d m /3
JUN 1
1987
Docket No. 50-255
Consumers Power Company
ATTN:
Dr. F. W. Buckman
Vice President
Nuclear Operations
212 West Michigan Avenue
Jackson, MI 49201
Gentlemen:
This refers to the special plant readiness team inspection conducted
by Messrs. W. Guldemond, H. A. Walker, S. A. Reynolds, A. Dunlop and
Miss C. D. Anderson of this office during the period of December 16, 1986,
through February 13, 1987, of activities at the Palisades Nuclear Generating
Plant authorized by NRC Provisional Operating License No. DPR-20 and to the
discussion of our findings with Mr. J. F. Firlit at the conclusion of the
inspection.
The purpose of this inspection was to determine whether the
licensee had made sufficient progress in improving the material condition
of the Palisades facility and solving design issues to support restart and
whether adequate assurances had been provided that an acceptable level of
material condition would be maintained to support continued safe and reliable
operation.
The enclosed copy of our inspection report with its three attachments
identifies areas examined during the inspection. Within these areas,
the inspection consisted of a selective examination of procedures and
representative records, observations, and interviews with personnel.
It was the conclusion of the inspection team that upon completion of
outstanding prestart commitments, the material condition of the plant would
be adequate to support plant restart.
Further adequate commitments have
been made to reasonably traintain an acceptable level of material condition
to support continued safe and reliable plant operation.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice.
A written response
is required.
In addition, your previous response to violation 255/85003-21
was judged to be inadequate as discussed in Paragraph 7.g of the enclosed
violation. you are requested to submit an additional response to this
report and
In accordance with 10 CFR 2.790 of the Commission's regulations a copy of
thisletter,theenclosures,andyourresponsetothisletterwIllbeplaced
in the NRC Public Document Room.
0706090030 G70601
g\\g
ADOCK 0500
5
gDR
160/
-
-
JUN 1
1987
Consumers Power Company
2
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
CRIGINAL SIGNED BY C. E. NORELIUS
Charles E. Norelius, Director
DivisionofReactorProjects
Enclosures:
1.
2.
Inspection Report with Attachments
No. 50-255/86035(DRP)
cc w/ enclosure:
Mr. Kenneth W. Berry, Director
Nuclear Licensing
J. F. Firlit, General Manager
'
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service Commission
Nuclear Facilities and
Environmental Monitoring
Section
RIII
RII
d
s/Ims
Mn