SEP 8 1982 4
l t Decketlllesh50440/4417
[
Hr. Dalwyn R. Davidson Vice President t
I System Engineering & Construction i
The Cleveland Electric Illuminating Company l
P. O. Box 5000 j
Cleveland, Ohio 44101 i
l
Dear Mr. Davidson:
f
Subject:
Identification Additional Information Required to Resolve Perry
[
SER Confirmatory Issue No. 21 (Section 13.5.2.2, Reanalysis of
)
Transients and Accidents: Development of Emergency Operating i
Procedures)
I l
The additional information listed in Enclosure 1 is required by the NRC staff to address the Perry SER Confirmatory Issue No. 21.
Please
,I advise the project manager, John J. Stefano, when we may expect to receive this additional information within 5 days after receipt of this letter.
Sincerely, i
I A. Schwencer, Chief Licensing Branch No. 2 i
Division of Licensing
[
Enclosure:
As stated
{
cc: See next page DISTRIBUTION:
l Document Control (50-440/441) OELD NRC PDR I&E L PDR ACRS (16)
NSIC Region III PRC DZiemann LB#2 R/F JClifford EHylton
,f h
L JStefano Y (
\\\\
i LB#2 DV.+0,.......
L L
..J,S,t,e,f,a,ng,/.r.;,kab,,,,A,S,,, we,nc,ey omcr >
.......f...
su:,m.. >
9/ R
/82 9/ n
/82 eao,ago2,2 e=ogoe 1-E [DR ADDCK 050M OFFICIAL RECORD COPY uso m ini-m m
4 Perry Mr. Dalwyn R. Davidson Vice President, Engineering The Cleveland Electric Illuminating Company P. O. Box 5000 Cleveland, Ohio 44101 cc: Gerald Charnoff, Esq.
Shaw, Pittman, Potts & Trowbridge 1800 M Street, N. W.
Washington, D. C. 20006 Donald H. Hauser, Esq.
The Cleveland Electric Illuminating Company P. O. Box 5000 Cleveland, Ohio 44101 Resident Inspector's Office U.S. Nuclear Regulatory Commission Parmly at Center Road Perry, Ohio 44081 Donald T. Ezzone, Esq.
Assistant Prosecuting Attorney 105 Main Street Lake County Administration Center Painesville, Ohio 44077 l
Daniel D. Wilt, Esq.
l P. O. Box 08159 Cleveland, Ohio 44108 Ms. Sue Hiatt OCRE Interim Representative 8275 Munson l
Mentor, Ohio 44060 l
l Terry Lodge, Esq.
l 915 Spitzer Building Toledo, Ohio 43604 John G. Cardinal, Esq.
Prosecuting Attorney Ashtabula County Courthouse Jefferson, Ohio 44047
s 9
n
~
}
REQUEST FOR ADDITIONAL INFORMATION SER ITEM 13.5.2.2 j
PERRY NUCLEAR POWER PLANT, UNITS 1 AND 2 q
l 640.1.
Provide a procedures generation package to include the'following items:
I a.
Plant-Specific Technical Guidelines:
Since CEI has committed to using the generic General Electric Technical Guidelines, this consists of a description of the planned method for developing plant-specific emergency operating procedures (EOPs) from the generic guidelines, including plant-specific information, b.
Writer's Guide, detailing the specific methods for preparing E0Ps based on the Technical Guidelines.
c.
A description of the E0P validation program.
d.
A brief description of the E0P training program.
640 2.
Provide your Reactivity Control (ATWS) procedure.
The procedure should meet the requirements of IE Bulletin 80-17, " Failure of j
Control Rods to Insert During a Scram at a BWR".
~
i h--m.,~.m
. _...