Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20092H133 + (Forwards Plant Physical Security & Contingency Plan Re Amend 29 for Hand Geometry Biometrics Sys.Encl Withheld,Per 10CFR73.21)
- NRC-95-0024, Forwards Plant Physical Security Plan,Rev 25.Encl Withheld + (Forwards Plant Physical Security Plan,Rev 25.Encl Withheld)
- ELV-01388, Forwards Plant Pipe Break Isometrics,Vols 1 & 2 & Advises That Encl Figures Have Been Revised to Be Consistent W/Pipe Analysis in Effect at Time That Unit 2 Received Ol,Including Revs Through 890930.W/309 Oversize Figures + (Forwards Plant Pipe Break Isometrics,Vols 1 & 2 & Advises That Encl Figures Have Been Revised to Be Consistent W/Pipe Analysis in Effect at Time That Unit 2 Received Ol,Including Revs Through 890930.W/309 Oversize Figures)
- ML17264A218 + (Forwards Plant Pressure & Temperature Limits Rept Table I of Draft Generic Ltr Published in Fr for Public Comments on 950602)
- ML18058A462 + (Forwards Plant Pressurized Thermal Shock Interim Safety Evaluation,Per 920506 Telcon Request)
- NRC-88-0102, Forwards Plant Preventive Maint Program Status Rept for Feb 1988,per NRC 871009 Request + (Forwards Plant Preventive Maint Program Status Rept for Feb 1988,per NRC 871009 Request)
- L-94-292, Forwards Plant Procedures & Training Material Provided for Preparation of Licensing Exams for Reactor Operator Group Xv & SRO Upgrade 94,scheduled for Week of 950227 + (Forwards Plant Procedures & Training Material Provided for Preparation of Licensing Exams for Reactor Operator Group Xv & SRO Upgrade 94,scheduled for Week of 950227)
- ML17277A534 + (Forwards Plant Procedures 1.3.1,1.3.6,1.3.7,1.3.8,1.3.9 & 1.5.1 to Close Out SER (NUREG-0892) Confirmatory Issue 22, Assurance of ESF Functioning (II.K.1.5) & Safety-Related Sys Operability Status (II.K.1.10).)
- GO2-83-247, Forwards Plant Procedures 1.3.1,1.3.6,1.3.7,1.3.8,1.3.9 & 1.5.1 to Close Out SER (NUREG-0892) Confirmatory Issue 22, Assurance of ESF Functioning (II.K.1.5) & Safety-Related Sys Operability Status (II.K.1.10) + (Forwards Plant Procedures 1.3.1,1.3.6,1.3.7,1.3.8,1.3.9 & 1.5.1 to Close Out SER (NUREG-0892) Confirmatory Issue 22, Assurance of ESF Functioning (II.K.1.5) & Safety-Related Sys Operability Status (II.K.1.10))
- ML18033A274 + (Forwards Plant Program for Seismic Qualification of Drywell Steel for Review & Requests Issuance of Written Statement Documenting Programs Acceptability)
- ML18033A276 + (Forwards Plant Program for Seismic Qualification of Drywell Steel for Review & Requests Issuance of Written Statement Documenting Programs Acceptability)
- ML18033A278 + (Forwards Plant Program for Seismic Qualification of Miscellaneous Steel for Review & Requests Issuance of Written Statement Documenting Program Acceptability)
- ML18033A279 + (Forwards Plant Program for Seismic Qualification of Miscellaneous Steel for Review & Requests Issuance of Written Statement Documenting Program Acceptability)
- ML18064A632 + (Forwards Plant Project Plan Re Issues Surrounding Use of Alloy 600 Components)
- ML18064A633 + (Forwards Plant Project Plan Re Issues Surrounding Use of Alloy 600 Components)
- ML20101S761 + (Forwards Plant Proposed Rev to TS Re Spent Fuel Pool Reactivity & FSAR Section 14.7.4.3.1 & Table 14.7.4-1 in Response to 920623 Order.Copy of 920604 SER & Suppl to 920416 Amend Request Will Be Forwarded.W/Certificate of Svc)
- ML20245A147 + (Forwards Plant Radiation Protection Enhancement Program Bimonthly Status Rept for Apr & May 1989)
- ML20210C909 + (Forwards Plant Radiological Effluent & Environ Monitoring Repts for CY85 & CY86,in Response to Concerns Relayed in Congressman Hammerschmidt Re Safe Plant Operation & Giant Cancers on Local Fish.Concerns W/O Foundation)
- ML20154B648 + (Forwards Plant Radiological Emergency Communication Sys Telephones & Speakers,Per Officials of State of Ny Knowledge.W/O Stated Encls.W/Certificate of Svc.Related Correspondence)
- ML20009F859 + (Forwards Plant Radiological Emergency Response Plan Per 810324 & 0620 Document Production Requests.Svc List Encl. W/O Plan)
- ML20237C009 + (Forwards Plant Reactor Coolant Pump Trip Issue Clarification in Response to 861230 Request for Addl Info Per Generic Ltr 85-12 Re TMI 11.K.3.5, Automatic Trip of Reactor Coolant Pumps)
- ML20151Q528 + (Forwards Plant Readiness Review Program Review Schedule & Identification of Technical Reviewers Responsibilities Re Module 17/19 Concerning Electrical Raceways & Supports,Per Agreement Reached on 880125 W/Util)
- ML20214R876 + (Forwards Plant Readiness Team Insp Rept 50-255/86-35 on 861216-870213 & Notice of Violation.Matl Condition of Plant Will Be Adequate to Support Restart Upon Completion of Outstanding Prestart Commitments.W/O Notice)
