June 8, 1988 I
Docket NO.:
50-344 Mr. David W. Cockfield Vice President, Nuclear Portland General Electric Company 121 S.W. Salmon Street Portland, Oregon 97204
Dear Hr. Cockfield:
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION - TROJAN FIRE PROTECTION PLAN (TAC NO. 66379)
By letter dated June 30, 1987, Portland General Electric Company (PGE) submitted its updated version of Topical Report PGE-1012. "Trojan Nuclear Plant Fire Protection Plan," Volumes 1 and 2.
On April 20-21, 1988, our consultant (T. Storey-SAIC) visited Trojan and discussed various issues related to our review of PGE-1012 with members of your staff.
Based on these discussions, we find that additional information is required before we can complete our review. We ask that you provide the requested information contained in Enclosure 1 within 60 days from receipt of this letter, or provide an a!ternative schedule for doing so within 15 days.
The reporting and/or recoraPeeping requirements of this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
Sincerely, original signed by Terence L. Chan, Project Manager Project Directorate Y Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
As stated cc: w/ enclosure See next page DISTRIBUTION CDocket File "t OGC-White Flint
~NRC &'L"ocal'PDRs EJordan
~
PDS Reading JPartlow DCrutchfield ACRS(10)
GHolahan TChan JLee
/d DRSP/P V' R I D:PDV f ghton i
TChan:dr 6/J/88 6/(/88 8806210242 880600 PDR ADOCK 050 4
June 8, 1988 Docket N0.:
50-344 Mr. David W. Cockfield Vice President, Nuclear Portland General Electric Company 121 S.W. Salmon Street Portland, Oregon 97204
Dear Mr. Cockfield:
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION - TROJAN FIRE PROTECTION PLAN (TAC NO. 66379)
By letter dated June 30, 1987, Portland General Electric Company (PGE) submitted its updated version of Topical Report PGE-1012, "Trojan Nuclear PlantFireProtectionPlan}"Volumes 1and2. On April 20-21, 1988, our consultant (T. Storey-SAIC visited Trojan and discussed various issues related to our review of PGE-1012 with members of your staff.
Based on these discussions, we find that additional information is required before we can complete our review. We ask that you provide the requested information contained in Enclosure 1 within 60 days from receipt of this letter, or provide an alternative schedule for doing so within 15 days.
The reporting and/or recordkeeping regt,l aments of this letter affect fewer than ten respondents; therefore, OMB clearai.ne is not required under P.L.96-511.
Sincerely, original signed by i
Terence L. Chan, Project Manager i
Project Directorate Y Division of Reactor Projects - III, j
IV, V and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
As stated cc: w/ enclosure See next page DISTRIBUTION Docket File OGC-White Flint NRC & Local PDRs EJerdan PDS Reading JPartlow DCrutchfield ACRS(10)
GHolahan TChan JLee
' /f DRSP/P V' R
D:PDV Tchan:dr ighton 6///88 6/ /88
p% Kf 0p
~%
UNITED STATES
[
g NUCLEAR REGULATORY COMMISSION g
E WAFHINGTON, D. C. 20$55 June 8, 1988 Docket N0.: 50-344 Mr. David W. Cockfield Vice President, Nuclear Portland General Electric Company 121 S.U. Salmon Street Portland, Oregon 97204
Dear Mr. Cockfield:
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION - TF3JAN FIRE PROTECTION PLAN (TAC NO. 66379) l By letter dated June 30, 1987, Portland General Electric Company (PGE) submitted its updated version of Topical Report PGE-1012, "Trojan Nuclear PlantFireProtectionPlan}"Volumes 1and2.
On April 20-21, 1988, our consultant (T. Storey-SAIC visited Trojan and discussed various issues related to our review of PGE-1012 with membera of your staff.
Based on these discussions, we find that additional information is required before we can complete our review. We ask that you provide the requested infoiw tion contained in Enclosure I within 60 days from receipt of this letter, or provide an alternative schedule for doing so within 15 days.
The reporting and/or recordkeeping requirements of this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
Since ely W
T rence L. Chan, Project Manager Project Directorate Y Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
As stated cc: w/ enclosure See next page y
,y,w, 7
g y
---m
+
l s
Mr. David W. Cockfield Portland General Electric Company Trojan Nuclear Plant t
cc:
Senior Resident Inspector U.S. Nuclear Regulatory Commission Trojan Nuclear Plant Post Office Box 0 Rainier, Oregon 97048 Mr. Michael J. Sykes, Chairman Board of County Commissioners Columbia County St. Helens, Oregon 97501 Mr. William T. Dixon Oregon Department of Energy Salem, Oregon 97310 Regional Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 1
ENCLOSURE 1 REQUEST FOR ADDITIONAL INFORMATION FIRE PROTECTION PLAN REVIEW TROJAN NUCLEAR PLANT PORTLAND GENERAL ELECTRIC COMPANY 1.
Provide supporting documei6ation which demonstrates that penetration 603A is a rated configuration. The type of documentation provided should be equivalent to that which is available for all rated penetrations on site.
2.
Provide the results of the analyses which demonstrates that the exterior boundaries of fire areas are either rated or that they have been evaluated to provide the necessary protection from exterior hazards.
3.
Provide documentation which demonstrates that the cable wrap systems used in the plant provide the proper rating in the configurations in which they are used.
4.
Identify which NFPA codes have been compared with current plant design.
If code compliance evaluations have not been performed, indicate when they will be performed in the future.
5.
Provide a discussion on how the various engineering evaluations are referenced in PGE 1012 or other documents which would tie them into the fire protection program. A flow chart of fire protection program documents including engineering evaluations would be helpful.
6.
Provide a discussion of how Trojan fire protection comitments are tracked and how it is ensured that all of these comitments are in PGE 1012.
7.
Provide evaluations regardino conformance to NRC Fire Protection criteria
~
for each of the areas listed below. Where multiple evaluations are within each category, only a single evaluation need be provided.
Fire Area Boundaries - C-FP-1.3.1 Penetration Seals With Less Than 3-HR Rating - C FP-1.3.3 Open Pipe Chase Between Al and A2 - C-FP-1.3.6 Fire Doors - C-FP-1.3.10 Transient Combustibles - C-FP-1.3.16 Train Separation Barriers - C-FP-1.3.16
. ~ -
..