Addl Info Supplementing 860516 & 1010 & 870528 & 1110 Responses to IE Bulletin 85-003, Motor- Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Setting)
  • ML18032A447  + (Forwards Request for Addl Info Supporting Util 870211 Submittal Re Process Control Program (PCP) for Demineralizer Resin Dewatering.Nrc Understands That Present PCP May Be Revised or Replaced in Short Term)
  • ML13330B233  + (Forwards Request for Addl Info Supporting 870325 Submittal Re Transient Torsional Stresses in Crankshafts of Tdi Diesel Engines Uses as Emergency Generators at Plant.Response Requested within 60 Days)
  • ML17216A686  + (Forwards Request for Addl Info Supporting Util 860708 Submittal Re Increasing Reload Fuel Enrichment,Including Description of Critical Experiments Used for Benchmarking to Validate Simulation of Fuel Storage Rack Features)
  • ML20032A569  + (Forwards Request for Addl Info Supporting 810107 Application to Amend Certificate of Compliance 6601 for Model CNS 8-120. Info Requested Concerns Evaluation & Revision of 30-ft End Drop)
  • ML20235Y032  + (Forwards Request for Addl Info Supporting Util 831105,850527 & 0726 Responses to Item 2.2 (Part 2) of Generic Ltr 83-28, Vendor Interface (Programs for All Safety-Related Components). Response Requested by 60 Days of Ltr Receipt)
  • ML20237J093  + (Forwards Request for Addl Info Supporting Util 860515,0716, 1001 & 1226 & 870327 Responses to IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings)
  • ML20235F838  + (Forwards Request for Addl Info Supporting Pump & Valve Inservice Testing Program Submittals.Encl Listed Questions Should Serve as Basis for Draft Responses for Requested Meeting at Plant Site)
  • ML20040H039  + (Forwards Request for Addl Info Through C-E Owners Group on C-E Heated Junction Thermocouple Reactor Vessel Level Measurement Sys.Response Requested within 30 Days to Complete Generic Review of CEN-181-P)
  • ML20205J273  + (Forwards Request for Addl Info Transmitted on 990224 to T Silko of Vermont Yankee Nuclear Power Corp.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI)
  • ML17164B033  + (Forwards Request for Addl Info Transmitted by Facsimile on 990504,to M Crowthers of Pp&L,Inc.Review of RAI Would Allow Licensee Opportunity to Clarify Their Understanding of Staff Questions & Agree Upon Schedule to Response to RAI)
  • ML17290B046  + (Forwards Request for Addl Info Which Needed to Complete Response to Bulletin 90-01,Suppl 1, Loss of Fill-Oil in Transmitter Manufactured by Rosemount)
  • ML19210A581  + (Forwards Request for Addl Info as Discussed at 681219 Meeting W/Util.Requests Early Submittal of Preliminary Designs Re Airplane Hardening of Critical Structures & Reactor Bldg Fan Coolers)
  • ML20003G441  + (Forwards Request for Addl Info as Part of Evaluation of SEP Topics VII-1.A & VII-2.Requests Response within 30 Days to Maintain Present SEP Review Schedule)
  • ML16340A993  + (Forwards Request for Addl Info as Part of NRC Licensing Review.Includes Info Re Installation of Insp Ports,Plugging of Row 1 Steam Generator Tubes & Replacement of Control Rod Guide Tube Support Pins)
  • ML20213D406  + (Forwards Request for Addl Info as Result of Reactor Sys Branch Review Conducted W/Help of DOE Savanah River Lab)
  • ML19241B539  + (Forwards Request for Addl Info as Result of Mechanical Engineering Branch Review of Fsar.Requests Amend to FSAR to Include Requested Info)
  • ML17276B424  + (Forwards Request for Addl Info as Result of NRC Review of Application for OL)
  • ML20010E878  + (Forwards Request for Addl Info as Result of Review of Re Reactor Protection Sys Power Monitoring Design Mod)