Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Insp Findings & Licensee Ack on 860417.No Violations Noted". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20137B728  + (Forwards Insp 99901005/85-01 on 850711-12 & 0805-09 & Notices of Nonconformance & Violation)
  • ML20042D795  + (Forwards Insp 99990001/90-04 on 900224.No Violations Noted)
  • ML20198L901  + (Forwards Insp 99990001/98-15 for Women Inst for Fertility on 981201.No Violations Noted.Insp Results Do Not Constitute Approval by NRC of Manner Radioactive Matl Left Outside Facility in Public Domain)
  • U-601073, Forwards Insp Actions Taken for Plant BWR Stainless Steel Piping,Per Generic Ltr 84-11 on Igscc.Actions Taken to Mitigate IGSCC During Const Recommended by Rev 1 to NUREG-0313  + (Forwards Insp Actions Taken for Plant BWR Stainless Steel Piping,Per Generic Ltr 84-11 on Igscc.Actions Taken to Mitigate IGSCC During Const Recommended by Rev 1 to NUREG-0313)
  • ML20198B151  + (Forwards Insp Activity Plan for Next 6 Months & Plant Issues Matrix.Infor Provided to Minimize Resource Impact on Staff & to Allow for Scheduling Conflicts & Personnel Availability to Be Resolved in Advance of Inspector Arrival Onsite)
  • ML20206R908  + (Forwards Insp Criteria to Be Used During Future Insp of Oconee Activities)
  • ML20148S328  + (Forwards Insp Data & Conclusions for EDG Exhaust Insp Conducted During First Ten Year Insp Interval at Seabrook Station on 960624.Concluded That EDG Exhaust Elbow Is Acceptable for Continued Operation)
  • ML20217F581  + (Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys)
  • ML20117B383  + (Forwards Insp Data Package for Weld 22-22 to Detect Igscc. Info Provided to Support Preliminary Insp Summary.Flaw Analysis & Overlay Design Rept Will Be Submitted Separately)
  • IR 05000329/1982011  + (Forwards Insp Evaluation Forms Filed for IE Insp Repts 50-329/82-11 & 50-330/82-11,50-329/82-17 & 50-330/82-17, 50-329/82-19 & 50-330/82-19 & 50-329/83-03 & 50-330/83-03)
  • ML17321A928  + (Forwards Insp Fee Per Invoice 1613V)
  • AECM-87-0203, Forwards Insp Fee for Facility for 861221-870328,per Bill Number 2068A  + (Forwards Insp Fee for Facility for 861221-870328,per Bill Number 2068A)
  • ML19254D343  + (Forwards Insp Fees)
  • W3P86-1682, Forwards Insp Fees for Invoice 1611W  + (Forwards Insp Fees for Invoice 1611W)
  • ML18142A018  + (Forwards Insp Fees for Surry Power Station & North Anna,Unit 1 for Mar 1983 - Mar 1984 & North Anna,Unit 2 for Apr 1983 - Apr 1984)
  • ML20072N790  + (Forwards Insp Fees for Unit 1 from Mar 1982 - Mar 1983 & Unit 2 from Apr 1982 - Apr 1983)
  • ML20129A161  + (Forwards Insp Fees,Representing Billing for Insps Completed Between 840930-1222.Detailed Accounting Requested)
  • ML20128A037  + (Forwards Insp Field Notes & NRC Forms 591 & 766 Associated W/Field Insp of Western Stress,Inc at Hess Oil Refinery in St Croix,Vi.W/O Encls)
  • ML20128A767  + (Forwards Insp Field Notes & NRC Forms 591 & 766 Associated W/Field Insp of Nordion Intl at Baxter Healthcare Corp (Region 2 Irradiator Licensee))
  • ML20126J481  + (Forwards Insp Findings & Licensee Ack Re 640805 Insp of License 50-10023-01.No Items of Noncompliance Noted)
  • ML20133B539  + (Forwards Insp Findings & Licensee Ack of License 29-12649-02 on 690501)
  • ML20198Q908  + (Forwards Insp Findings & Licensee Ack of General License 99990004/86-04 on 860414.No Violations Observed)
  • ML20198T278  + (Forwards Insp Findings & Licensee Ack of General License for Nelson Electric Div on 860415.No Violations Noted)
  • ML20125A391  + (Forwards Insp Findings & Licensee Ack on 841207 of License)
  • ML20205B624  + (Forwards Insp Findings & Licensee Ack on 850822 of License SNM-1387)
  • ML20198Q343  + (Forwards Insp Findings & Licensee Ack on 860417.No Violations Noted)
