Forwards Request for Addl Info Re Vol 3 to Nuclear Performance Plan.Preliminary Review Completed
ML18031B086
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 12/09/1986
From: Grotenhuis M
Office of Nuclear Reactor Regulation
To:
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8612170356
Download: ML18031B086 (5)


Text

DEC 9 1986 Dockets Nos: 50-259/260 5 296 Manager of Nuclear Power Tennessee Valley Authority 6N 38A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801 Dear Sir

SUBJECT:

BROWNS FERRY NUCLEAR PLANT UNITS 1, 2 and 3

Re:

Nuclear Performance Plan Volume 3 (NPP)

By letter dated August 28, 1986 you transmitted the NPP.

We have completed our preliminary review of the NPP and have sent requests for additional information dated October 3 and 21, 1986.

With the enclosed request for additional information we have completed our preliminary review.

Our review schedule will depend upon a timely response to these requests.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, Otlglhal~ g Marshall Grotenhuis, Project Manager BWR Project Directorate 82 Division of BWR Licensing Enclosure as stated:

cc:

Next page KBarr,RI I/SRConnel ly,OIA GZech,RII/BJYoungblood,NRR TAlexion,NRR/AIgnatonis,RII DMuller/WECampbell,OI DB :PD//2 DBL:PD DB '82 S

1s MGrgtenhuis/cd ld/8'l86

(<I ~ /86 i

/86 DISTRIBUTION

~F, NRC PDR/Local PDR EJordan/BGrimes JPartlow/MGrotenhuis RMBernero/OGC-Bethesda SNorris/PD82 Plant Files ACRS (10)

HDenton,NRR/HThompson,NRR SRichardson,IE/BHayes,OI NGrace,RII/LSpessard,DI JHolonich,NRR/CStahle,NRR TKenyon,NRR/WLong,NRR RWessman,NRR/GGears MJCampagnone DBL:PQQ

~ g g Cj/86 OFFICIAL RECORD COPY Bbi2i70356 8bi20'V r oa moocah osoao~sw, P

PDR

E 1

r H

p I4 I

t I

Tl

Manager of Nuclear Power Tennessee Valley Authority Browns Ferry Nuclear Plant Units 1, 2, and 3

CC:

General Counsel Tennessee Valley Authority 400 Commerce Avenue E 11B 330

'Knoxville, Tennessee 37902 R.

W. Cantrell Acting Director, Nuclear Engineering Tennessee Valley Authority 400 West Summit Hill Dirve, W12 A12 Knoxville, Tennessee 37902 R. L. Gridley Tennessee Valley Authority 5N 1578 Lookout Place Chattanooga, Tennessee 37402-2801 M. J.

May Tennessee Valley Authority Browns Ferry Nuclear Plant Post Office Box 2000

Decatur, Alabama 35602 H. P.

Pomrehn Tennessee Valley Authority Browns Ferry Nuclear Plant Post Office Box 2000

Decatur, Alabama 35602
Chairman, Limestone County Commission Post Office Box 188
Athens, Alabama 35611 Ira L. Meyers, M.D.

State Health Officer State Department of Public Health State Office Building Montgomery, Alabama 36130 Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 2900 Atlanta, Georgia 30303 Mr. Steven Roessler U. S. Nuclear Regulatory Commission Reactor Training Center Osborne Office Center, Suite 200 Chattanooga, Tennessee 37411 Resident Inspector U. S. Nuclear Regulatory Commission Route 2, Box 311

Athens, Alabama 35611

P Il C

t

pe RfqII O

A.

A D$g 4~

~O

"**++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Enclosure RE VEST FOR ADDITIONAL INFORMATION NUCLEAR PERFORMANCE PLAN VOLUME 3 BROWNS FERRY NUCLEAR PLANT DOCKET NOS. 50-259, 50-260, AND 50-296 2.

The root cause of many problems at Browns Ferry Nuclear Plant (BFN) was attributed to lack of clear lines of authority.

The Site Director of BFN must interface with many of the corporate level directors.

Please clarify how this will be accomplished.

The Nuclear Performance Plan shows that a number of managerial positions are being filled by contract individuals.

Provide a description of the actions that will be taken at BFN if such individuals were to terminate or be reassigned.

3.

Clarify the functions and reporting relationship of the BFN health physics organization in relation to the Radiological Assessor since it is not clear in the Nuclear Performance Plan.

4.

The Engineering Assurance (EA) Organization is responsible for administration and management of the gA program as applied to TVA nuclear engineering and design activities.

EA personnel assigned to BFN report to the Site quality Manager on matters related to the BFN gA program.

Administrative direction regarding BFN EA 'activities and functions is provided to EA by the BFN Project Engineer.

Describe the procedures that will be used to ensure that there is no ambiguity in reporting relationships.

Does the Manager of Engineering Assurance report to both the Director of Nuclear equality Assurance and the Director of Engineering?

Explain how this dual reporting role will be handled.

5.

Clarify the functions and reporting relationships of the Unit Maintenance groups and the maintenance department under the Maintenance Superintendent.

For which functions will the different maintenance groups interface and how will they interface?