ML20198F197
| ML20198F197 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 12/26/1973 |
| From: | Harold Denton US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Deyoung R US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| CON-WNP-0932, CON-WNP-932 NUDOCS 8605280436 | |
| Download: ML20198F197 (3) | |
Text
s g
OEC 2 G E71 R. C.
DoYoung, Assistant Director for LWRs, Group I, L REQUEST FOR ADDITIONAL INFORMATION PLANT NAME:
WPPSS Nuclear Project No. 1 LICENSING STAGE:
CP DOCKET NUM3ER:
50-460 RESPONSIBLE BRANCH:
LWR # 2-3 REQUESTED COMPLETION DATE:
December 28, 1973 APPLICANTS RESPONSE DATE NECESSARY FOR NEXT ACTION PLANNED ON PROJECT:
As. scheduled DESCRIPTION OF RESPONSE:
Amendment to PSAR REVIE'4 STATUS:
Site Analysis Branch (Meteorology) - Avaiting Information Enclosed is a request for additional information on the subject site.
Please include this in the next list of requests for information transmitted to the applicant.
This request was prepared by R.
A. Kornasiewicz, Site Analysis Branch, L.
Gifdmd s!c xj 1,;r II. II.11cs.t.:n harold R.
Denton, Assistant Director for Site Safety Directorate of Licensing
Enclosure:
As stated cc:
See attached sheet hDR DO K 0 0 go A
!' /
!o l
CLC 2 6 v73 i
R.
C.
DeYoung 2-cc w/o enclosure A.
Giamb us tio W. !!cDonald J. Panzaralle cci w/ enclosure S.
Hanauer i
J. 'dundrie
~4.
P. Getat:111 K. Galler T. Cox A. Kornasiewica R. Klecker D.
Eisunhut J.
Carter S. Varga l
l I
DISTRIBUTION:
L: Docket File L:Rdg L:SAB L AD/SS i
l l
l l
I ohica $')rnas.AB0 N LIS LISAu L:SAB L:AD/SS
}...LDa.....
..iewicz
',A
/
y RA svan=c >
.h.a.s.,,,,,,,,,,
,EHJiar,k,e,e,,,,,,,,H,R,9,,n,9,d..i,1 1,.
,,(1RDe,n,tig,n,,,
- 1..12.../. 2. 6../. 7.. 3.
12../.. 2.. 6..../. 7..3...
12../. '.'.../.. 7 3... 1 2../... ".../. 7.. 3..
m Doess AEC.Ste tRev.943) ABCM 0340 p, s. ootanunt PRDTmG Ot FICE t 19f9 O. 409 344
/
d 16.0 TECH.!!!Al S?ECIFICATIONS 16.3 Provida verification that the meteorological parameters to be monitored in the control room, as described in Section 16.3.11, will include wind speed, wind direction, and temperature difference between the two levels of instrumentation on the meteorological tower.
.