ML13310A426
| ML13310A426 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 05/26/1982 |
| From: | Miraglia F Office of Nuclear Reactor Regulation |
| To: | Bernath L, Cotton G, Dietch R San Diego Gas & Electric Co, Southern California Edison Co |
| References | |
| TAC-57811, TAC-57812 NUDOCS 8206020585 | |
| Download: ML13310A426 (5) | |
Text
DISTRIBUTIUN-:
I R Document Control (50-361)
NRC PDR MAY 26 198 L PDR LB#3 File NSIC JLee TERA HRood Docket No. 50-361 Attorney, OELD I&E ACRS(16)
Mr. Robert Dietch Mr. Gary D. Cotton Vice President Mr. Louis Bernath Southern California Edison Company San Diego Gas & Electric Company 2244 Walnut Grove Avenue 101 Ash Street Post Office.Box 800 Post Office Box 1831 Rosemead, California 91770 San Diego, California 92112 Gentlemen:
Subject:
Request for Additional Information - Process Control Program License condition 2.c(16) of the San Onofre Unit 2 operating license states that:
"Wet" solid radwaste shall not be shipped from the facility until the NRC has approved the waste solidification Process Control Program.
In order to complete our review of the Process Control Program, we need the information described in the enclosure. Please provide the requested information as soon as possible, so that we may complete our review and satisfy the above license condition. If you have any questions regarding this request, please contact the San Onofre 2 Project Manager.
Sincerely, Orignal signedby Frank J. Miraglia, Chief Licensing Branch No. 3 Division of Licensing
Enclosure:
As stated cc:
See next page
'RECEIVED, 8206020 S5f M
OFFICEO.#LDL LDL..
SURNAME 1. -H ~
~ z.
.1.i a...
....................I..
DATE 1
...5//82......... 5./82....
NRC FORM 318 o1080) NRCM 0240 OFFICIAL RECORD COPY USGPO:1980-329-824
Mr. Robert Dietch Vice President Southern California Edison Company 2244 Walnut Grove Avenue P. 0. Box 800 Rosemead, California 91770 1r.
Gary D. Cotton Mr. Louis Bernath San Diego Gas & Electric ComDoany 101 Ash Street P. 0. Box 1831 San Diego, California 92112 cc:
Charles R. Kocher, Esq.
James A. Beoletto, Esq.
Southern California Edison Company 2244 '.Walnut Grove Avenue P. 0. Box 800 Rosemead, California 91770 Orrick, Herrington & Sutcliffe ATTN:
David R. Pigott, Esq.
600 Montgomery Street San Francisco, California 94111 Mr.
George Caravalho City !Manager City of San Clemente 100 Avenido Presidio San Clemente, California 92672 Alan R. Watts, Esq.
Rourke & Woodruff Suite 1020 1055 North Main Street Santa Ana, California 92701 Lawrence Q. Garcia, Esq.
California Public Utilities Commission 5056 State Building San Francisco, California 94102 Mr. V. C. Hall Combustion Engineering, Incorporated 1000 Prospect Hill Road Windsor, Connecticut 06095
-2 cc:
Mr. S. McClusky Bechtel Power Corporation P. 0. Box 60860, Terminal Annex Los Angeles, California 90060 Mr. Mark Mecford Southen-California Edison Company 2244 Walnut Grove Avenue P. 0. Box 800 Rosemead, California 91770 Henry Peters San Diego Gas & Electric Company P. 0. Box 1831 San Diego, California 92112 Ms. Lyn Harris Hicks Advocate for GUARD 3908 Calle Ariana San Clemente, California 92672 Richard J. Wharton, Esq.
'Uriversity of San Diego School of Law tnvironmental Law Clinic San Diego, California 92110 Phyllis M. Gallagher, Esq.
Suite 222 1695 West Crescent Avenue Anaheim, California 92701 Mr. A. S. Carstens 2071 Caminito Circulo Norte Mt. La Jolla, California 92037 Resident Inspector, San Onofre/NPS c/o U. S. Nuclear Regulatory Commission P. 0. Box 4329 San Cl.emente, California 92672 Charles E. McClung, Jr., Esq.
Attorney at Law 24012 Calle de la Plata Suite 330 Laguna Hills, California 92653
ETSB QUESTIONS ON PROCESS CONTROL PROGRAM FOR THE CNSI CEMENT SOLIDIFICATION PROGRAM
- 1. Describe how you propose to comply with the interface requirements spelled out in the CNSI topical report for their Cement Solidifica tion System.
- 2. Provide tables showing how the utility equipment, components, struc tures and services that interface with the mobile cement system comply with the applicable criteria of Reg. Guide 1.143, Rev. 1, October 1979, "Design Guidance for Radioactive Waste Management Systems, Structures and Components Installed in Light-Water-Cooled Nuclear Power Plants" and Branch Technical Position ETSB 11-3, Rev. 2, July
- 1981, "Design Guidance for-Solid Radioactive Waste Management Systems Installed in Light-Water-Cooled Nuclear Power Plants".
- 3. Describe how the plant design, as it relates to the Cement Solidifica tion System, reflects consideration of the following design features intended to maintain occupational radiation exposures ALARA:
a) Minimizing the length of piping runs b) Avoiding low points and dead legs in piping c) Using larger diameter piping to minimize plugging
- 4. Clarify whether heat tracing has been incorporated for tanks that contain evaporator concentrates that are likely to solidify at ambient temperatures.
- 5. Describe the equipment, components or structures and services you provide for containing radioactive spills that may occur in the port able system.
- 6. If within the utilities scope of supply, describe the plant inspection program to ensure that cement and/or conditioning chemicals are main tained at proper quality during the time they are stored.
- 7. Describe how the curie content and identification of radionuclides in each container are determined prior to shipment.