Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Request for Addl Info Re Waste Mgt Facility Sar. W/O Encl". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20044H342  + (Forwards Request for Addl Info Re Util Submittal, Integrated Plant Assessment Methodology,Vol 1:Sys, Structures & Components Screening)
  • ML20197D441  + (Forwards Request for Addl Info Re Util Submittals Concerning Corrosion Due to Chloride Contamination,For Response within 45 Days of Ltr Date)
  • ML20213H105  + (Forwards Request for Addl Info Re Util Steam Generator Tube Analysis,Per 860108,0211,0401 & 0904 Submittals.Response Requested within 45 Days of Ltr Receipt to Continue Review on Current Schedule)
  • ML15264A521  + (Forwards Request for Addl Info Re Util Second 10-yr Interval Inservice Insp Relief Requests.Response Requested within 60 Days of Ltr Date)
  • ML19210C908  + (Forwards Request for Addl Info Re Util Use of Containment Purge & Vent Sys)
  • ML20154B474  + (Forwards Request for Addl Info Re Util Vessel Support Embrittlement Issue within 60 Days of Ltr Receipt.Inclusion of Info in Next Update of FSAR in Chapter 200 or 201 Also Requested)
  • ML13331B161  + (Forwards Request for Addl Info Re Util on plant- Specific ATWS Mitigation Sys Actuation Circuitry,For Response within 30 Days of Receipt of Ltr)
  • ML20154N751  + (Forwards Request for Addl Info Re Util on Fire Protection Requirements of 4,160 Volt Switchgear Room. Response Requested within 30 Days of Ltr Receipt)
  • ML20216C507  + (Forwards Request for Addl Info Re Utilities Summary Rept Addressing GL 87-02,unresolved Safety Issue A-46. Specifically,Operator Actions Specified in Rept in Order to Make Safety Determination)
  • ML20127B332  + (Forwards Request for Addl Info Re Valve Test Pressure in Order to Complete Review of 850115 Request for Rev to Permanent Test Program for Valve MO-8812.W/o Encl)
  • ML20236Q414  + (Forwards Request for Addl Info Re Various Submittals Describing & Analyzing Electrical Isolation Between Reactor Protection Sys & Nonsafety Sys,Per SEP Topic VII-I.A. Response Requested by 871215)
  • ML19256A173  + (Forwards Request for Addl Info Re Vendor Rept WCAP-7800,Nuc Fuel Div Quality Assurance Prog,Which Is Under Review)
  • ML20196E770  + (Forwards Request for Addl Info Re Vendor 871130 Submittal of Amend 12,Chapter 10 of Sys 80+ CESSAR-DC.Response Requested within 90 Days of Ltr Date)
  • ML20214U096  + (Forwards Request for Addl Info Re Verification & Validation of Facility Safety Monitoring Sys (Psms V & V))
  • ML20198F197  + (Forwards Request for Addl Info Re Verification That Meteorological Parameters Will Be Monitored in Control Room & Will Include Wind Speed,Wind Direction & Temp Difference)
  • ML18039A268  + (Forwards Request for Addl Info Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment & USI A-46. Info Re Operator Actions Required Prior to Closure of Issue)
  • ML20211A725  + (Forwards Request for Addl Info Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors for Three Mile Island Nuclear Station,Unit 1 Submitted on 950511)
  • ML20207K077  + (Forwards Request for Addl Info Re Vessel Pressurizer Heater Failures.Use of Encl Request as Agenda for 870108 Site Meeting to Discuss Heater Failures Suggested)
  • ML18031B086  + (Forwards Request for Addl Info Re Vol 3 to Nuclear Performance Plan.Preliminary Review Completed)
  • ML20155K488  + (Forwards Request for Addl Info Re Vols 1 & 2 to Topical Rept PGE-1012, Trojan Nuclear Plant Fire Protection Plan, for Response within 60 Days)
  • ML20028A390  + (Forwards Request for Addl Info Re WCAP-9863(P), Rod Bank Worth Measurements Utilizing Bank Exchange)
  • ML19341B390  + (Forwards Request for Addl Info Re WPPSS-QA-004,Revision 4, Operational QA Program Description.Commitment Required Re Education & Experience for Director Position)
  • ML18009A438  + (Forwards Request for Addl Info Re Wakesouth Regional Airport Hazards Study to Complete Review of 900117 Results of Aircraft Hazards Study)
  • ML13310A426  + (Forwards Request for Addl Info Re Waste Solidification Process Control Program to Complete Review)
  • ML19326D835  + (Forwards Request for Addl Info Re Waste Gas Sys)
  • ML19329A360  + (Forwards Request for Addl Info Re Waste Mgt Facility Sar. W/O Encl)