- L-83-264, Forwards Plant Recovery Plan Presented at 830425 Meeting Re Reactor Vessel Internals & Thermal Shield,In Response to Item C of .Plan Will Be Revised Daily W/Updates Provided Upon Availability + (Forwards Plant Recovery Plan Presented at 830425 Meeting Re Reactor Vessel Internals & Thermal Shield,In Response to Item C of .Plan Will Be Revised Daily W/Updates Provided Upon Availability)
- ML20204B624 + (Forwards Plant Referenced Simulation Facility Four Year Performance Testing Rept, Per 10CFR55.45(b)ii)
- PLA-2575, Forwards Plant Rept Summarizing Safety Evaluations Approved for 1984 + (Forwards Plant Rept Summarizing Safety Evaluations Approved for 1984)
- ML20151V033 + (Forwards Plant Resident Status Rept for 880723-0808)
- BECO-89-057, Forwards Plant Response to Final Station Blackout Rule & Implementation of Blackout Requirements + (Forwards Plant Response to Final Station Blackout Rule & Implementation of Blackout Requirements)
- ML18101A815 + (Forwards Plant Response to GL 95-03 Re Circumferential Cracking of SG Tubes Evaluations & Plans Developed)
- LIC-95-0126, Forwards Plant Response to GL 95-03, Circumferential Cracking of SG Tubes + (Forwards Plant Response to GL 95-03, Circumferential Cracking of SG Tubes)
- ML18064A829 + (Forwards Plant Response to GL 95-03, Circumferential Cracking of SG Tubes)
- HNP-95-059, Forwards Plant Response to GL 95-03, Circumferential Cracking of SG Tubes + (Forwards Plant Response to GL 95-03, Circumferential Cracking of SG Tubes)
- ML20086M077 + (Forwards Plant Response to NRC RAI Re Previous Responses to GL 92-08 on Thermo-Lag 330 Fire Barriers)
- ML20211B116 + (Forwards Plant Restart Action Plan,For Review & Approval. Restart Action Plan Status Will Be Updated on an as-required Basis.Minor Revs Will Be Made by Panel W/O Seeking Addl Formal Approval)
- ML20197A890 + (Forwards Plant Restart Action Plan,For Review & Approval. Restart Action Plan Status Will Be Updated on as Required Basis)
- ML18040A159 + (Forwards Plant SALP Rept for 930815-950128,rating Plant Performance in Areas of Operations,Maint,Engineering & Plant Support.Concludes Good Performance But Concern Expressed Over Adverse Impact of Personnel Errors)
- ML17290B148 + (Forwards Plant SALP Rept for Period 930301-940331.Concludes That Considerable Challenges Continue to Face Util)
- ML20196B542 + (Forwards Plant SRO & RO Initial Exam Rept 50-293/98-301OL During Wk of 981016-23)
- ML20237B059 + (Forwards Plant Safety Monitoring Sys Verification & Validation Plan.Plan Currently in Effect & All Activities Identified in Plan Will Be Implemented Prior to End of First Refueling Outage)
- ML20215B722 + (Forwards Plant Scenario/Controller Package for 870728 Emergency Preparedness Exercise.Nrc Exercise Exit Scheduled for 870729.W/o Encl)
- ML20151H166 + (Forwards Plant Scenario/Controller Package for 880524 Annual Exercise.Editorial Improvement May Be Made to Package Before Exercise Date.Requests That Info Provided to TR Decker Be Withheld from Public Disclosure.Encl Withheld)
- ML19310A328 + (Forwards Plant Security Personnel Training & Qualification Plan.Sl Daltroff Affidavit Encl.Plan Withheld (Ref 10CFR2.790))
- ML20087H480 + (Forwards Plant Security Safeguards Event Log for First Quarter of 1995)
- ML20248B063 + (Forwards Plant Semiannual Radiological Environ Operating Rept for Jan-June 1989)
- GO2-98-214, Forwards Plant Simulation Facility Four Year Rept,Per 10CFR55.45(b)(5)(ii) + (Forwards Plant Simulation Facility Four Year Rept,Per 10CFR55.45(b)(5)(ii))
- L-92-257, Forwards Plant Site Dune Survey for 920825-26.Dune Condition Acceptable Per Criteria in Unit 1 TS 5.1.3,since Average Values of Results Greater than or within Range Provided in Unit 1 Updated Fsar,Section 2.4.2.2 + (Forwards Plant Site Dune Survey for 920825-26.Dune Condition Acceptable Per Criteria in Unit 1 TS 5.1.3,since Average Values of Results Greater than or within Range Provided in Unit 1 Updated Fsar,Section 2.4.2.2)
- ML20149M803 + (Forwards Plant Specific ECCS Evaluation Changes 10CFR50.46 Rept)
- ML20107M377 + (Forwards Plant Specific ECCS Evaluation Changes Per 10CFR50-46)
- ML20078S259 + (Forwards Plant Specific Fracture Mechanics Assessment as Attachment to to Nrc.Info Contained in Encl Rept Believed to Be True & Reliable)
- ML20212J439 + (Forwards Plant Specific Info for ATWS Mitigation Sys Actuation Circuitry (AMSAC) Per 10CFR50.62.Installation of AMSAC Scheduled for Sixth & First Refueling Outages for Units 1 & 2,respectively)
- ML20129J772 + (Forwards Plant Specific Info from T00DEE2 Hot Rod Heatup Calculations Re Calculated Peak Clad Temp)