  • ML20205C962  + (Forwards Insp Findings & Licensee Ack on 850815-0904 of License 21-03194-04.No Noncompliance Noted)
  • ML20132D210  + (Forwards Insp Findings & Licensee Ack on 850716-0912 of License 34-11852-02)
  • ML20132D215  + (Forwards Insp Findings & Licensee Ack on 850716-0912 of License 34-11852-02)
  • ML20205N474  + (Forwards Insp Findings & Licensee Ack on 860425 of QA Program 99990003.No Violations Noted)
  • ML20207J630  + (Forwards Insp Findings & Licensee Ack on 860506,for Signature.Violations Should Be Corrected within 30 Days.W/O Encl)
  • ML20195E416  + (Forwards Insp Findings & Licensee Ack on 860506 of General License.No Violations Observed)
  • ML20202F674  + (Forwards Insp Findings & Licensee Ack on 860624 of License 50-23453-01.Signature Required)
  • ML20197C184  + (Forwards Insp Findings & Licensee Ack.Signature Constitutes Agreement to Correct Violation Discovered During Insp 99990004/86-01 on 860414.W/o Encl)
  • ML20236S676  + (Forwards Insp Followup Item List Requested for Plant)
  • ML20127C048  + (Forwards Insp Guidance for Outage Team Insp Based on PWR Generic PRA Insights Study & Available Shutdown Risk Study Results,Per Request)
  • ML20234D868  + (Forwards Insp Guidance for Use in Conducting Insp of Pool Irradiators Greater than 10,000 Ci.Nrc Should Be Notified of Program Deficiencies Detected as Result of New Procedures for Development of Licensee Corrective Action Plan)
  • ML19221A235  + (Forwards Insp Plan IP-1 for Operating Reactors in PA, Effective Immediately)
  • ML20116M248  + (Forwards Insp Plan Matrix for Tdi Diesel Engine Quality Revalidation.Diesel 2A Teardown & Insp Should Be Completed by 850701.Diesel 2B Insp Will Begin When Diesel 2A Returned to svc.Marked-up FSAR Page Encl)
  • ML20137V045  + (Forwards Insp Plan Re PPR Completed on 970312.Review Provides Regional Mgt W/Current Summary of Licensee Performance & Serve as Inputs to NRC SALP & SMM Review)
  • ML18153A515  + (Forwards Insp Plan Re PPR of Plant.Review Provides Regional Mgt W/Current Summary of Licensee Performance & Serve as Inputs to NRC SALP & SMM Reviews)
  • ML18012A617  + (Forwards Insp Plan Re Ppr,Completed 970313.Insp Plan Covers Period Oct 1996 to Mar 1997)
  • ML14178B036  + (Forwards Insp Plan Re Ppr,Completed 970313.Insp Plans Covers Period Oct 1996 to Mar 1997)
  • ML20043B049  + (Forwards Insp Plan for Assessment of Weld Quality at Plant, Per H Myers Request)
  • ML20205C219  + (Forwards Insp Plan for Completing Reinsp Program,Based on Previous Insp Results,Review of Rept on Byron QC Inspector Reinsp Program & Discussions W/Div of Projects & Resident Programs)
  • ML20127L841  + (Forwards Insp Plan for Facility Which P Michaud Developed for Current Fy Ending on 930930.Plan Based on Mc 2560, Decommissioning Insp Program)
  • ML20126A314  + (Forwards Insp Plan for Fsv,Developed for Current Fiscal Yr Ending 930930.Plan Based on Mc 2560,Decommissioning Insp Program)
  • ML17300B255  + (Forwards Insp Plan for Maint Rule Baseline Insp at Plant to Be Conducted 960715-19.Info Includes Insp Scope,Background, Insp Methodology & Guidance,Schedule,Team Composition & Site Logistics)
  • ML20198B241  + (Forwards Insp Plan for Next 6 Months & Plant Issues Matrix. Info Provided to Minimize Resource Impact on Staff & to Allow for Scheduling Conflicts & Personnel Availability to Be Resolved in Advance of Inspector Arrival Onsite)
  • ML20198B153  + (Forwards Insp Plan for Next 6 Months & Plant Issues Matrix. Info Provided to Minimize Resource Impact on Staff & to Allow for Scheduling Conflicts & Personnel Availability to Be Resolved in Advance of Inspector Arrival Onsite)
  • ML20148Q427  + (Forwards Insp Plan for Piping Susceptible to IGSCC for Spring 1988 Refueling Outage,Per Generic Ltr 84-11. Concurrence Requested within 30 Days)