  • ML20062F100  + (Forwards Request for Addl Info Re Water Hammer Prevention Per Event at Krsko Reactor in Yugoslavia.Test Plan to Verify That Water Hammer Will Not Occur Should Be Provided)
  • ML19345G063  + (Forwards Request for Addl Info Re Waterside Corrosion.Info Needed to Complete Evaluation of 801121 Info Re Reload 7)
  • ML17258A895  + (Forwards Request for Addl Info Re Welding & Nondestructive Exam Engineer Responsibility Transfer from QA Group to Maint Group.Response Requested within 60 Days to Complete Review of Suppl 4,Revision 7 to OL Application Technical Suppl)
  • ML20031A814  + (Forwards Request for Addl Info Re Westinghouse Basic Safety Rept Re Cycle 5 Reload)
  • ML20195J229  + (Forwards Request for Addl Info Re Westinghouse Owners Group Generic License Renewal Program Topical Rept Entitled, License Renewal Evaluation Aging Mgt for Reactor Vessel Internals)
  • ML20151X172  + (Forwards Request for Addl Info Re Westinghouse Topical Rept WCAP-15063-P, Westinghouse In-Reactor Creep Model. Response Should Be Directed to NRC Document Control Desk)
  • ML20035C603  + (Forwards Request for Addl Info Re Westinghouse AP600 Design. Addl Info Needed in Areas of ITAAC (Q100.9) Instrumentation & Controls (Q420.9-Q420.93) & Human Factors Engineering (Q620.51),as Result of Review of June 1992 Application)
  • ML20205M920  + (Forwards Request for Addl Info Re Westinghouse Topical Rept WCAP-14404-P, Methodology for Incorporating Hot Leg Nozzle Gaps Into Bash)
  • ML20151T144  + (Forwards Request for Addl Info Re Westinghouse TR WCAP-14483, Generic Methodology for Expanded Core Operating Limits Rept)
  • ML20132D292  + (Forwards Request for Addl Info Re Westinghouse QA Program to Complete Initial Safety Review of Topical SAR for Westinghouse MC-10 Cask for ISFSI (Dry Storage))
  • ML20195C984  + (Forwards Request for Addl Info Re Westinghouse Analyses & Util Explanation on Changes in delta-T.Response to Request Should Be Submitted within 45 Days of Ltr Receipt)
  • ML20237D572  + (Forwards Request for Addl Info Re Westinghouse Advanced PWR RESAR SP-90.Response Requested within 90 Days of Ltr Date)
  • ML17083B848  + (Forwards Request for Addl Info Re Wet Reracking.Info Should Be Provided at 870122 Meeting & Documented by Ltr)
  • ML19332G346  + (Forwards Request for Addl Info Re Whether Failure of Any non-Category I Equipment,Resulting in Flooding or Release of Chemicals,Could Jeopardize Safe Shutdown of Facility.Review Should Include Listed Sys)
  • ML20205J337  + (Forwards Request for Addl Info Re Wolf Creek Generating Station IPEEE & 971208 Response to RAI from NRC Re Ipeee. RAI & Schedule for Response Were Discussed with T Harris on 990405)
  • ML17194A601  + (Forwards Request for Addl Info Re XN-NF-81-76 Dresden Unit 3 Cycle 8 Reload Analysis, Revision 1)
  • ML19297F734  + (Forwards Request for Addl Info Re XN-NF-82-25(P), Generic Mechanical Design,Exxon 17x17 Fuel Assembly. Requests Date for Planned Submittal of Info.Proprietary Questions Withheld)
  • ML18051A880  + (Forwards Request for Addl Info Re Xnb Correlation for Facility Application.Response by 840511 Requested)
  • ML19262A392  + (Forwards Request for Addl Info Re Y-pattern Globe & Swing Check Msivs.Generic Review Noted Failure of Type of MSIV During Routine Plant Startup)
  • ML20043E619  + (Forwards Request for Addl Info Re YAEC-1710, Yankee Nuclear Power Station Pilot Evaluation Rept for License Renewal. Issues Will Be Discussed at Meeting to Be Held in June 1990)
  • ML20055J265  + (Forwards Request for Addl Info Re Yankee Rowe Severe Accident Closure Submittal.Questions Concern Individual Plant Exam,Containment Performance Improvement Program & Accident Mgt.Response Requested within 1 Month)
  • ML19294B815  + (Forwards Request for Addl Info Re a Main Steam Line & Spent Fuel Tube & Transfer Areas.Info Should Be Received by 800317)
  • ML20034H506  + (Forwards Request for Addl Info Re an Amend to QA Program Approval 0238,to Include Design & Fabrication Activities. Info Must Be Provided within 45 Days from Date of Ltr)
  • ML20035F104  + (Forwards Request for Addl Info Re an Amend to Certificate of Compliance 9221 for Model NRBK-41 Package)
  • ML17216A704  + (Forwards Request for Addl Info Re anti-reverse Rotation Devices in Reactor Coolant Pumps Recently Found to Be Degraded.Requests Response within 60 Days of Ltr Receipt)